Assume you already know basic lean terms and have observed a process before. This chapter explains how standard work gives a gemba walk a reliable baseline.
What standard work means
Standard work is the documented best-known method for completing a task safely, correctly, and at the required pace. It describes more than a general instruction such as “pack the order.” It normally defines:
- The work sequence: the order of the steps.
- The takt time: the available production time divided by customer demand.
- The standard work-in-process: the minimum material or information needed to keep the process moving.
A standard is a current agreement about how the work should happen. It is not a permanent rule. When a better method is tested and confirmed, the standard should change.
Without a baseline, observers may record personal preferences as problems. With a baseline, they can compare the actual process with an agreed method.
What to compare during a walk
Before visiting the area, obtain the current standard work document or job instruction. Check its revision date and confirm with the process owner that it is still valid.
During the walk, compare four things:
| Baseline element | Observation question |
|---|---|
| Takt time | Is the process keeping pace with demand? |
| Work sequence | Are the steps performed in the defined order? |
| Standard work-in-process | Is the expected amount of material or information present? |
| Quality and safety points | Are required checks and safe methods followed? |
A gap is evidence for investigation, not proof that someone made a mistake. For example, an operator may skip a documented step because the document is outdated, the required tool is unavailable, or another process has changed.
Use the gap to learn
Record what happened in neutral language:
- “The operator waited for labels for about four minutes.”
- “The documented sequence starts with scanning, but the system was unavailable.”
- “Two containers were present; the standard shows one.”
Avoid writing “operator was careless” or “operator did not follow instructions.” Those statements judge a person and hide the process condition.
Ask open questions:
- “Can you walk me through how you normally do this?”
- “What makes this step difficult today?”
- “When does the documented method no longer fit the work?”
- “What would prevent this delay?”
The purpose is to learn whether the standard is being followed, whether the standard is practical, or whether the process needs a controlled experiment.
Turning observations into improvement
Use the baseline in a PDCA cycle:
- Compare actual work with standard work.
- Describe the gap and its effect.
- Investigate the cause with the people doing the work.
- Test one change.
- Measure the result.
- Update the standard if the change succeeds.
- Train affected people and check that the new method is understood.
A gemba walk should leave the process clearer than it found it. The standard makes that improvement visible and repeatable.
Exercise
The standard says one label container should be at the station, but the operator walks away whenever labels run out. What should you record first?
Show answer
Record the observed delay and the actual label condition in neutral terms. Then ask how labels are replenished and why the standard quantity does not prevent the delay.