Sub topic 9
The Market Portfolio and the Capital Market Line
This chapter assumes you can compute portfolio expected return and standard deviation for two assets. It also assumes you know what the risk-free rate is and have met the capital allocation line (CAL). The chapter shows what happens when every investor faces the same CAL. That common line is the capital market line (CML).
From the CAL to the CML
The capital allocation line plots every combination of the risk-free asset and one risky portfolio. Its slope is the Sharpe ratio of that risky portfolio:
CAL slope = (E[Rrisky] − Rf) / σ_risky
Each risky portfolio gives a different CAL. A rational investor picks the one with the steepest slope, because at any level of risk it offers the highest expected return. That is the line tangent to the efficient frontier of risky assets.
Now add two assumptions:
- All investors have the same expectations about returns, variances, and covariances (homogeneous expectations).
- All investors can lend and borrow at the same risk-free rate.
Under these assumptions every investor computes the same efficient frontier and the same tangency portfolio. In equilibrium, that tangency portfolio is the market portfolio. The capital market line is the CAL drawn through the risk-free rate and the market portfolio.
What the market portfolio contains
The market portfolio holds every risky asset in proportion to its market value. If a stock makes up 2% of the total market value of all risky assets, it is 2% of the market portfolio.
- It includes all risky assets: stocks, bonds, real estate, and so on. An equity index is only a proxy.
- It must be fully diversified, so it contains no unsystematic risk. All of its risk is systematic.
- It is the same for every investor. Only the mix with the risk-free asset differs.
The CFA curriculum calls the second point the separation theorem. The investment decision (which risky portfolio to hold) is separate from the financing decision (how much to lend or borrow). Everyone holds the market portfolio. Risk aversion only decides how much to hold.
The CML equation
The CML gives the expected return of an efficient portfolio as a function of its total risk:
E[Rp] = Rf + [(E[Rm] − Rf) / σm] × σp
- E[Rm] − Rf is the market risk premium.
- σ_m is the standard deviation of the market portfolio.
- The slope (E[Rm] − Rf) / σ_m is the market's Sharpe ratio. It is the reward per unit of total risk.
- σ_p is the portfolio's standard deviation.
A portfolio on the CML with weight w in the market portfolio and 1 − w in the risk-free asset has σp = w × σm. So w = σp / σm. The risk-free asset has zero variance and zero covariance with the market, which is why the portfolio's risk scales linearly with w.
Lending and borrowing portfolios
| Position | Weight in market, w | Weight in risk-free, 1 − w | Where on the CML |
|---|---|---|---|
| Lending portfolio | 0 < w < 1 | positive | Between R_f and the market |
| Market portfolio | w = 1 | 0 | The tangency point |
| Borrowing (leveraged) portfolio | w > 1 | negative | Beyond the market |
A negative weight in the risk-free asset means the investor borrows at R_f and invests the proceeds in the market portfolio.
Worked example
Assume Rf = 3%, E[Rm] = 8%, and σ_m = 15%.
The slope is (8% − 3%) / 15% = 0.3333. The market earns 0.33 percentage points of expected return for each percentage point of standard deviation.
Lending investor, target σ_p = 10%.
- w = 10 / 15 = 0.6667, so 66.7% goes in the market and 33.3% in the risk-free asset.
- E[R_p] = 3% + 0.3333 × 10% = 6.33%.
- Check: 0.6667 × 8% + 0.3333 × 3% = 5.33% + 1.00% = 6.33%.
Borrowing investor, target σ_p = 20%.
- w = 20 / 15 = 1.3333, so the investor borrows 33.3% of their capital.
- E[R_p] = 3% + 0.3333 × 20% = 9.67%.
- Check: 1.3333 × 8% − 0.3333 × 3% = 10.67% − 1.00% = 9.67%.
The code below computes the same results:
def cml_return(rf, e_rm, sd_m, sd_p):
"""Expected return of an efficient portfolio on the CML."""
slope = (e_rm - rf) / sd_m
return rf + slope * sd_p
def market_weight(sd_m, sd_p):
"""Weight in the market portfolio needed to hit a target risk."""
return sd_p / sd_m
rf, e_rm, sd_m = 0.03, 0.08, 0.15
for sd_p in (0.10, 0.15, 0.20):
w = market_weight(sd_m, sd_p)
ret = cml_return(rf, e_rm, sd_m, sd_p)
print(f"sd={sd_p:.0%} w_market={w:.4f} w_rf={1 - w:+.4f} E[R]={ret:.2%}")The output shows the risk-free weight changing from positive to zero to negative as risk rises:
sd=10% w_market=0.6667 w_rf=+0.3333 E[R]=6.33%
sd=15% w_market=1.0000 w_rf=+0.0000 E[R]=8.00%
sd=20% w_market=1.3333 w_rf=-0.3333 E[R]=9.67%The next diagram plots the CML for these inputs. It is a straight line starting at the risk-free rate on the vertical axis.
CML versus CAL
The two lines are easy to confuse.
| Feature | Capital allocation line (CAL) | Capital market line (CML) |
|---|---|---|
| Risky asset used | Any risky portfolio | The market portfolio only |
| Applies to | One investor's chosen portfolio | All investors under common expectations |
| Slope | Sharpe ratio of that risky portfolio | Sharpe ratio of the market |
| Status | A construction | An equilibrium result |
The CML is a special CAL. It is the one with the highest slope, because it passes through the tangency portfolio.
What the CML says about risk
- Only efficient portfolios lie on it. Individual securities and inefficient portfolios plot below the CML, because they carry unsystematic risk that earns no extra return.
- Its risk measure is total risk. The horizontal axis is standard deviation. This is the main difference from the security market line, which uses beta and applies to any asset, efficient or not. Later chapters cover the SML.
- Every portfolio on it is perfectly correlated with the market. Each is a mix of the market portfolio and a constant risk-free return, so the correlation is +1.
- It lets you compare returns across risk levels. You can read off the return you should expect from an efficient portfolio at a given standard deviation.
Common errors
- Using the wrong risk measure. The CML uses σ_p (total risk). Beta belongs to the SML.
- Forgetting the sign of the risk-free weight. For w > 1, the risk-free weight is negative, meaning borrowing.
- Dividing by the wrong standard deviation. The slope uses σ_m, the market's standard deviation, not the standard deviation of your own portfolio.
- Treating the CML as the efficient frontier. The efficient frontier of risky assets is a curve. The CML is a straight line tangent to it.
- Ignoring unequal borrowing and lending rates. If the borrowing rate exceeds R_f, the CML is no longer one line. It bends beyond the market portfolio and becomes flatter.
Assumptions behind the result
The CML conclusion depends on the CAPM environment:
- Investors are risk-averse and care only about expected return and variance.
- All investors share the same expectations and the same single-period horizon.
- A single risk-free rate exists for both lending and borrowing.
- Markets are frictionless, with no taxes or transaction costs.
- All assets are marketable and infinitely divisible.
- Investors are price takers.
Break any of these and the market portfolio need not be the tangency portfolio for everyone. A later chapter on CAPM limitations returns to this.
Exam tips
- If a question gives a target standard deviation and asks for the return, use the CML directly. You do not need weights.
- If a question asks how to reach a standard deviation above σ_m, the answer is borrowing at the risk-free rate.
- A questions saying "efficient portfolio" or "total risk" points to the CML. A question saying "beta" or "required return on a security" points to the SML.
Exercise
The risk-free rate is 2%, the market portfolio has an expected return of 9% and a standard deviation of 14%. An investor wants an efficient portfolio with a standard deviation of 21%. What is its expected return, and what weight does the investor place in the risk-free asset?
Show answer
The CML slope is (9% − 2%) / 14% = 0.5. Expected return = 2% + 0.5 × 21% = 12.5%. The weight in the market is 21 / 14 = 1.5, so the risk-free weight is 1 − 1.5 = −0.5. The investor borrows 50% of their capital at 2% and invests 150% in the market portfolio. Check: 1.5 × 9% − 0.5 × 2% = 13.5% − 1.0% = 12.5%.
Exercise
A portfolio manager says her fully diversified equity portfolio has a Sharpe ratio above the slope of the CML. Why would that be notable, and why is it unlikely in a CAPM world?
Show answer
The CML slope is the Sharpe ratio of the market portfolio, which is the highest Sharpe ratio available among all risky portfolios under homogeneous expectations. A portfolio with a higher Sharpe ratio would plot above the CML, so it would be a better deal than the market. In a CAPM equilibrium that cannot persist, because all investors would buy it and its price would rise until the excess return disappeared. Persistent results above the CML would suggest skill, different expectations, or a market that does not satisfy the CAPM assumptions.