Sub topic 10
Confirming the Bar with Reviewers and Users
This chapter assumes you have already drafted a definition of done and acceptance criteria for a task, as covered in the earlier chapters. It also assumes you know who will review or use your work. Here you take that draft out of your head and check it against the people who will judge the result.
Why a private bar is not enough
A quality bar you set alone describes your expectations. The people who accept the work have their own. When the two differ, you find out at review time, when changing course is most expensive.
Three failures follow from skipping this step:
- You overshoot. You polish charts nobody will open, and the reviewer would have accepted a table.
- You undershoot. You treat a draft as final, and the reviewer expects every number traced to its source.
- You get a moving target. Each review round adds a new expectation, because the reviewer decides what matters only after seeing the work.
Confirmation turns a private guess into a shared agreement. It costs minutes at the start and can save a full rework cycle.
Who to confirm with
Not everyone with an opinion needs a conversation. Identify the people whose acceptance decides whether the work counts as done.
| Person | What they control | What to ask |
|---|---|---|
| Approver | Whether the work is accepted or rejected | "What would make you reject this?" |
| Reviewer | Detailed checks before approval | "What do you look at first? What do you skip?" |
| End user | Whether the work is useful in practice | "What will you do with this, and when?" |
| Dependent teammate | Work that builds on yours | "What do you need from this to start your part?" |
| Owner of constraints | Deadlines, budget, compliance rules | "Which limits are fixed and which can move?" |
One person can fill several roles. On a small task, your team lead may be approver, reviewer, and user at once. On a larger task, the approver and the end user often differ, and they may want different things. Ask both.
What to bring to the conversation
Do not open with "What do you want?" That question invites a vague answer or an expanding wish list. Bring a draft and ask for corrections. People react to a concrete proposal faster and more precisely than they describe requirements from scratch.
Your draft should fit on a screen and cover five things:
- The purpose of the work and who will use it.
- The acceptance criteria, phrased as observable checks.
- What you will not do, so omissions are visible.
- The time budget and any deadline.
- Your stopping rule.
The "not required" list does the most work. Reviewers rarely object to what is present, but they often notice an absence only when it is stated: "No charts? I do need a chart for the quarterly slide." You want that reaction now, not after delivery.
A short confirmation script
The conversation can be five minutes long. The steps below work in person, in chat, or in a comment thread.
- State the purpose in one sentence. "This report tells you whether we are on track for the Q4 release."
- Show the draft criteria. Share the checklist and ask the reviewer to read it.
- Ask for the rejection test. "What would make you send this back?" The answer often exposes a hidden standard.
- Ask what you can skip. This sets the lower boundary of effort.
- Restate the agreement in your own words. Misunderstandings show up when you paraphrase.
- Ask how and when they will review. Reviews with a fixed format and date are easier to meet.
Questions that surface hidden standards
Hidden standards are expectations the reviewer holds but has not stated, often because they seem obvious to that person. Direct questions about requirements rarely reveal them. These questions work better:
- "Think of a past deliverable you were happy with. What made it good?"
- "Think of one that disappointed you. What was missing?"
- "If this arrived with one flaw, which flaw would bother you most?"
- "Who else will see this, and what will they check?"
- "Is there a template or earlier example I should match?"
The last question matters more than it looks. Many hidden standards are format conventions: section order, naming, units, date formats. An example document carries dozens of them without anyone having to list them.
Past examples are also a way to calibrate. If the reviewer's favorite past report was two pages with one table, you now know the scale.
Matching the amount of confirmation to the work
Confirmation has its own cost. A full conversation about a ten-minute reversible task wastes more time than a wrong guess would. Apply the same logic you used for effort: scale confirmation to stakes and reversibility.
def confirmation_level(stakes: str, reversible: bool) -> str:
if stakes == "high" and not reversible:
return "written agreement from approver and a user before starting"
if stakes == "high" or not reversible:
return "short conversation, then a written summary"
return "state your assumptions in one line and proceed"
for stakes, reversible in [("low", True), ("high", True), ("high", False)]:
print(stakes, reversible, "->", confirmation_level(stakes, reversible))For low-stakes, reversible work, a one-line message is enough: "I'm treating this as a rough draft with no formatting. Tell me if you need more." Silence is then weak evidence of agreement. It is acceptable here because a correction is cheap.
For high-stakes or irreversible work, silence is not agreement. Ask for an explicit yes, and make sure it comes from someone with authority to accept the work.
When the reviewer disagrees with your bar
Disagreement at this stage is a good outcome, because it costs a conversation instead of a rework cycle. Most disagreements fall into a few types.
| Situation | What it usually means | Response |
|---|---|---|
| Reviewer wants a higher bar than you proposed | They see stakes or users you do not | Ask what the extra work protects against, then re-estimate the time |
| Reviewer wants a lower bar | You may be over-engineering | Accept it, and note what you are leaving out |
| Two reviewers want different things | The work has two audiences or the decision rights are unclear | Ask them to agree, or ask who decides |
| Reviewer says "just do your best" | They have not thought about it yet, or do not want to | Offer two concrete options and ask them to pick one |
| Reviewer wants more without more time | The bar and the budget conflict | Show the trade-off and ask which one moves |
The last row is the most common. Raising the bar without moving the time budget or scope is a hidden cost transfer, and it is worth naming. A neutral framing works: "Adding independent testing takes about two more days. Should I move the deadline, or drop the migration section?"
When "do your best" is the answer
"Do your best" sounds flexible but leaves you with no bar. Offer a choice instead:
- "Option A: a one-page summary by Wednesday, numbers unverified. Option B: a three-page analysis by Friday, numbers verified against the tracker. Which fits your need?"
Most people can choose between two concrete deliverables even when they cannot articulate requirements.
When the reviewer is not available
Sometimes you cannot reach the approver before you must start. Do not wait indefinitely, and do not proceed silently. Write down your assumptions, send them with a date, and proceed:
Subject: Assumptions for the vendor comparison (reply by Tuesday noon to change)
I'm starting the vendor comparison with this bar:
- Audience: you and the finance lead, for the renewal decision
- Must have: price, support terms, and exit clauses for all three vendors
- Not included: reference calls, security review
- Time budget: one day
- Done when: the three must-have items are filled in for each vendor
If any of this is wrong, tell me by Tuesday noon. After that I'll
assume it holds and deliver Wednesday.This message does four useful things. It makes your assumptions visible. It names the lowest-effort way to correct them. It sets a deadline for objections. It gives you a record if the expectation later changes.
If the work is high-stakes or irreversible, an unanswered message is not enough. Escalate, or find a delegate who can decide, before you commit large effort.
Users and reviewers can differ
Reviewers check the work against criteria. Users run the work in real conditions. A review can pass work that users find hard to use, because the reviewer checked completeness while users needed speed.
When the audiences differ, confirm separately and compare the answers. A migration guide is a good example. The reviewer may care that every command is correct. The user, an engineer on call at night, may care that the steps fit on one screen. Both are valid criteria. Include both in the acceptance checks.
If you cannot reach real users, find a proxy: someone who has the same background and has not seen your work. The acceptance criterion from earlier ("a teammate who has not seen the old system completes the migration using only the guide") is a user check you can run yourself.
Recording the agreement
An agreement that lives only in memory will drift. Within a day, write down what was agreed and send it to the people involved. A good record is short:
- The criteria as they stand after the conversation.
- The items marked not required.
- The time budget and deadline.
- Who has the authority to change the bar.
- The date of the agreement.
Put it where the reviewer will look when reviewing: the ticket, the top of the document, or the thread where the request began. When a later reviewer adds a new expectation, you can compare it against the record, which makes the change visible and opens the question of time or scope.
The record is also a protection against your own drift. When you feel the pull to add one more improvement, you can check it against the list.
Common errors
- Asking only "Is this okay?" People answer yes to a vague question. Ask the rejection test instead.
- Confirming with the wrong person. A colleague who will not review the work cannot confirm the bar. Check who has authority to accept.
- Treating one conversation as permanent. The agreement holds for the conditions at that time. The next chapter covers how to change the bar on purpose when scope, risk, or deadlines move.
- Confirming only what is easy. If you skip the uncomfortable question about the deadline or a missing resource, it returns at review time.
- Hiding your own constraints. Say what you cannot do. A reviewer who knows you have one day will choose the criteria differently than one who assumes a week.
Exercise
You are asked to write a one-page onboarding guide for new hires, due Friday. Your manager says, "Just make it good." Write the two options you would offer to convert this into a concrete bar, and the one question you would ask to find hidden standards.
Show answer
Example answer. Option A: a one-page checklist of first-week tasks, written from memory, reviewed only by you, ready Wednesday. Option B: a one-page guide with all links and system names verified, tested by a recent hire who follows it without help, ready Friday. Hidden-standard question: "What would make you send this back?" or "Is there an existing guide whose format I should match?" Any answer that offers two distinct, observable deliverables with different time costs and asks a question that exposes the reviewer's rejection test is correct.
Exercise
A reviewer approves your bar for a data summary, then on Thursday asks you to add an independent check of every figure. The deadline is Friday. What should you do, and what record helps you?
Show answer
Compare the request against the written agreement, which did not include independent checks. Then state the trade-off: the check takes extra time, so either the deadline moves, the scope shrinks (for example, check only the headline figures), or the reviewer accepts the risk of unchecked figures. Ask which one moves, and update the written record with the decision. The written agreement makes the added expectation visible as a change to the bar, not a failure of the original work.
Exercise
Use the confirmation_level function above. What does it return for stakes "low" and reversible False, and what does that mean in practice?
Show answer
It returns "short conversation, then a written summary". Work that is low stakes but cannot be undone deserves a brief check with the reviewer and a short written record, but not the full written sign-off that high-stakes irreversible work needs.