Sub topic 5
Finding the Numbers Behind Your Work
This chapter assumes you already know the result statement formula from the previous chapter: an action, a measurable change and its context. It also assumes you can edit a LinkedIn Experience entry and have a rough list of your past roles and duties. Here you will learn where the numbers for that formula come from and how to calculate and check them.
What a useful number contains
A number in an Experience entry needs three parts. If one is missing, the reader cannot judge the claim.
- Baseline: how things stood before you acted. "From 3 days" is a baseline.
- Change: the new value, or the size of the shift. "To 1 day" is the change.
- Timeframe: how long the change took, or the period it covers. "Over six months" is a timeframe.
Compare these two lines:
Improved escalation handling.
Cut average escalation resolution time from 3 days to 1 day over six months.The first line has no number at all. The second gives the baseline, the new value and the period. A reader can see how large the improvement was and whether it lasted.
A fourth part, scope, is often worth adding. Scope says how much of the business the number covers: one team, one region, every paying customer. "Reduced invoice generation time from 40 minutes to 6 minutes" is stronger when the entry also says the billing service is used by all paying customers.
Where to look for numbers
Most people think they have no numbers because they never tracked any. The numbers usually exist somewhere else. Search these places before you give up.
| Source | What it can give you | Example |
|---|---|---|
| Dashboards and reports | Volumes, rates, trends | Weekly ticket counts, signups per month |
| Ticketing or project tools | Cycle times, backlog size, counts | Average days to close a ticket |
| Performance reviews and self-assessments | Goals and whether you met them | "Target 90% on-time delivery, achieved 96%" |
| Emails and chat messages | Praise with figures, status updates | A manager's note about a launch |
| Old resumes and applications | Figures you already wrote down | A bullet from three years ago |
| Calendar and time tracking | Hours spent before and after a change | Reporting time before and after automation |
| Project documents | Budgets, headcount, deadlines, user numbers | Project kickoff and closing documents |
| Colleagues and managers | Figures you cannot access any more | A former teammate who kept the report |
If you have left the company, you may no longer have access to internal tools. Use what you saved, ask a former colleague for a general figure, or use the approximation methods later in this chapter.
Six kinds of metrics
When you cannot see a number, ask which kind of change your work produced. Each kind suggests where to look.
- Volume: how much you handled or produced. Examples are tickets closed, orders processed or articles published.
- Speed: how long something took. Examples are resolution time, build time or time to hire.
- Quality: how often things went right or wrong. Examples are error rate, defect count or satisfaction score.
- Money: revenue gained, cost avoided or budget managed.
- Scale: the size of what you worked on. Examples are users served, team size or number of sites.
- Adoption: how many people used what you made. Examples are how many teams copied your template or how many new hires followed your guide.
Many jobs have a result in more than one category. A support agent who writes a better macro (a saved reply) may improve speed, quality and adoption at once. Pick the one that best matches the goal of your next role.
A method for building the numbers
Work through the steps in this order. The flowchart below shows the same path.
- Pick one task. Choose a single project or responsibility. Working on your whole job at once produces vague answers.
- Ask what changed because of it. Something was slower, costlier, messier or less used before you acted. Name it in one sentence.
- Find the baseline. Look for the figure from just before your change. If you joined mid-stream, the earliest figure you can find is your baseline.
- Find the new value. Use a figure from after the change had time to settle. A number from the first week is less reliable than one from the third month.
- Fix the timeframe. Record the dates of both figures. This also shows whether the result lasted.
- Calculate the change. Use the code below, or do it by hand.
- Check your part. Decide what you did and what the team did. The chapter on accuracy and attribution covers wording for shared results.
Calculating the change
Percent change is the difference between the new value and the baseline, divided by the baseline. A short script keeps your arithmetic consistent across entries.
def percent_change(baseline: float, new_value: float) -> float:
"""Return the percent change from baseline to new_value."""
if baseline == 0:
raise ValueError("Baseline is zero; report the absolute change instead.")
return (new_value - baseline) / baseline * 100
examples = [
("Newsletter signups per month", 1200, 1620),
("Escalation resolution (days)", 3, 1),
("Invoice generation (minutes)", 40, 6),
]
for label, before, after in examples:
change = percent_change(before, after)
print(f"{label}: {before} -> {after} = {change:+.1f}%")Running it prints:
Newsletter signups per month: 1200 -> 1620 = +35.0%
Escalation resolution (days): 3 -> 1 = -66.7%
Invoice generation (minutes): 40 -> 6 = -85.0%Notice the signs. A drop in resolution time is good, but the percent change is negative. When you write the entry, say "cut" or "reduced" and drop the minus sign. Also round sensibly. "Cut resolution time by about two thirds" reads better than "by 66.7%".
Choosing how to state the number
The same change can be written several ways. Pick the version that is honest and easiest to grasp.
- Give the raw values when the baseline is small. "Grew from 2 to 5 clients" is clearer than "grew 150%". A large percentage on a tiny base can sound like an exaggeration.
- Give the percentage when the baseline is large. "Cut costs by 12%" tells more than "cut costs from 1,483,200 to 1,305,216".
- Give both when space allows. "Increased newsletter signups by 35% (from 1,200 to 1,620 per month)" lets the reader check the claim.
- Use ranges for variable results. "Handled 40 to 60 tickets a day" is more truthful than a single peak day.
- Use rates for work that depends on volume. "Resolved 95% of tickets within one business day" holds up when ticket counts change.
Edge cases that distort numbers
Some numbers look strong but do not survive a question from the reader. Check for these before you publish.
- Seasonality. A retail team that compares December to January will see a drop that has nothing to do with its work. Compare the same period in two years, or state the period.
- Changes you did not cause. If a price cut drove the sales rise, do not credit yourself with all of it. Claim the part you can defend, such as "supported a 20% sales rise by running the launch email series".
- Team results. "Grew the team's pipeline by 40%" is accurate if you were one contributor. "Grew the pipeline by 40%" claims it alone.
- Moving baselines. If your company redefined a metric halfway through, the before and after values may not compare. Use figures from the same definition.
- Short timeframes. A gain over one week may not last. If the data only covers a short period, say so.
- Vanity numbers. Page views and followers are easy to count but may not matter to the employer. Prefer numbers tied to money, time saved or quality when you have them.
- Division by zero. If the baseline was zero, as with a brand new process, a percentage is meaningless. Report the absolute number: "Launched the first customer webinar series; 6 sessions drew 410 registrants."
Estimating when records are gone
If you cannot find the original figure, you can still build an honest estimate. Use a known quantity and simple arithmetic, and label the result approximate.
Weekly report took me about 8 hours.
After the template, it took about 2 hours.
Reduced weekly manual reporting from about 8 hours to about 2 (approximate, based on my own time tracking).The label matters. "Approximate" and "based on" tell the reader how the figure was made. Do not round up to a more impressive number, and do not state an estimate as an exact figure. The next chapter covers cases where you have no figures at all.
A short worked example
Suppose your duty is "Responsible for the monthly sales report." Work through the steps.
- Task: the monthly sales report.
- What changed: you automated the data pull, so the report took less time and had fewer errors.
- Baseline: a calendar search shows two full days each month. Corrections came back about three times per report.
- New value: after automation, half a day, and a correction about once every few months.
- Timeframe: a change made in March, with results checked through August.
- Result: time fell from 16 hours to 4 hours, a 75% reduction.
Cut monthly sales report preparation from two days to half a day (a 75% reduction) and
nearly eliminated correction requests by automating the data pull in March.Every part of the number has a source, and you can explain each one in an interview.
Key points
- A useful number has a baseline, a new value and a timeframe, and often a scope.
- Look in dashboards, tickets, reviews, emails, old resumes and project documents, and ask former colleagues.
- Use raw values for small bases and percentages for large ones, or give both.
- Check for seasonality, shared credit, changed definitions and short timeframes.
- When records are gone, estimate from known quantities and label the figure approximate.
Exercise
A coordinator scheduled interviews. Records show scheduling took an average of 5 days per candidate in January and 2 days in June, after she introduced a shared booking calendar. Calculate the percent change, then write a one-sentence result statement that includes the baseline, the new value and the timeframe.
Show answer
Percent change = (2 - 5) / 5 × 100 = -60%, so scheduling time fell by 60%. Sample statement: "Cut interview scheduling time from 5 days to 2 days per candidate (60%) between January and June by introducing a shared booking calendar."
Exercise
A marketing assistant says: "Sales went up 200% after my campaign." The baseline was 3 sales a month, the campaign ran during a holiday month, and two other teams ran promotions at the same time. Name two problems with the claim and suggest a more defensible rewrite.
Show answer
Problems: the base is tiny, so a percentage overstates the result, and the claim credits the campaign for a rise that the holiday and the other promotions may have caused. A more defensible rewrite: "Contributed to growth from 3 to 9 monthly sales during the holiday period by running an email campaign alongside two other promotions."