Sub topic 1
Where you start: the SAP ECC landscape
Prerequisites
This chapter assumes you know the following:
- The main SAP ERP modules: finance (FI/CO), logistics (MM, SD, PP) and procurement.
- How a system landscape works: development, quality and production systems linked by transports.
- What custom ABAP code is, and the difference between master data and transactional data.
What ECC is
SAP ERP Central Component (ECC) is the ERP suite most SAP customers ran before S/4HANA. The last release is ECC 6.0, with enhancement packages (EHPs) that added functions without a full upgrade. Most ECC systems you will meet run on ECC 6.0 with EHP 6, 7 or 8.
ECC runs on the SAP NetWeaver application server. It can use many databases, such as Oracle, IBM Db2, Microsoft SQL Server and SAP ASE. SAP HANA is also supported as a database for ECC. This matters later, because "ECC on HANA" is not the same as S/4HANA.
Typical landscape
A normal ECC landscape has three tiers of systems. Changes move from development to quality to production through transport requests.
Many customers also run satellite systems next to ECC:
- SAP BW for reporting.
- SAP CRM or SRM for customer and supplier processes.
- SAP PI/PO for integration.
- Non-SAP systems connected through interfaces.
Each satellite is a possible dependency during a transition.
What accumulates over the years
A system that has run for 10 to 20 years carries layers of history. Each layer affects the choice of transition path.
| Layer | What it looks like in ECC | Why it matters for the transition |
|---|---|---|
| Custom code | Z-programs, user exits, enhancements, modifications | Must be checked and adapted, or retired |
| Configuration | Many org units, company codes and local variants | Can be reviewed or redesigned |
| Master data | Duplicates, obsolete records, inconsistent fields | Needs cleansing before it moves |
| Transactional data | Many years of documents | Drives data volume and downtime |
| Interfaces | Point-to-point links, IDocs, file transfers | Must be tested again after the move |
Data structures you should recognize
ECC stores data in many redundant tables. For example, finance documents live in header and line tables (BKPF, BSEG). Separate index and aggregate tables, such as BSIS, BSAS, BSID, BSAD, BSIK and BSAK, hold open and cleared items. Customers (KNA1) and vendors (LFA1) are separate master records. Totals sit in tables like GLT0.
This design came from the time when databases were slow. S/4HANA removes much of this redundancy, so you should know where your current data lives.
Why the starting point shapes the decision
Three facts about your ECC system largely decide how hard the transition is:
- How much custom code you have, and how much of it is used. Heavy modification makes conversion harder. Little custom code makes conversion easier.
- How clean your data and processes are. Years of workarounds may argue for a fresh start.
- How much history you need. Legal and business needs for old data influence the data scope.
Later chapters turn these facts into decision criteria.
Maintenance timeline
SAP has announced the end of mainstream maintenance for ECC 6.0 at the end of 2027. Extended maintenance runs to the end of 2030 at a higher fee. Check SAP's current notes for the exact dates that apply to your release. This deadline is one of the main drivers covered in the next chapter.
Exercise
A company runs ECC 6.0 EHP 8 on SAP HANA. A colleague says it has "already moved to S/4HANA." Is that correct? Name one thing that confirms your answer.
Show answer
No. ECC on HANA only changes the database. It keeps the ECC data model, for example separate customer (KNA1) and vendor (LFA1) master tables and the BSEG and aggregate tables, and the ECC code base. The system still needs a transition to S/4HANA.
Exercise
Name three layers of history in an ECC system that affect the choice of transition path, and say why each one matters.
Show answer
Any three of: custom code (must be adapted or retired), master data quality (needs cleansing), transactional data volume (drives data scope and downtime), configuration (can be redesigned), interfaces (must be retested).