Sub topic 11
Changing the bar on purpose, not by drift
This chapter assumes you already write a short definition of done before starting work, that you can classify a task by stakes and reversibility, and that you have agreed the bar with the people who will review or use the result. Here we cover what happens after that: conditions change, and the bar has to change with them, deliberately.
Why a bar that was right on Monday can be wrong on Thursday
A quality bar is a decision made with the information you had at the time. It rests on assumptions about scope, risk, audience, and time. When any of those assumptions stops being true, the bar may no longer fit the work.
There are two ways a bar changes.
- On purpose. Someone notices a trigger, compares the old bar with the new conditions, decides what to change, and tells the people affected.
- By drift. Nobody decides anything. The bar rises because you keep polishing, or it falls because the deadline is close and you quietly skip checks.
Drift is the harmful one. Upward drift consumes the time budget without anyone agreeing to spend it. Downward drift delivers work below what the reviewer expects, and they find out only when they open it. Both leave you without a record of what the bar was at the end, so you cannot say whether the work met it.
Triggers: when to reopen the bar
You do not need to reconsider the bar every hour. Reopen it when something specific happens. Common triggers:
| Trigger | Example | Likely direction |
|---|---|---|
| Scope change | The report now covers three teams instead of one | Up, or cut something else |
| Stakes rise | The "internal draft" will now go to a customer | Up |
| Reversibility drops | A change that could be rolled back is now tied to a contract signature | Up |
| Deadline moves earlier | Review is Wednesday instead of Friday | Down, or reduce scope |
| Deadline moves later | You gain two extra days | Possibly up, but only if the reviewer wants it |
| Audience changes | The reader is now an executive, not a teammate | Usually up in clarity, down in detail |
| New information | You discover the source data has errors | Up for checking, or scope down |
| Budget is nearly spent | You have used 80% of the timebox with 50% of the must-haves done | Re-plan |
Notice that a trigger does not tell you which way to move. It only tells you to look again. A shorter deadline can mean lowering the bar, but it can equally mean cutting scope while keeping the bar. Those are different decisions with different consequences, and you should choose between them rather than let the clock choose.
The three levers
When conditions change, you have three things you can adjust. Most of the time you cannot hold all three fixed.
- Scope: what the work includes.
- Quality bar: how well each included piece must be done.
- Time or effort: how much you will spend.
If time shrinks, something else must give. The choice is between reducing scope (fewer items, each done to the original bar) and lowering the bar (all items, each done less thoroughly). For work where a failure is costly, reducing scope is usually safer. A smaller deliverable that is correct beats a complete one that is unreliable. For work where partial coverage would mislead the reader, lowering the bar on polish while keeping the bar on accuracy often fits better.
A useful habit is to separate the criteria that protect against harm from the criteria that only add finish. Accuracy, security, and legal correctness belong to the first group. Formatting, wording, and extra examples belong to the second. When you must cut, cut from the second group first.
Recording a change
A change is deliberate only if it is written down. The record can be very small. Add a short change log to the definition of done you already wrote.
## Definition of done: weekly status report
- Stakes: low, reversible (can send a correction)
- Audience: my team lead, reads in under 2 minutes
- Must have:
- [ ] Progress against last week's three goals
- [ ] One risk with an owner
- [ ] Numbers match the tracker
- Not required: charts, formatting polish
- Time budget: 30 minutes
- Stop when: all Must-have boxes are checked
### Change log
- Wed 10:15: Team lead asked that the report also go to the director.
- Stakes: low -> medium (a wider audience sees errors)
- Added Must have: [ ] Risk wording reviewed by team lead before sending
- Time budget: 30 -> 45 minutes
- Confirmed by: team lead, in chatEach entry answers four questions: what triggered the change, what changed, what it costs, and who agreed. If you cannot fill in one of them, you probably have not made a decision yet.
Making the effort level follow the change
In the first part of this tutorial you classified work by stakes and reversibility. When a trigger changes either input, rerun the classification. The function below repeats that rule so you can see how a change moves the result.
def effort_level(stakes: str, reversible: bool) -> str:
if stakes == "high" and not reversible:
return "thorough: independent review and testing"
if stakes == "high" or not reversible:
return "careful: self-review plus one checker"
return "light: meet the checklist and ship"
before = effort_level("low", True)
after = effort_level("high", True)
print("before:", before)
print("after: ", after)
if before != after:
print("The bar must change. Update the definition of done and tell reviewers.")Running it prints a light effort level for the original task and a careful one after the stakes rise. The output is not the point. The point is that a one-word change in an input changes the required effort, and that you should notice and act on it instead of continuing as before.
Downward changes need extra care
Raising the bar is easy to justify, because it feels responsible. Lowering it is where hidden risk accumulates, so it needs more discipline.
Before you lower a bar, check three things.
- What does each removed criterion protect against? If you drop "every command was run once," you accept that the guide may contain broken commands. Write that risk down.
- Who bears the consequence? If you bear it, the decision is yours. If the reader or a downstream team bears it, they must agree.
- Can the gap be closed later? A skipped polish pass can be done next week. A skipped check on data sent to a customer cannot be undone.
A useful phrase is "delivered to bar X, with these known gaps." It lets the reviewer decide whether to accept the gaps, which is the same negotiation you had at the start.
Upward changes also need a budget
Raising the bar has a cost, even when the reason is good. Each added criterion needs time, and that time comes from somewhere. When you add a must-have, answer one of these:
- What is removed to make room?
- Where does the extra time come from?
- Who approved the extra time?
If you cannot answer, the added criterion is probably wishful, not a real change. This is how bar inflation starts: a series of small improvements, each reasonable, with no one tracking the total.
Detecting drift in yourself
Drift is hard to see from the inside, so look for signals.
- You are working on something that is not in the definition of done.
- Your time budget is gone but the must-have boxes are not all checked, and you have not said so to anyone.
- You are reluctant to show the work because you "want to fix a few things first," and those things are not on the list.
- You skipped a check and told yourself it was fine, without writing down why.
- The reviewer's feedback keeps surprising you, which suggests your bar and theirs have separated.
A simple practice catches most of this. At fixed points, such as halfway through the timebox and when you think you are finished, reread the definition of done and ask: "Is this still the bar I would choose today?" If yes, continue. If no, make the change on purpose and record it.
Telling the right people
A bar change that only you know about is still drift, because your reviewer's expectations did not move. After you record a change, send a short message that includes the old bar, the new bar, the reason, and a request for confirmation.
Example: "The deadline moved to Wednesday. I will keep the accuracy checks and drop the summary chart. The report will still cover all three goals. Let me know if the chart is needed."
This takes under a minute. It keeps the agreement from the start of the work intact, and it gives the reviewer a chance to object while the cost of changing course is still low.
Exercise
You are writing a user guide with this definition of done: every command was run once, a new teammate can follow it unaided, and it is under 3 pages. Two days before the deadline, your manager says the guide will now be sent to an external customer, and the deadline is not moving. Name the triggers, choose which lever (scope, bar, or time) you would adjust, and say what you would write in the change log.
Show answer
Triggers: the audience changed (internal to external) and the stakes rose, since errors are now visible to a customer and harder to correct. The deadline is fixed, so time is not available. Because the stakes rose, the safety criteria (every command run, a newcomer can follow it) should stay, and probably be strengthened, for example by having someone outside the team test it. The lever to adjust is scope: cut sections that cannot be verified in time, and relax the finish criteria such as the page limit if needed. Change log entry: trigger (audience became an external customer), stakes (low or medium to high), added must-have (an independent tester completes the guide), removed or deferred (unverified sections, listed by name), time (unchanged), confirmed by (the manager, who agreed to the reduced scope). Then send the manager the old bar, the new bar, and the known gaps.
Exercise
Halfway through a 60-minute timebox you realize you have been reformatting tables, which is listed under "Not required". Two of three must-have boxes are unchecked. What do you do?
Show answer
Stop reformatting and treat this as detected drift. Reread the definition of done, return to the unchecked must-haves, and finish them first. If the remaining time is not enough for both, decide on purpose: either ask for more time, or tell the reviewer which must-have will be incomplete and why. Record the choice in the change log. Reformatting only comes back in if it is promoted to a must-have through a recorded decision.