Sub topic 7
Plotting power and interest
This chapter assumes you can tell stakeholders from publics, you have a list of identified stakeholders, and you can read a simple spreadsheet. It teaches you to place each group on a power-interest grid, read the quadrants, and avoid the common mistakes in rating.
What the grid does
The power-interest grid is a two-axis chart for sorting stakeholders. Each group gets two ratings:
- Power is the ability to affect your organization's goals. A group might hold a decision, a budget, a license, or the means to reach a large audience.
- Interest is how much the group cares about the issue and how closely it follows it. Interest says nothing about whether the group supports you.
The grid answers a practical question: where should limited time and attention go first? A PR team usually cannot give every group a personal briefing, so the grid turns a long list into a few priority tiers.
Power and interest are separate. A regulator may hold the permit and still pay little attention until a complaint arrives. A neighborhood group may watch every update and still have no formal say. Treating the two as one score is the most common source of confusion.
The four quadrants
Splitting each axis at a midpoint gives four quadrants. Each suggests a default approach.
| Quadrant | Power | Interest | Default approach | Typical example |
|---|---|---|---|---|
| Manage closely | High | High | Two-way engagement, early involvement, named relationship owner | City council planning committee |
| Keep satisfied | High | Low | Brief, relevant updates, no surprises, easy access to a contact | Industry trade body |
| Keep informed | Low | High | Regular, clear information and channels for questions | Local residents' association |
| Monitor | Low | Low | Light-touch tracking, general channels | Occasional readers of a newsletter |
The labels are defaults, not rules. They give you a starting point for the engagement strategy covered in a later chapter.
Rating with a 1-5 scale
A numeric scale makes the placement repeatable. Write down what each score means before you rate anyone, so that two team members rating the same group reach similar numbers.
| Score | Power means | Interest means |
|---|---|---|
| 1 | No realistic way to affect the outcome | Unaware or indifferent |
| 2 | Can voice an opinion with little effect | Notices the issue occasionally |
| 3 | Can slow or speed some decisions, or reach a moderate audience | Follows the issue when it surfaces |
| 4 | Can strongly shape a decision or the public conversation | Follows closely and responds |
| 5 | Controls a decision you need, or can block the goal | Acts on the issue repeatedly |
Rate against a specific issue and goal, not against the organization in general. A bank's regulator has high power over a new product launch and little over a charity sponsorship. The same group can land in different quadrants for different issues.
Coding the grid
The following function applies a threshold to each rating and returns the suggested approach. The default threshold of 3 treats a score of 3 as high.
def grid_quadrant(power, interest, threshold=3):
"""Place a stakeholder on a power-interest grid (ratings 1-5)."""
high_power = power >= threshold
high_interest = interest >= threshold
if high_power and high_interest:
return "manage closely"
if high_power:
return "keep satisfied"
if high_interest:
return "keep informed"
return "monitor"
register = [
("Local residents' association", 2, 5),
("City council planning committee", 5, 4),
("Employees at the plant", 3, 5),
("Industry trade body", 4, 2),
]
for name, power, interest in register:
print(f"{name}: {grid_quadrant(power, interest)}")Running it prints:
- Local residents' association: keep informed
- City council planning committee: manage closely
- Employees at the plant: manage closely
- Industry trade body: keep satisfied
Notice the employees. They score exactly 3 on power, so they land in "manage closely". With a threshold of 4 they would move to "keep informed". The function is simple, but the threshold decides the result, and that choice needs a reason.
Choosing the threshold
The cut point is a judgment, and it changes the map. Consider these options.
- Threshold 3. Puts mid-rated groups in the high half. This gives a larger "manage closely" list, which suits a small stakeholder set or a high-risk issue.
- Threshold 4. Keeps the top tier short and focused. This suits a long list when staff time is tight.
- Separate thresholds. You can set a different cut for each axis. If power is rare and decisive, you might set power at 4 and interest at 3.
Whichever you choose, write it in the plan. A reader who sees "manage closely" should be able to see the rule behind it.
Also watch the borderline cases. A group one point either side of the threshold is not meaningfully different from its neighbor. Mark groups at the boundary for a second look rather than trusting the number.
Finding evidence for each rating
Ratings made from gut feeling drift toward whoever the team already knows. Attach a short piece of evidence to every score. The stakeholder register in the next chapter has a column for this.
Useful evidence for power:
- Formal authority, such as a permit, vote, contract, or regulation.
- Control over resources your plan needs.
- Reach, such as audience size for a media outlet or member count for an association.
- Past behavior, such as a previous campaign that delayed a project.
Useful evidence for interest:
- Attendance at meetings or hearings.
- Questions sent to your contact lines or posted on internal channels.
- Media coverage and social media posts on the issue.
- Survey or interview responses.
Here is a minimal record that keeps the ratings and their evidence together.
name,type,interest_1_5,power_1_5,evidence,owner,next_review
Local residents' association,public (active),5,2,"Attended two council meetings on the plant expansion",Community lead,2026-12-15
City council planning committee,stakeholder,4,5,"Holds the permit decision",Government affairs,2026-12-15
Employees at the plant,stakeholder,5,3,"Intranet questions about job security",Internal comms,2026-12-01
Regional newspaper,influencer,3,3,"Ran two stories on the expansion",Media lead,2026-12-01Each row names an owner and a review date. A rating with no evidence is a guess, and a rating with no review date goes stale.
A worked walk-through
Suppose a manufacturer plans to expand a plant, and you are mapping for that issue.
- List the groups. Use your identification work: the council committee, residents, employees, the trade body, and the regional newspaper.
- Rate power. The committee holds the permit decision, so it scores 5. Residents can object formally but do not decide, so they score 2. The newspaper can shape opinion, so it scores 3.
- Rate interest. Residents attended two council meetings and score 5. The trade body has made no statement and scores 2.
- Apply the threshold. With a threshold of 3, the committee is "manage closely", residents "keep informed", the trade body "keep satisfied", and the newspaper "manage closely" at 3 and 3.
- Check the borderline. The newspaper and the employees both sit at 3 on one axis. Discuss them before locking the result.
- Record the reasons. Put the evidence and threshold in the register.
The result is a short, ordered list that the team can defend. When someone asks why residents are not in the top tier, you can point to the power rating and its evidence, and then explain the plan for keeping them informed. That conversation also shows a weakness of the grid, covered next.
Common errors
Confusing interest with support. A highly interested group can be hostile, neutral, or friendly. Record attitude separately, for example in an extra column, because the grid does not capture it.
Ignoring formal versus informal power. A group with no vote can still hold power through reach, expertise, or the ability to organize others. A residents' association may lack legal power and still delay a project through publicity. Rate power as the ability to affect your goal, not only legal authority.
Treating the grid as fixed. Interest rises sharply when an issue becomes personal or visible. A group rated "low interest" in March may be active by June. This movement is the reason the register has a review date.
Rating from the organization's point of view only. Teams often overrate the groups they talk to every week. Check the ratings against outside evidence such as coverage, meeting records, and research findings.
Forgetting overlap. Some people belong to several groups. An employee may also be a local resident. Decide whether you rate roles or individuals, and be consistent.
Using the grid alone. The grid ignores legitimacy and urgency. A small group with a strong moral or legal claim and an urgent need can matter more than its power score suggests. The salience model from the previous chapter covers this, and the two tools work best together.
Combining the grid with salience
The two tools answer different questions. Salience asks how much attention a group is likely to command from managers, using power, legitimacy, and urgency. The grid asks how to treat the group, using power and interest.
A practical order is:
- Rate salience to spot groups with strong claims that the grid might underrate.
- Plot the grid to set the default approach.
- Raise any group that has high legitimacy and urgency, even if its grid score is low.
For example, a small group living beside the plant may have low power but a legitimate and urgent claim about noise. The grid says "keep informed". Salience says to take the group seriously. Use both to decide.
Reading the grid as a team
Plot the grid on a wall chart or shared document and review it with colleagues from different functions. The government affairs lead will see power the media lead misses, and the community lead will see interest the others lack. Disagreements are useful. Where two people rate a group differently, ask for the evidence behind each number and adjust.
Keep the visual simple. Put group names in the quadrant they belong to, use one color per type (stakeholder, public, influencer), and add an arrow where you expect a group to move. An arrow from "monitor" toward "keep informed" tells the reader that a quiet group may soon become active.
Summary of the method
- Fix the issue and goal you are rating against.
- Define the 1-5 scale in writing.
- Rate power and interest for each group, with evidence.
- Choose and document the threshold.
- Flag borderline groups and check them against salience.
- Record owner and review date in the register.
Exercise
A trade body scores power 4 and interest 2. A local environmental group scores power 2 and interest 5 and has raised a legitimate, urgent complaint about water runoff. Using a threshold of 3, which quadrant does each land in, and why might you still treat the environmental group differently from a plain "keep informed" group?
Show answer
The trade body is "keep satisfied" (high power, low interest). The environmental group is "keep informed" (low power, high interest). Its claim is legitimate and urgent, so the salience model suggests it deserves more attention than the grid alone implies. You would raise its priority, for example by assigning an owner and offering direct dialogue, and record the reason in the register.
Exercise
Your team rates employees at power 3 and interest 5, and the code places them in "manage closely". Your manager changes the threshold to 4. What happens, and what should you do before accepting the change?
Show answer
The employees move to "keep informed" because their power of 3 is below 4. Before accepting, check the power evidence, such as their ability to disrupt operations or influence public opinion. Review other borderline groups that also move, and document the new threshold and the reason for it in the plan.