Measuring reliably over time
This chapter assumes you know the DMAIC phases, can separate common-cause from special-cause variation, and can read a run chart. You also need one numeric measure of process output for each period.
Why measurement error hides real change
A control chart only helps if it tracks the process rather than the measuring method. Measurement error comes from the tool, the people taking readings, and how samples are chosen. Before you chart a measure, check that its noise is small compared with the process spread. If it is not, the chart will raise false alarms or miss real drift.
Setting the sample and frequency
Measure the same way every time: the same method, the same sample rule, and the same interval. In the invoice approval example, the workflow timestamp report covers all invoices, and the owner reviews it weekly.
Monitoring with control charts
An individuals (I) chart plots one value per period. Its limits come from a baseline period:
def individuals_limits(values):
"""Return (lower, center, upper) control limits for an individuals chart."""
moving_ranges = [abs(b - a) for a, b in zip(values, values[1:])]
mr_bar = sum(moving_ranges) / len(moving_ranges)
center = sum(values) / len(values)
# 2.66 = 3 / d2, where d2 = 1.128 for moving ranges of size 2
return center - 2.66 * mr_bar, center, center + 2.66 * mr_bar
baseline = [2.8, 3.1, 2.9, 3.0, 3.2, 2.7, 3.0, 2.9]
lower, center, upper = individuals_limits(baseline)
new_value = 4.1
if new_value > upper or new_value < lower:
print("Out of control: follow the reaction plan")Recalculate the limits only from a stable baseline. Recalculating them after every shift hides drift.
Reaction plans: what to do when the process drifts
A reaction plan names the owner, the time allowed for review, and the record to keep. A common error is writing "investigate the issue" with no owner or deadline. Write the plan so a team lead can act on it without asking anyone.
Building controls into the process with mistake-proofing
Mistake-proofing, also called poka-yoke, is a design feature that stops a defect from passing. An invoice form that refuses submission without a purchase order number is one example. A common error is relying on a warning that users can click past.
Standard work and documentation
Standard work is the written record of the steps, timing, and checks an operator follows. Keep it current. Outdated instructions are a frequent cause of lost gains.
Exercise
Why should you verify the measurement system before you set control limits?
Show answer
If measurement noise is large relative to the process spread, the chart produces false alarms or misses real drift, so the limits do not describe the process.