Sub topic 1
Running a First Kaizen Event: What a Kaizen Event Is and When to Use One
Prerequisites
This chapter assumes you know basic process improvement ideas such as waste and continuous improvement. You should be able to read a simple flowchart, do arithmetic on times and counts, and have worked in or near an operational process.
What a kaizen event is
A kaizen event is a short, focused improvement workshop, usually three to five days long. A cross-functional team changes one process and measures the result. It differs from daily improvement, which is small and continuous, and from a large project, which often runs for months.
Use an event when a process has a clear problem, the scope fits in one week, and people from several functions are needed to fix it.
Seeing value and waste in a process
Value-added work is any step the customer would pay for. Non-value-added work is everything else. Common waste types include waiting, rework, extra motion, overproduction, and unnecessary handoffs.
steps = [
{"name": "Enter order", "minutes": 10, "value_added": True},
{"name": "Wait for approval", "minutes": 90, "value_added": False},
{"name": "Re-key address", "minutes": 15, "value_added": False},
{"name": "Send confirmation", "minutes": 5, "value_added": True},
]
total = sum(s["minutes"] for s in steps)
value = sum(s["minutes"] for s in steps if s["value_added"])
print(f"Value-added: {value} of {total} minutes ({value / total:.1%})")Running this prints Value-added: 15 of 120 minutes (12.5%). Most of the waste here is waiting.
Choosing the right process and scope
Pick a process with a measurable problem, a clear start point, and an end point. Make sure the people who run it can attend during the event week. Exclude steps owned by other departments unless those departments send someone to the team.
Writing the event charter
A charter is a one-page document. It states the problem, the scope, measurable goals with baselines, and the owners.
event_name: Reduce order-entry lead time
problem_statement: Orders take a median of 4 hours to confirm.
scope:
start: Order received in the shared inbox
end: Confirmation sent to the customer
out_of_scope:
- Credit approval
- Shipping
goals:
- metric: Median lead time
baseline: 4 hours
target: 2 hours
sponsor: Operations manager
facilitator: Continuous improvement leadBuilding the team and assigning roles
- Sponsor: owns the result and removes blockers.
- Facilitator: runs the agenda and keeps the team on method.
- Team leader: owns the process and approves changes.
- Members: four to eight people who do the work or touch it, drawn from different functions.
Exercise
The 120-minute order process above has 15 minutes of value-added work. A team cuts the 90-minute approval wait to 30 minutes. What is the new value-added percentage?
Show answer
The new total is 10 + 30 + 15 + 5 = 60 minutes. Value-added share is 15 / 60 = 25%.