Sub topic 1
What a marketing brief is for
A marketing brief is a written document that tells a supplier what you want done, why, for whom, by when, and how you will judge the result. The supplier may be an agency or a freelancer. This chapter covers the working model of a brief: what it does, what it must contain, and the errors that make it fail.
Prerequisites
This chapter assumes you have:
- Basic familiarity with common digital marketing channels such as search, social, email and content.
- Experience working with or managing a marketing budget or campaign.
- An understanding of basic marketing metrics such as impressions, clicks, conversions and cost per acquisition.
You do not need to have written a brief before. Later chapters cover each part of the brief in detail. This chapter explains why the document exists and how its parts work together.
The job a brief does
A brief has four jobs. Each one reduces a specific kind of waste.
- It transfers context. The supplier does not know your market, your customers or your past results. The brief hands that knowledge over in one place, so the supplier does not have to guess or reconstruct it from your website.
- It defines success before work starts. A measurable objective lets both sides decide, without argument, whether the work succeeded.
- It sets the boundaries. Scope, budget, dates and constraints tell the supplier what is included, what is not, and what rules apply.
- It creates a shared reference. When someone asks "did we agree to that?" in week six, the brief is the record you check first.
A brief is not a creative idea, a contract or a project plan. The supplier produces ideas and plans in response to it. A contract (covered in a later chapter) makes terms legally binding. The brief is the input that both of those depend on.
What goes wrong without one
Most failed supplier relationships trace back to missing or vague input rather than poor supplier skill. Common symptoms:
- Rework. The first drafts miss the audience or tone, so the supplier redoes them. You pay for the extra hours or lose the launch date.
- Unusable quotes. If three suppliers each assume a different scope, their prices cannot be compared.
- Vanity reporting. With no agreed objective, the supplier reports what looks good, such as impressions and clicks, rather than what matters to your business.
- Scope disputes. Without a list of deliverables, "social content" can mean four posts or forty.
A useful rule: if the supplier has to ask you a question that you already knew the answer to, the brief had a gap.
A brief is a specification, not a wish
Compare two statements of the same goal.
- Vague: "We want more leads this autumn."
- Specific: "Increase qualified demo requests from 120 per month (October baseline) to 180 per month by 31 January, at a cost per qualified request no higher than 90."
The second version names the metric, the baseline, the target, the deadline and a cost limit. Here it is as a block you can reuse:
Increase qualified demo requests from 120 per month (October baseline) to 180 per month by 31 January, at a cost per qualified request no higher than 90.With the specific version, a supplier can estimate effort, choose channels and propose a budget split. With the vague version, every supplier will invent their own target, and you will not be able to compare their answers.
The parts of a brief
The brief needs enough fields to make the work quotable and reviewable. The skeleton below shows the fields a supplier needs. Read it as a map of the document. Each field has its own chapter later in this tutorial.
project: Autumn lead generation campaign
background: B2B accounting software, 40 percent of trials come from organic search
objective: Increase qualified demo requests from 120 per month to 180 per month by 31 January
primary_kpi: Qualified demo requests (form submissions that pass sales qualification)
secondary_kpis:
- Cost per qualified demo request
- Landing page conversion rate
audience: Finance managers at companies with 20 to 200 employees
deliverables:
- 3 landing page variants
- 12 search ad groups
- 4 email nurture messages
budget:
media: 15000 per month
fees: 4000 per month
timeline:
kickoff: 2026-12-01
first_drafts: 2026-12-12
launch: 2026-12-19
constraints:
- Follow the brand guidelines
- No unsubstantiated performance claims
approvals: Marketing lead signs off within 3 working days
reporting: Weekly dashboard, monthly review callNotice what the fields do together:
backgroundandaudiencegive context.objective,primary_kpiandsecondary_kpisdefine success.deliverables,budgetandtimelinedefine the boundaries of the work.constraintsandapprovalsdefine the rules of engagement.reportingdefines how you will both see progress.
How the parts depend on each other
The parts are not independent. Changing one forces changes in others. This is the working model to keep in mind.
Practical consequences:
- If you change the objective, the deliverables and budget probably need to change too.
- If the budget is cut, either the scope shrinks or the target drops. Say which.
- If tracking is not in place, the objective cannot be measured, however well it is written.
Write the brief in the order of the diagram. Starting with deliverables ("we need a landing page and some ads") before the objective is the most common cause of a brief that describes tasks but not outcomes.
Outcomes versus tasks
A brief should state the outcome you need and let the supplier propose how to reach it. It should also state any tasks you are certain you need.
| Approach | Example | Effect on supplier |
|---|---|---|
| Outcome only | "Raise qualified demo requests to 180 per month" | Supplier proposes channels and deliverables. Quotes vary widely. |
| Task only | "Build three landing pages and run search ads" | Supplier does the tasks. Nobody checks whether they work. |
| Outcome plus required tasks | The objective, plus "3 landing page variants, 12 search ad groups" | Quotes are comparable and success is still measured. |
The third approach is what the sample brief uses. Use it when you already know some of the work you need, and say which deliverables are fixed and which are open to the supplier's advice.
When a brief is worth the effort
Write a full brief for any work where the supplier's output will cost real money or affect your brand. Examples are a campaign, a website rebuild, an ongoing paid media account or a content programme.
For small, well-understood tasks, such as resizing a banner, a short brief is enough. Keep the same logic in a few lines: what you need, the format, the deadline and who approves. A short brief still names a deadline and an approver, because those two fields prevent most small-job delays.
A brief also has a cost of being wrong. If you are unsure of the objective, say so in the brief and ask the supplier to help define it as a first, paid stage. That is better than inventing a target you do not believe.
Who writes it and who reads it
The brief owner is the person in your organisation who can answer questions and approve work. Name that person in the brief. Suppliers lose days when questions go to someone who has to ask someone else.
The readers include the supplier's account lead, strategist, creatives and analysts. Each looks for different things. The analyst scans for KPIs and tracking, and the creative looks for audience and tone. Write headings that let each reader find their part quickly.
Before sending, give the brief to a colleague who is not on the project. If they cannot say what success looks like and when the work is due, the brief is not ready.
Common errors in a brief's purpose
- Treating the brief as a one-time email. The brief is a living reference. Keep a version number and date, and record changes.
- Listing tasks with no objective. The supplier completes them and success is undefined.
- Hiding constraints. Brand rules, legal limits and past failures should be in the brief, not discovered after the first draft.
- Setting a target with no baseline. "Double our leads" means nothing without the current number and the period it was measured in.
- Leaving out the budget. Suppliers then guess. Giving a range is better than giving nothing.
Summary of working rules
- Write the brief to transfer context, define success, set boundaries and create a shared reference.
- State outcomes with a metric, baseline, target and deadline.
- Build the brief in dependency order: context, objective, audience, scope, budget, timeline, constraints, tracking.
- Name an owner and an approver.
- Test the brief on someone outside the project before sending.
Exercise
A colleague drafts this brief line: "Run social ads and an email campaign to get more sign-ups before year end." Name three things missing, and rewrite the line as a measurable objective using these facts: 300 sign-ups per month now (October), a target of 450, a deadline of 31 January, and a cost limit of 40 per sign-up.
Show answer
Missing: a measurable metric with a baseline and target, a specific deadline ("year end" is ambiguous and does not match the real date), and a cost limit. The scope is also unclear, since "social ads" and "an email campaign" have no quantities. Rewrite: "Increase sign-ups from 300 per month (October baseline) to 450 per month by 31 January, at a cost per sign-up no higher than 40."
Exercise
Your budget is cut by 30 percent after the brief is sent, and the supplier has already started. Using the dependencies between brief parts, which two other parts must you revisit, and what are your two options?
Show answer
Revisit the objective (target) and the scope and deliverables. The two options are to reduce the scope while keeping the target, or to lower the target while keeping the scope. State the choice in writing and update the brief version.