Sub topic 6
A Worked Example from Start to Finish
Assume you know the basics of a process, including its inputs, steps, and outputs. You should also be familiar with incidents or defects that can be described using records such as logs, forms, or system data.
The example below starts with a specific problem and follows the evidence until it reaches a process cause. The goal is not to ask exactly five questions. The goal is to find a cause that explains the problem and can be changed.
Start with an observable problem
A useful problem statement describes what happened, where, and when:
> Order 4471 shipped with the wrong part on 12 March.
This statement does not blame the packer. It describes an outcome that can be checked in the order record and shipment history.
The team confirms that the customer ordered part A41, but the shipment contained part A14. The pick log shows that the packer picked from bin 14. The correct part was stored in bin 41.
Build the causal chain
The team asks why the wrong part was shipped. Each answer must explain the previous answer and include evidence.
Problem: Order 4471 shipped with the wrong part on 12 March.
Why 1: Why was the wrong part shipped? Because the packer picked from bin 14 instead of bin 41. (Evidence: pick log)
Why 2: Why was bin 14 picked? Because the pick list showed bin 14 for this part number. (Evidence: pick list printout)
Why 3: Why did the pick list show bin 14? Because the part was moved to bin 41 and the warehouse system was not updated. (Evidence: move ticket, system record)
Why 4: Why was the system not updated? Because the bin-move procedure has no step that requires a system update. (Evidence: procedure document, revision 3)
Root cause: The bin-move procedure does not require a system update.
Countermeasure: Add a required system-update step to the procedure and a check before the move ticket is closed.This chain stops at four whys because the fourth answer identifies a process condition the organization can control. Asking a fifth question might produce a deeper cause, such as why the procedure was written that way. That question is useful only if it helps create a stronger countermeasure.
Check each answer
A chain is weak when an answer is an assumption. For example, “The packer was careless” does not explain why the system gave the wrong location. It also points toward blaming a person instead of improving the process.
Use evidence for each link:
| Chain link | Evidence | What it confirms |
|---|---|---|
| Wrong bin was picked | Pick log | The recorded picking action |
| Pick list showed bin 14 | Pick list printout | The instruction available to the packer |
| Part moved to bin 41 | Move ticket and system record | The location mismatch |
| Procedure lacked an update step | Procedure revision 3 | The process weakness |
A small review script can flag incomplete chains:
chain = [
{"why": "Why was the wrong part shipped?",
"because": "The packer picked from bin 14.",
"evidence": "pick log"},
{"why": "Why was bin 14 picked?",
"because": "The pick list showed bin 14.",
"evidence": "pick list printout"},
{"why": "Why did the pick list show bin 14?",
"because": "The system was not updated after the move.",
"evidence": ""},
]
def unverified_steps(chain):
return [i + 1 for i, step in enumerate(chain)
if not step["evidence"].strip()]
print(unverified_steps(chain)) # [3]The result identifies the third step as unverified. The team must find the relevant record or revise the answer before treating the chain as complete.
Turn the cause into a testable fix
The countermeasure should match the cause. Adding a required system-update step addresses the missing instruction. Requiring a check before closing the move ticket creates a control that can detect an incomplete move.
The team can then define an effectiveness check:
- Review all bin moves for the next 30 days.
- Confirm that each move has a matching system update.
- Track wrong-part shipments separately.
- Reopen the analysis if the defect recurs or the control is bypassed.
Exercise
The system showed the old bin after a part was moved. The procedure required a system update, but the employee skipped it. What should you investigate before blaming the employee?
Show answer
Check whether the procedure was available, understood, and followed in similar moves. Also check whether the system allowed the move to close without an update. The cause may include training, system design, workload, or supervision.