Sub topic 6
Cp: Tolerance Width Versus Process Spread
This chapter assumes you can calculate a mean and standard deviation, read specification limits, and recognize the basic shape of a normal distribution. A control chart is helpful because Cp is meaningful only when the process is stable.
What Cp measures
A process produces measurements that vary naturally. The customer or design usually defines an acceptable interval:
- LSL is the lower specification limit.
- USL is the upper specification limit.
- Tolerance width is
USL - LSL.
Cp compares this tolerance width with the process's natural spread. For an approximately normal process, the natural spread is estimated as six standard deviations:
Cp = (USL - LSL) / (6 × sigma_within)Here, sigma_within is the short-term standard deviation inside stable subgroups. It estimates the variation caused by the process when major changes over time are excluded.
A Cp of 1 means the specification width is exactly six standard deviations wide. A larger Cp means the specifications are wider compared with the process spread. A smaller Cp means the process spread is too large for the available tolerance.
A worked calculation
Suppose a shaft diameter has these requirements:
| Quantity | Value |
|---|---|
| LSL | 9.85 mm |
| USL | 10.15 mm |
| Within-process standard deviation | 0.05 mm |
The tolerance width is:
10.15 - 9.85 = 0.30 mmThe natural process spread is:
6 × 0.05 = 0.30 mmTherefore:
Cp = 0.30 / 0.30 = 1.00The process spread uses the entire tolerance width. If the distribution is normal and centered, its tails will reach the specification limits. In practice, this leaves little protection against shifts, changes in variation, or estimation error.
You can calculate Cp with Python:
def cp(usl, lsl, sigma_within):
if sigma_within <= 0:
raise ValueError("sigma_within must be positive")
if usl <= lsl:
raise ValueError("USL must be greater than LSL")
return (usl - lsl) / (6 * sigma_within)
print(round(cp(usl=10.15, lsl=9.85, sigma_within=0.05), 2))The result is 1.0.
Interpreting Cp
Common planning benchmarks are useful, but they are not universal rules.
| Cp value | Typical interpretation |
|---|---|
| Less than 1.00 | The natural spread is wider than the tolerance |
| 1.00 | The natural spread equals the tolerance |
| 1.33 | Often considered a capable target for routine production |
| 1.67 or higher | More protection against variation is available |
A high Cp does not prove that every item meets specifications. Cp measures spread only. It does not use the process mean, so it cannot tell whether the process is centered between LSL and USL.
> callout note > Cp answers, “Could this process fit inside the tolerance if it were centered?” It does not answer, “Does the current process actually fit?” Cpk adds the effect of centering.
Common errors
- Using a standard deviation calculated from a long time period when the goal is short-term capability. This can mix process shifts with within-process variation.
- Calculating Cp before checking stability. An unstable process does not have one dependable spread.
- Treating Cp as a defect percentage. A defect estimate also requires a distribution model, centering information, and reliable parameter estimates.
- Comparing Cp values from different units without checking that the limits and measurement system are comparable.
Exercise
A stable process has LSL = 98, USL = 102, and sigma_within = 0.5. What is Cp, and what does it indicate?
Show answer
Cp = (102 - 98) / (6 × 0.5) = 4 / 3 = 1.33. The six-sigma spread is about one-third narrower than the tolerance, but centering still needs to be checked with Cpk.