Sub topic 3
Training the people who run the process
This chapter assumes you know the DMAIC phases, can tell common cause from special cause variation, and can read a control chart. The Control phase ends with people, not with a chart. Training, handover, audits, and closure keep the gains in place after the project team leaves.
Training the people who run the process
Standard work documents describe the new method. Training transfers the skill. Record attendance, and confirm that each operator can perform the steps on the floor, not only pass a quiz. Plan refresher training whenever the control plan changes.
Running the handover to the process owner
The handover moves accountability from the project team to the process owner. Use a checklist, and have the owner sign it.
handover_checklist:
- Control plan approved and filed
- Standard work published
- Staff trained, attendance recorded
- Reaction plan reviewed with owner
- First audit date scheduled
- Process owner signs acceptanceAuditing and sustaining the gains
Schedule audits at fixed intervals. An audit checks whether people follow standard work, whether control charts are updated, and whether reaction plans were used when signals appeared. Record each finding, and assign an owner to every gap.
Validating benefits and closing the project
Compare the post-improvement metric with the baseline over a stable period, such as three months. Confirm the savings with finance. Close the project only after the owner accepts the handover and the benefits hold.
| Stage | Question | Evidence |
|---|---|---|
| Training | Can staff run the steps? | Attendance and observed practice |
| Handover | Does the owner accept? | Signed checklist |
| Audit | Is the method followed? | Audit log |
| Closure | Did the benefit hold? | Metric compared with baseline |
Why improvements regress and how to prevent it
Gains usually erode when the project team leaves and no one owns the controls. Common causes include staff reverting to old habits, reaction plans being ignored, measurements drifting, and nobody reviewing the charts. Prevent this by assigning an owner, scheduling audits, and keeping the reaction plan visible at the workstation.
Exercise
An audit finds operators skipping step 3 of the standard work. What should the process owner do first?
Show answer
Find out why. Check whether the step is unclear, too slow, or missing from training. Then retrain the staff or revise the standard work, and log the action.