Sub topic 7
Period Start, Period End, and Days in Period
This chapter assumes you know basic Excel formulas, relative and absolute references, and a column-based financial model where periods run from left to right. You should also understand EOMONTH, SUMIFS, YEAR, and MONTH.
A financial model needs more than a row of month-end dates. Each period should have:
- A period start date
- A period end date
- The number of calendar days in the period
These rows support revenue calculations, interest accruals, working-capital movements, and annual summaries.
Build the monthly period rows
Assume cell C2 contains the model start date. The date can be any date in the first month, such as 15-Jan-2025. The first monthly period should still cover the full month of January.
Use columns D onward for the model timeline.
Row 5 (period start):
D5: =EOMONTH($C$2,-1)+1
E5: =D6+1
Row 6 (period end):
D6: =EOMONTH($C$2,0)
E6: =EOMONTH(D6,1)
Row 7 (days in period):
D7: =D6-D5+1Copy the formulas in columns E and beyond to the right.
The formula in D5 finds the end of the month before the model start month, then adds one day. For a January start date, it returns 1-Jan-2025.
The formula in D6 finds the end of the start month. Later period ends use the previous period end as the anchor and move forward one month.
The +1 in the days formula is important. Date subtraction counts the gap between dates. It does not count both endpoints. If a period runs from 1 January through 31 January, D6-D5 equals 30, but the month contains 31 days. Adding one produces the inclusive day count.
| Period | Start | End | Days |
|---|---|---|---|
| January 2025 | 1-Jan-2025 | 31-Jan-2025 | 31 |
| February 2025 | 1-Feb-2025 | 28-Feb-2025 | 28 |
| March 2025 | 1-Mar-2025 | 31-Mar-2025 | 31 |
Format the date rows as dates. Excel stores dates as serial numbers, so an unformatted result may appear as a number such as 45688.
How the periods connect
The next period must start one day after the previous period ends. This creates continuous periods without overlap or gaps.
A useful continuity check is:
E11: =E5-D6For every column after the first, the result should be 1. A result of 0 means the periods overlap. A result greater than 1 means there is a gap.
You can also check that each period end is genuinely a month end:
D12: =D6=EOMONTH(D6,0)The result should be TRUE for every regular monthly period.
Start dates and stub periods
The formulas above create full calendar months even when C2 is mid-month. For example, a start date of 15-Jan-2025 produces a first period from 1 January through 31 January.
A model that begins on 15 January may instead require a stub period, which is a shortened first or last period. In that design, the first period start would be the actual model start date, not the first day of the month. The day count would then be:
=PeriodEnd-ModelStartDate+1Do not mix full-month and stub-period logic accidentally. Decide which convention the model requires before building dependent calculations.
Exercise
For a period starting on 1-Apr-2025 and ending on 30-Apr-2025, what formula returns the correct number of days, and what result should it produce?
Show answer
Use =PeriodEnd-PeriodStart+1. The result is 30.