Sub topic 10
Checking That the Fix Worked
A countermeasure is only useful if it reduces the problem and keeps it reduced. This chapter assumes that you understand basic process inputs, steps, and outputs, and that you can describe a defect or incident. It also assumes that you have built a 5 Whys chain and identified a process cause.
Define What “Worked” Means
Before changing the process, define the result you expect. A statement such as “the process is better” is too vague to test. Use an operational definition, which is a precise rule for deciding whether an event occurred.
For example:
- Defect: a shipment contains a part different from the customer order.
- Measure: defective shipments divided by all shipments.
- Target: fewer than 1 defective shipment per 1,000 shipments.
- Time window: the next 30 operating days.
- Scope: shipments packed at the affected warehouse.
Record the baseline before applying the countermeasure. The baseline is the process result before the change. Without it, a later result has no clear comparison.
| Item | Example |
|---|---|
| Baseline period | 30 operating days before the change |
| Baseline result | 8 wrong-part shipments out of 4,000 |
| New result | 1 wrong-part shipment out of 4,200 |
| Target | No more than 1 per 4,000 shipments |
| Decision | Continue monitoring and investigate the remaining event |
A rate is often more useful than a count because the amount of work may change. In the example, the baseline rate is 8 divided by 4,000, or 0.20%. The new rate is about 0.024%.
Build a Verification Plan
A verification plan connects the countermeasure to observable evidence. Write it before reviewing the results so that you do not change the success rule after seeing the data.
Include these details:
- Measure: What will be counted or calculated?
- Data source: Which system, form, audit, or log provides the data?
- Owner: Who records and reviews the result?
- Frequency: How often will the result be checked?
- Target: What result counts as effective?
- Duration: How long must the result remain acceptable?
- Escalation rule: What happens if the result worsens?
For the bin-location example, the team might inspect every move ticket for two weeks, then audit a sample of 20 tickets each week for two months. The check should confirm both the outcome and the behavior that should produce it. A lower defect rate alone may hide missing records or a temporary drop in workload.
shipments_before = 4000
defects_before = 8
shipments_after = 4200
defects_after = 1
before_rate = defects_before / shipments_before
after_rate = defects_after / shipments_after
print(f"Before: {before_rate:.3%}")
print(f"After: {after_rate:.3%}")
target_rate = 1 / 4000
effective = after_rate <= target_rate
print(f"Meets target: {effective}")Check the Result Over Time
One good day does not prove that a countermeasure worked. Compare equivalent periods and look for a stable pattern. Use the same definition, population, and data collection method before and after the change.
A simple run chart, which plots a measure in time order, can show whether defects fell and stayed low. For processes with enough data, a control chart can help distinguish normal process variation from a real change. Do not treat random variation as proof that the countermeasure caused the improvement.
Handle Weak or Mixed Results
If the target is missed, first check the measurement system. Confirm that the data covers the intended period, that people use the same defect definition, and that the sample is large enough to support the conclusion.
If the process step was not followed, the countermeasure may need clearer instructions, training, an error-proofing device, or an ownership change. If the step was followed but the defect continued, the 5 Whys chain may have stopped at an intermediate cause. Reopen the analysis with the new evidence.
When the target is met, update the standard work, communicate the change, and assign a later review date. A fix that works for one month but is abandoned later has not controlled the cause permanently.
Exercise
A warehouse had 6 wrong-part shipments in 3,000 shipments before a countermeasure and 2 in 3,000 afterward. The target is at most 1 per 3,000. What should the team conclude?
Show answer
The result improved from 0.20% to about 0.067%, but it did not meet the target. The team should check whether the countermeasure was followed, verify the data, and continue the investigation rather than declare success.