Sub topic 10
Protect time for your three tasks
This chapter assumes you already keep a task list, use a calendar, and have picked your three tasks for the day using the earlier method. Here you turn that list into time on the calendar. A task with no time assigned to it usually loses to whatever is loudest.
Why a list is not a plan
Three chosen tasks are still only intentions. If you start the day with "I'll fit them in," other people's requests fill the gaps first. A time block is a span on your calendar reserved for one task. Putting the task in a block turns "I should do this" into "I will do this at 09:00."
Steps for building blocks
- Open today's calendar. Note fixed commitments such as meetings and appointments. These are not movable.
- Find the open gaps. Measure each one. A 20-minute gap and a two-hour gap are different resources.
- Place the hardest task in your best gap. Pick the window when you think most clearly, often the morning. Put the task that needs deep thought there.
- Match the other tasks to the remaining gaps. Small, low-effort tasks can fit short gaps. Medium tasks need a block of an hour or so.
- Add a buffer. Leave 10 to 15 minutes between blocks. Tasks run over, and you need time to switch.
- Write the block down. Enter it on your calendar or in your plan, with the task name and its definition of done.
Sizing a block
Estimate how long the task takes, then add some margin. People tend to underestimate. If you are unsure, guess generously. A block that ends early gives you free time. A block that is too short leaves the task half done.
| Task type | Typical block | Placement |
|---|---|---|
| Deep work (writing, coding, analysis) | 90-120 minutes | Your best energy window |
| Medium task (a fix, a review) | 45-60 minutes | A mid-day gap |
| Quick errand (a call, a booking) | 15 minutes | A short gap or end of day |
Example
The plan below uses the three tasks from the earlier chapters. Each has a block, and the plan lists what was left out on purpose.
## Today
### Top 3
1. Draft the project proposal introduction and send it to Sam for review (done = draft sent)
2. Fix the login bug reported by the support team (done = fix merged and ticket updated)
3. Book the dentist appointment (done = appointment confirmed)
### Time blocks
- 09:00-11:00 Task 1
- 11:15-12:15 Task 2
- 16:00-16:15 Task 3
### Not today
- Reorganize shared drive
- Read industry newsletterThe proposal gets two hours in the morning, when the writing is hardest. The bug fix follows after a 15-minute buffer. The dentist booking is a short errand, so it takes a 15-minute slot late in the day. The "Not today" list is part of the plan. It lets you say no to other work without feeling you forgot it.
Protecting the blocks
A block only works if you treat it like a meeting with someone else.
- Mark the time as busy on a shared calendar so others see you are unavailable.
- Silence notifications and close unrelated tabs for the length of the block.
- Start with the first action. Open the document or file before anything else.
- If someone asks for your time, offer a different slot instead of refusing outright.
Common mistakes
- Back-to-back blocks with no buffer. One overrun breaks the whole day.
- Blocking every minute. Leave some unscheduled time for the unexpected.
- Putting deep work in a low-energy slot. The block exists but the work does not get done.
- Vague blocks. "Work on project" invites drifting. Name the outcome.
Exercise
Your day has meetings from 10:00 to 12:00 and from 14:00 to 15:30. Your three tasks are a 90-minute report, a 45-minute code review, and a 15-minute phone call. You think best in the morning. Build a block schedule that includes buffers.
Show answer
One valid answer: report 08:00-09:30 (before the meetings, in your best energy window), code review 12:15-13:00 (after a short buffer following the meeting), phone call 15:45-16:00 (after a buffer following the second meeting). Each block has at least 10-15 minutes of buffer around it, and the hardest task is in the best window. Other arrangements work if the report gets a long block in the morning and no blocks collide with the meetings.