Sub topic 5
The Eight Wastes as an Observation Lens
Assume you know basic lean terms and have seen a process at work. This chapter uses the eight wastes to help you observe a gemba without jumping to conclusions.
Why use the eight wastes?
Waste is any activity that uses resources but does not create value for the customer. Value-adding work changes the product or service in a way the customer needs and would recognize as valuable. Some non-value-adding work is required, such as safety checks or legal records. Other non-value-adding work can be removed or reduced.
The eight wastes provide a common observation lens. They help you describe what happens without blaming the person doing the work.
| Waste | What to look for | Useful question |
|---|---|---|
| Defects | Errors, rework, corrections or discarded output | Where was the error detected? |
| Overproduction | Work completed before it is needed | What signal authorized this work? |
| Waiting | People, materials or information standing still | What is preventing the next step? |
| Non-utilized talent | Skills, ideas or judgment not being used | Who knows how this could work better? |
| Transportation | Unnecessary movement of items or information | Why does this item travel this far? |
| Inventory | More material, work or information than needed | What demand or problem does this buffer cover? |
| Motion | Unnecessary movement by people | What does the worker repeatedly reach, search for or walk to? |
| Extra-processing | More work, checking or features than the customer needs | Which requirement makes this step necessary? |
A single event can show more than one waste. For example, a missing label may cause waiting, extra motion to find a replacement, and a defect when the wrong label is used.
Observe facts before naming waste
Start with what you can see, hear or count. Avoid recording judgments such as “the operator is slow” or “the process is badly managed.” Record facts such as “the operator searched three drawers for a gauge” or “the order waited 12 minutes for approval.”
observation:
time: "09:10"
area: "Packing line 2"
what_i_saw: "Packer stopped for about 4 minutes while waiting for labels"
possible_waste: waiting
question: "What happens when the labels run out?"The label “possible waste” is a hypothesis, not a final diagnosis. Ask the people doing the work what caused the condition. Then compare the observation with demand, standard work and customer requirements.
Common errors
Do not treat every queue as waste before checking why it exists. A small buffer may protect a process from variation. Do not count activity as value merely because it keeps people busy. Do not use the categories to rank or punish workers. The process usually creates the conditions that produce the waste.
Also avoid fixing the first symptom during the walk. Capture the condition, understand its cause and agree on a safe next step. Repeated observations are stronger than one dramatic example.
Exercise
During a walk, an employee walks 20 meters to retrieve a tool for each job. Which waste is most visible, and what is a respectful question to ask?
Show answer
Motion is most visible. Ask, “What determines where this tool is kept, and where would it be most useful during the job?”