Sub topic 9
Assets you build yourself
This chapter assumes you know double-entry bookkeeping, the difference between an asset and an expense, and the initial cost components covered earlier. It covers what goes into the cost of an asset that a company builds for its own use.
The basic rule
A self-constructed asset is measured on the same basis as a purchased one. IAS 16 requires the cost to include all costs directly attributable to bringing the asset to the location and condition needed for it to operate as management intends. The company's own build is treated as if it had bought the asset from a contractor, with one difference. Any profit the company might have earned by selling the same item is excluded.
What to include
- Direct materials used in the build, net of trade discounts.
- Direct labour for employees who work on the asset, including wages and benefits.
- Costs of site preparation, installation, assembly and testing.
- Fees of professionals, such as architects and engineers, who work on the project.
- Directly attributable overhead, for example a site supervisor's salary or power used on the build.
- Borrowing costs on a qualifying asset, covered in the next chapter.
What to exclude
- General administration and selling overhead that exists whether or not the asset is built. Examples are head-office salaries and general insurance.
- Abnormal waste, such as scrap or idle labour beyond normal levels. These are expensed.
- Internal profit. If the company could sell the item for 1,000,000 but it cost 800,000 to build, the asset is recorded at 800,000.
- Start-up losses and costs of training staff to run the asset.
Fixed overhead is allocated only when it is clearly caused by the project. Many companies use an allocation rate based on direct labour hours. The rate must reflect normal activity, not unusually low activity.
Worked example
A company builds a warehouse racking system for its own use. The costs are below.
| Item | Amount | Treatment |
|---|---|---|
| Steel and fittings | 180,000 | Capitalise |
| Trade discount on steel | (10,000) | Reduce cost |
| Direct labour | 90,000 | Capitalise |
| Site supervisor (full time on project) | 20,000 | Capitalise |
| Testing | 6,000 | Capitalise |
| Wasted steel (abnormal) | 4,000 | Expense |
| Head-office overhead share | 15,000 | Expense |
materials = 180_000
trade_discount = 10_000
direct_labour = 90_000
supervisor = 20_000
testing = 6_000
abnormal_waste = 4_000 # expensed
head_office_share = 15_000 # expensed
cost = materials - trade_discount + direct_labour + supervisor + testing
expensed = abnormal_waste + head_office_share
print(cost, expensed) # 292000 19000The journal entry credits each resource used, and the debit goes to the asset account, often a construction-in-progress account until the asset is ready for use:
# Dr Construction in progress 292,000
# Cr Materials inventory 170,000
# Cr Wages payable / cash 90,000
# Cr Overheads applied 20,000
# Cr Cash (testing) 6,000
# Dr Waste expense 4,000
# Cr Materials inventory 4,000
# Dr Administrative expense 15,000 stays in expense; no entry to the assetWhen the asset is ready for use, the balance moves from construction in progress to the correct PPE class, and depreciation starts.
Common errors
- Adding a profit margin to the cost of the asset.
- Allocating all head-office overhead to the project.
- Leaving abnormal waste inside the asset cost.
- Failing to transfer the balance out of construction in progress when the asset is ready, which delays depreciation.
Exercise
A company builds a machine for its own use. Materials cost 70,000 (after a 5,000 trade discount), direct labour is 40,000, and a share of general head-office overhead is 12,000. Abnormal wasted materials cost 3,000 and are already included in the 70,000. The machine could be sold externally for 150,000. What is the capitalised cost?
Show answer
Materials are 70,000 less the abnormal waste of 3,000, giving 67,000. Add direct labour of 40,000 for 107,000. Head-office overhead is excluded, and the external selling price is irrelevant because internal profit is not recognised. The capitalised cost is 107,000. The 3,000 of waste is expensed.