Sub topic 15
Worked example: classifying a breach and choosing a response
This chapter applies the whole framework to one fact pattern. It assumes you have read the earlier chapters on promises and conditions, minor and material breach, the Restatement (Second) of Contracts section 241 factors, substantial performance, cure, damages, and the choice to terminate or continue. It is general education, not legal advice. Rules differ by jurisdiction.
The facts
Dana Ortiz owns a café. She signs a $120,000 contract with Keller Build to renovate it. The contract has these terms:
- Keller will finish by June 1.
- Dana pays in installments, with a final $30,000 due on completion.
- The specifications call for a named exhaust hood and "Arctic White" quartz counters.
- The contract has no time-of-the-essence clause and no termination clause.
Keller finishes on June 10. Dana finds three problems:
- The work was ten days late.
- The counters are a slightly warmer white than the specified shade. Replacing them would cost about $4,000.
- The exhaust hood fails the fire inspection. Keller says it can fix the hood in two weeks for about $7,000. The café cannot open until the hood passes.
Dana is angry. She wants to refuse the final payment, fire Keller, and hire someone else.
Step 1: Identify the duties and the breaches
Start by listing what each side promised, then compare it with what happened. Do not start by asking whether the breach is material. Each problem is a separate possible breach.
- Late completion: Keller promised to finish by June 1. Finishing June 10 is a breach, because any unexcused failure to perform a promise is a breach.
- Wrong counter shade: The specifications are a promise about the quality of the work. A different shade is a breach.
- Failed hood: The contract required a working installation that meets code. The fire inspection failure is a breach. A court might find an implied duty to meet code even if the text is silent, so check the contract language.
Dana's duty to pay the final $30,000 may be conditioned on completion. Whether she may withhold it depends on how the breaches are classified. That is the next step.
Step 2: Check for conditions and special terms
Look for express conditions, time-of-the-essence language, and termination clauses. Each one can change the analysis. This contract has none. The consequences are:
- The June 1 date is an ordinary promise. Courts usually treat a modest delay in a construction contract as minor unless the contract or the circumstances make timing critical.
- Dana has no contractual right to terminate for a defined event. She can terminate only if the common law allows it, which means only for a material breach.
- Dana's duty to make the final payment is probably tied to substantial completion. It is not tied to perfect completion unless the contract says so.
Step 3: Weigh materiality factor by factor
Section 241 lists the factors. Apply them to each breach separately, and then to the problems together. A table keeps the weighing visible.
| Factor | Delay (10 days) | Counter shade | Failed hood |
|---|---|---|---|
| Loss of the reasonably expected benefit | Small. The café lost ten days, but the work is otherwise complete. | Very small. The counters work and look nearly the same. | Large for now. The café cannot legally open. |
| Adequacy of damages | High. Lost days can be priced. | High. The price difference is about $4,000. | Fairly high. Repair cost plus proven lost profit is measurable. |
| Forfeiture risk for Keller | Low if the contract continues. | Low. | Serious if Dana terminates. Keller has done nearly all of $120,000 of work and could lose the unpaid balance. |
| Likelihood of cure | Not applicable. Time cannot be restored, but damages cover it. | Possible, though replacement is wasteful. | High. Keller offers a fix in two weeks. |
| Good faith and fair dealing | No sign of bad faith. | No sign of bad faith. | Keller is cooperating and offering to repair. |
The delay and the counter shade are minor breaches. The hood is the hard question. It deprives Dana of something important, since she cannot open, but the harm can be priced and fixed, and Keller is willing to fix it. A court is likely to treat the hood defect as a curable breach, not as a failure that goes to the root of the bargain. That is a prediction. A court could weigh it differently if the timing were critical or if Keller had a record of failed repairs.
Step 4: Apply substantial performance
The substantial performance doctrine fits this contract well. Keller built almost everything, and the remaining defects can be repaired or compensated in money. Under that doctrine, Keller can usually recover the contract price minus the cost of fixing the defects, and Dana's own duty to pay is not excused. A rough measure:
- Final payment due: $30,000
- Less cost to repair the hood: $7,000
- Less price difference or replacement for counters: up to $4,000
- Less proven delay losses, if any
Courts differ on whether the measure of the counter defect is repair cost or loss in value. Replacing counters that work and look nearly identical may be considered economic waste, so a court might award only the small difference in value. Check local law on this point.
Step 5: Decide what the classification allows
The classification determines Dana's options.
- If the breaches are minor: Dana must keep performing, which means she must still pay what she owes. She may recover damages or deduct them from what she owes.
- If the hood problem were material: Dana could suspend her own performance. After Keller fails to cure within a reasonable time, she could terminate and hire a replacement. Section 242 of the Restatement (Second) of Contracts lists the circumstances that bear on how long she must wait.
Keller's cure offer is a significant fact. It makes the hood problem less likely to be found material, and it limits the time Dana must tolerate before she can act. If Keller refuses to repair or stops responding, the likelihood-of-cure factor flips, and the analysis moves toward material breach.
Step 6: Choose a response and weigh the risk
The central risk is that Dana terminates, a court later finds the breaches minor, and Dana becomes the breaching party. Then Keller could recover its unpaid balance, less offsets, and Dana would owe damages for her wrongful termination. The consequences are asymmetric. Waiting a short, defined period costs Dana little. Terminating wrongly can cost her far more.
A prudent sequence looks like this:
- Send written notice listing each defect and demanding a cure by a specific, reasonable date.
- Reserve all rights in writing, including the right to damages for delay.
- Pay or withhold only an amount reasonably tied to the defects and delay, such as the repair cost plus proven damages. Withholding the entire $30,000 over defects worth far less invites a claim that she breached.
- Keep records of lost revenue and mitigation steps, such as rescheduling the opening and booking an inspector.
- Reconsider terminating only if Keller misses the cure date or repudiates.
Dana also has a duty to mitigate. She cannot let losses grow by refusing a reasonable repair. Lost profits are recoverable only if they were foreseeable and proven with reasonable certainty, and a café that never opened before may find lost profits hard to prove.
Variations that change the result
Change one fact and the answer can change.
- Time of the essence: Suppose the contract said "time is of the essence" and Dana had a booked grand opening on June 1. The delay could then be material, because the parties agreed that timing mattered.
- Refusal to fix: If Keller says it will not repair the hood, cure is unlikely. Dana can treat the breach as material and may be justified in terminating, after any required notice.
- Bad faith: If Keller knowingly installed a cheaper hood to save money, the good-faith factor weighs toward materiality.
- Accepting benefits: If Dana opens the café, uses the work, and keeps paying without objection, she may weaken a later claim that the breach justified termination. She keeps her damages claim.
- Goods: If the dispute were only over delivery of goods, the UCC perfect tender rule would give a buyer more room to reject than the common law does. Installment and cure provisions would then matter.
Exercise
Keller refuses to fix the hood and stops returning Dana's calls after she sends written notice demanding repair within 14 days. The deadline passes. Which factors in section 241 now shift toward materiality, and what may Dana do?
Show answer
The likelihood of cure now weighs strongly toward materiality, because Keller has refused to repair and has stopped communicating. The good-faith factor may also shift if the silence looks like abandonment. The loss of the expected benefit is still large, because the café cannot open. Dana likely can treat the hood problem as a material breach, terminate after the cure period she gave has passed, hire another contractor, and recover her reasonable cost of completion and repair above the contract price, plus proven foreseeable losses, subject to her duty to mitigate.
Exercise
Why is it risky for Dana to withhold the entire $30,000 and fire Keller on June 11 when the only defects are a ten-day delay, a counter shade difference, and a hood that Keller offers to fix in two weeks?
Show answer
The breaches are probably minor or curable, so Keller has substantially performed. A minor breach does not excuse Dana's duty to pay, and she has not given Keller a reasonable chance to cure. If a court agrees, Dana's termination is itself a breach. She would owe Keller the unpaid balance less offsets for the defects, and she could face damages for wrongful termination. A safer course is written notice, a cure deadline, and withholding only an amount tied to the defects and proven damages.