Sub topic 3
Variable Cost: What Grows With Output
Prerequisites and the basic idea
This chapter assumes that you understand the short run, fixed cost, total cost, and how a firm turns inputs into output. In the short run, at least one input is fixed. Other inputs can change as the firm changes its output.
Variable cost is the cost of inputs that change when output changes. A firm that produces more usually uses more labor, materials, fuel, packaging, or electricity. These inputs create variable cost.
For example, a bakery may have a fixed monthly rent. The flour, sugar, packaging, and hourly labor used to bake more bread are variable costs.
The firm's total variable cost (TVC) is the cost of all variable inputs used at a particular output level. At zero output, TVC is usually zero because the firm does not use production inputs. Total cost combines fixed and variable cost:
TC = TFC + TVC
where TFC is total fixed cost.
From input use to variable cost
Suppose labor is the only variable input. If each worker costs $100 per day and the firm uses L workers, then:
TVC = $100 × L
The amount of output produced by those workers depends on the production process. Therefore, variable cost depends on output indirectly:
output → variable input needed → variable cost
A firm may need only a few workers to produce its first units. As it tries to produce more with a fixed factory, additional workers may add less output than earlier workers. The firm then needs increasingly more labor for each additional unit. Variable cost rises more quickly.
A variable-cost schedule
A cost schedule lists cost measures at different quantities. The following example uses a variable-cost function:
TVC(Q) = Q³ - 6Q² + 15Q
Here, Q is output. The function is only an example of a production-cost relationship. It says how much the firm's variable inputs cost at each quantity.
| Output Q | Total variable cost | Average variable cost |
|---|---|---|
| 1 | 10 | 10.0 |
| 2 | 14 | 7.0 |
| 3 | 18 | 6.0 |
| 4 | 28 | 7.0 |
| 5 | 50 | 10.0 |
Average variable cost (AVC) is variable cost per unit of output:
AVC = TVC / Q
In this schedule, AVC first falls from $10 to $6. The firm spreads its variable-input costs over more output, and production may become more efficient. After output reaches 3 units, AVC rises. The firm must use variable inputs less productively, so each unit costs more on average.
Computing variable cost with Python
This program prints TVC and AVC for quantities from 1 through 8.
def tvc(q):
return q**3 - 6*q**2 + 15*q
print(" Q TVC AVC")
for q in range(1, 9):
variable_cost = tvc(q)
average_variable_cost = variable_cost / q
print(f"{q:2} {variable_cost:5} {average_variable_cost:5.1f}")The change in TVC between two neighboring quantities gives the marginal cost (MC) when output changes by one unit:
MC = change in TVC / change in Q
Fixed cost does not affect this change because it remains constant. Therefore, when output changes, the change in total cost equals the change in variable cost.
Common errors
- Do not treat rent for a fixed facility as variable cost merely because the firm produces more. It remains fixed during the period being studied.
- Do not confuse TVC with AVC. TVC is the total cost of variable inputs; AVC divides that amount by output.
- Do not assume that variable cost must rise at a constant rate. Diminishing marginal returns can make it rise faster at higher output.
- Include the opportunity cost of variable resources when measuring economic cost. Using an owner's labor without paying cash still has a cost if that labor could earn income elsewhere.
Exercise
A firm has total variable cost of $72 when it produces 12 units. What is its average variable cost, and what happens to AVC if TVC stays $72 while output rises to 18 units?
Show answer
AVC is $72 / 12 = $6 per unit. At 18 units, AVC is $72 / 18 = $4 per unit, so average variable cost falls because the same variable cost is spread over more units.