Sub topic 5
Finding the Numbers Behind Your Work
Assume you already have a LinkedIn profile, a rough list of roles, and basic experience editing your Experience section. This chapter focuses on finding evidence for your results. You do not need perfect data. You need a reasonable baseline, a clear change, and enough context for the reader to understand what you did.
Start with a baseline
A baseline is the starting point before your work changed something. Without a baseline, a claim such as “improved performance” is difficult to judge.
Look for measurements that describe the old state:
- Time: “Reports took two days to prepare.”
- Volume: “The team handled about 200 requests each week.”
- Rate: “The form converted 4% of visitors.”
- Cost: “The process required 12 hours of manual work each month.”
- Quality: “About 8% of orders needed correction.”
- Scope: “The service supported 15 internal teams.”
Then identify the later state. The difference between the baseline and the later state gives you the change.
| Measurement | Baseline | Later state | Possible result |
|---|---|---|---|
| Report preparation time | 2 days | 4 hours | Reduced preparation time by 75% |
| Weekly requests | 200 | 320 | Supported a 60% increase in volume |
| Error rate | 8% | 3% | Reduced errors by 5 percentage points |
Be precise about the type of change. A drop from 8% to 3% is a reduction of 5 percentage points, or a 62.5% relative decrease. Those are different claims.
Search the records you already have
Start with sources connected to the work, rather than guessing from memory. Useful sources include:
- Project dashboards and analytics reports
- Customer support or service-management systems
- Finance, sales, or operations reports
- Deployment records and incident summaries
- Survey results and quality reviews
- Planning documents that state the original target
- Your calendar, task history, or time tracking
Search for comparisons. Words such as “before,” “after,” “target,” “average,” “monthly,” “quarterly,” “adoption,” and “reduced” often lead to useful evidence.
Ask colleagues for context when the data belongs to a shared system. A manager, analyst, or project owner may know whether a figure covers the whole team, one region, or only a short period.
Connect the number to your action
A number becomes persuasive when the reader can see the connection between your action and the change. Record four details:
- What was the starting condition?
- What did you change?
- What was the later condition?
- Over what period did the change occur?
Use this working pattern:
Accomplished [outcome], as measured by [evidence], by doing [action].For example:
Reduced average escalation resolution time from 3 days to 1 day over six months by introducing a shared triage checklist for 8 support agents.The timeframe limits the claim. It shows when you observed the change and prevents a reader from assuming that the result lasted forever.
Check what the number really proves
A useful figure can still mislead if you assign yourself too much credit. Separate your contribution from the team’s total outcome.
Compare these statements:
- “Increased company revenue by 40%” may overstate your role if you supported one part of the sales process.
- “Built the reporting dashboard used by the sales team during a 40% revenue increase” accurately describes your contribution without claiming sole credit.
Use words such as “helped,” “supported,” “contributed to,” or “co-led” when the result depended on several people. These words do not weaken a truthful achievement. They identify your role.
A confidential number does not need to appear in the entry. Replace it with a percentage, range, rounded figure, or scale description if that still communicates the impact. Check company policy and agreements before publishing internal data.
Build a small evidence table
Before writing, collect the facts in a private note. Include the source and your role.
| Fact to capture | Example |
|---|---|
| Baseline and later state | 40 minutes became 6 minutes |
| Action | Batched database queries |
| Timeframe | During the first quarter |
| Scope | Billing service for paying customers |
| Evidence source | Performance dashboard |
| Your role | Designed and implemented the change |
This table helps you distinguish a measured result from an assumption. It also makes future updates easier when the numbers change.
Exercise
A weekly manual report took one full day before you automated part of it and now takes three hours. Write a result statement that includes the action, change, and timeframe, without claiming more than the evidence shows.
Show answer
Reduced weekly manual reporting from one full day to three hours over two months by automating the data-collection step.