Sub topic 5
When capitalisation starts and stops
This chapter assumes you know double-entry bookkeeping, can tell an asset from an expense, and have read the earlier chapters on the components of initial cost and on costs that stay out of asset cost. Here the question is timing. Which costs fall inside the capitalisation window, and when does the window close?
The core rule
Under IAS 16, an entity capitalises costs that are directly attributable to bringing the asset to the location and condition necessary for it to operate as management intends. Capitalisation begins when the entity first incurs a cost that qualifies. It stops when the asset is in the location and condition needed to operate as intended.
The test is ready for intended use. It does not depend on the asset's actual use or on the date of first revenue. An asset that is ready but sits idle has already left the window.
Starting the window
Costs usually qualify from the point the entity commits to acquiring or building the asset. Examples include site preparation, deposits, and professional fees tied directly to the asset. Costs of evaluating whether to buy are different. General feasibility studies and board deliberations happen before the project is committed, so they are expensed.
Stopping the window
Capitalisation stops when the asset can operate in the manner management intended. The following table shows how this applies in typical situations.
| Situation | Capitalise? | Reason |
|---|---|---|
| Testing whether the machine works properly | Yes | Needed to reach the required condition |
| Machine is ready but waiting for customer orders | No | Ready for intended use, so the window has closed |
| Operating below planned capacity while demand builds | No | The asset is capable of operating as intended |
| Relocating or reorganising an operation after completion | No | Not needed to bring the asset into use |
| Delay caused by waiting for a licence that is essential to operate | Yes, if the licence is a condition of operating | The asset is not yet in the required condition |
Operating losses and start-up inefficiencies after the asset is ready are expensed. Costs of testing are capitalised, and in IAS 16 the proceeds from selling items produced during testing are recognised in profit or loss, not deducted from cost.
Pauses and idle periods
If active work is suspended, the treatment depends on the reason. A brief or necessary delay, such as waiting for an inspection that is part of the process, does not end capitalisation. A long, unplanned halt is different. Borrowing costs are suspended during extended interruptions of active development, and that rule is covered in the chapter on borrowing costs. For other costs, the question remains whether the cost is directly attributable to getting the asset ready.
Worked example
A company buys a press and gets it installed. Costs are recorded as follows.
| Date | Event | Amount | Treatment |
|---|---|---|---|
| 1 March | Installation begins | 30,000 | Capitalise |
| 20 March | Test runs | 5,000 | Capitalise |
| 31 March | Press is ready for use | n/a | Window closes |
| 1 April to 30 April | Press idle, no orders | 4,000 of running costs | Expense |
The capitalised cost includes 35,000 for installation and testing. The April running costs are an expense, because the press was ready on 31 March.
Common errors
- Continuing to capitalise until the first sale, when the asset was ready earlier.
- Stopping at the date of purchase and leaving out installation and testing.
- Capitalising pre-commitment study costs.
Exercise
A plant finishes testing on 15 June and is ready to operate. Management waits until 1 August to start production because of weak demand. Costs of 12,000 are incurred between 15 June and 1 August to keep the plant running. Should they be capitalised?
Show answer
No. The plant was ready for its intended use on 15 June, so capitalisation stopped on that date. The 12,000 is expensed, and depreciation begins on 15 June.