Sub topic 13
Pp and Ppk: How They Differ from Cp and Cpk
You should already know how to calculate a mean and standard deviation and understand the basic idea of a normal distribution. Familiarity with control charts is helpful. This chapter assumes that you know specification limits and the meaning of LSL, the lower specification limit, and USL, the upper specification limit.
Two Views of Process Performance
Cp and Cpk use the within-subgroup standard deviation. This estimates the short-term variation when measurements are taken close together under similar conditions. These indices answer:
> If the process stays stable in its current short-term condition, how well could it fit the specifications?
Pp and Ppk use the overall standard deviation. This includes short-term variation plus changes between subgroups, such as shifts between operators, batches, days, or machines. These indices answer:
> How well did the complete collection of data perform over the period measured?
The formulas have the same structure:
| Index | Formula | Variation used |
|---|---|---|
| Cp | `(USL - LSL) / (6σwithin)` | Within-subgroup |
| Cpk | `min((USL - mean)/(3σwithin), (mean - LSL)/(3σwithin))` | Within-subgroup |
| Pp | `(USL - LSL) / (6σoverall)` | Overall |
| Ppk | `min((USL - mean)/(3σoverall), (mean - LSL)/(3σoverall))` | Overall |
The letter C is commonly associated with capability, while P is associated with performance. In practice, organizations sometimes use different naming conventions, so always check the method used in the report.
Why the Results Can Differ
Suppose a process has a small amount of variation within each day but its daily average moves up and down. The within-subgroup estimate sees only the small daily spread. The overall estimate also sees the movement between daily averages.
If the process is stable, Cp may be close to Pp and Cpk may be close to Ppk. If Ppk is much lower than Cpk, the process has additional long-term variation or instability.
A lower Ppk does not identify the cause by itself. Possible causes include:
- Changes in raw materials or environmental conditions
- Different operators or equipment settings
- Tool wear over time
- Measurement-system changes
- A process shift that a control chart would reveal
The comparison is a diagnostic clue, not proof of a specific cause.
Worked Example
Assume the specification limits are 9.85 and 10.15, the process mean is 10.02, the within-subgroup standard deviation is 0.05, and the overall standard deviation is 0.07.
mean = 10.02
lsl = 9.85
usl = 10.15
sigma_within = 0.05
sigma_overall = 0.07
cp = (usl - lsl) / (6 * sigma_within)
cpk = min(
(usl - mean) / (3 * sigma_within),
(mean - lsl) / (3 * sigma_within),
)
pp = (usl - lsl) / (6 * sigma_overall)
ppk = min(
(usl - mean) / (3 * sigma_overall),
(mean - lsl) / (3 * sigma_overall),
)
print(f"Cp={cp:.2f}, Cpk={cpk:.2f}")
print(f"Pp={pp:.2f}, Ppk={ppk:.2f}")The results are approximately:
- Cp = 1.00 and Cpk = 0.87
- Pp = 0.71 and Ppk = 0.62
The process is already marginal in the short term because Cpk is below the common 1.33 benchmark. Its long-term performance is worse because the overall standard deviation is larger. The gap between Cpk and Ppk suggests variation between subgroups.
Choosing the Right Index
Use Cp and Cpk when you want to evaluate potential short-term capability and have a justified within-subgroup estimate. Use Pp and Ppk when you want to report the actual performance of all measurements over a time period.
Report the data window, subgroup definition, standard deviation method, and specification limits with the index. Without this information, two apparently different results may simply use different methods.
Exercise
A process has Cpk = 1.50 and Ppk = 0.95. What does the difference suggest?
Show answer
The process has good short-term capability but poorer overall performance, suggesting additional between-subgroup variation, shifts, or other long-term changes.