Sub topic 13
Pitfalls: Autocorrelation, Non-Normality, Overdispersion, and Overreaction
Assume you know how to calculate means, ranges, standard deviations, and basic control limits. This chapter focuses on cases where the usual I-MR, X-bar and R, p, or u chart assumptions fail. The main rule is simple: treat a chart signal as evidence to investigate, not as proof that the process changed.
Autocorrelation: when nearby points are related
Shewhart limits assume that observations are approximately independent. Autocorrelation means that one observation is related to earlier observations. It often appears in temperature, pressure, cycle-time, and financial time series. A slow drift can produce long runs on one side of the center line. Short-term feedback can make consecutive values unusually similar.
Autocorrelation can create too many apparent signals. For example, if a measurement stays high for several minutes because the equipment warms up, eight points above the center line may reflect one gradual condition rather than eight independent events. Conversely, a chart can hide a sudden change when the process has strong smoothing.
Keep observations in time order. Do not randomly shuffle them before charting. Inspect a time plot and, when appropriate, calculate autocorrelation. If dependence is expected, consider charting residuals, which are the differences between observed values and a suitable time-series model. A time-series control chart and a standard Shewhart chart answer different questions.
import numpy as np
x = np.array([10.0, 10.2, 10.3, 10.5, 10.4, 10.6])
lag1 = np.corrcoef(x[:-1], x[1:])[0, 1]
print(f"Lag-1 correlation: {lag1:.3f}")This calculation is only a diagnostic. A high value does not identify the cause or prove that a particular model is correct.
Non-normality: when the distribution is not bell-shaped
I-MR limits are commonly derived from normal-distribution assumptions. X-bar limits are often more tolerant because subgroup means can become approximately normal, but small subgroups and strongly skewed data can still cause trouble. Range constants also depend on distributional assumptions.
Do not automatically delete unusual values or transform data merely to make a histogram look normal. First ask whether the measurement has a natural boundary, a mixture of process conditions, or a real special cause. Then choose an appropriate response:
- Use a transformation when it has a meaningful interpretation and stabilizes variation.
- Use a chart designed for the data distribution when normal limits are unsuitable.
- Use subgroup means when rational subgroups make that summary meaningful.
- Investigate mixtures instead of hiding them with a single overall limit.
A non-normal distribution does not automatically make a control chart useless. The risk is greatest when the sample is small, the distribution is highly skewed, or the limits place substantial probability below a natural boundary such as zero.
Overdispersion: when count variation is larger than expected
A p chart assumes a binomial model. A u chart assumes a Poisson model. Both models specify how much variation should occur by chance. Overdispersion means the observed variation is larger than that model predicts.
For a p chart, overdispersion may result from different customer groups, shifts, machines, or inspectors having different defect rates. For a u chart, defects may cluster because one underlying failure creates several related defects. Using ordinary limits in either case makes the limits too narrow and creates false alarms.
Check whether the denominator changes, whether observations are independent, and whether the process combines distinct populations. Stratify the chart by a meaningful source when appropriate. If the extra variation remains, use a model or charting method that estimates it instead of forcing binomial or Poisson limits.
| Symptom | Likely concern | First check |
|---|---|---|
| Long runs and gradual movement | Autocorrelation or drift | Plot in time order |
| Many extreme values | Skew, mixtures, or special causes | Examine strata and measurement process |
| Count limits signal repeatedly | Overdispersion | Compare observed and expected variation |
| Frequent rule violations after every update | Overreaction | Freeze limits and investigate the process |
Overreaction: changing the chart instead of the process
A point beyond a limit is a signal, not a command to adjust the machine immediately. Verify the measurement, identify what changed, and look for an assignable cause. Do not remove a point solely because it makes the limits wider. Remove it only when a documented, nonrecurring cause explains why it does not represent the process being monitored.
Set baseline limits from a period that is reasonably stable. After investigating confirmed special causes, recalculate limits only when the process has genuinely changed or the monitoring design has changed. Do not continually recompute limits so that every new point becomes part of the baseline.
The following decision path helps separate a modeling problem from a process signal:
Exercise
A u chart has frequent points above its upper control limit, and the points cluster by machine. What should you check before changing the limits?
Show answer
Check whether machines have different defect rates, whether defects within a unit are dependent, and whether the data should be stratified. Confirm the measurement and denominator before estimating new limits.