Sub topic 15
Reviewing and signing off a spec
This chapter assumes you can already write a feature spec with intent, rules, edge cases, and acceptance criteria. It also assumes you have worked in a sprint or milestone cycle with design, engineering, art, audio, and QA. Here the question is how a draft becomes a spec the team agrees to build.
What review is for
A review checks whether the spec is ready to build from. It is not a vote on whether the feature is a good idea, and it is not a place to redesign the feature. Those debates belong earlier, in pitches and design discussions.
A review should answer three questions:
- Can each discipline build its part from this document without guessing?
- Can QA test the result without asking the author what was meant?
- Do the people who own cost, schedule, and quality accept the scope?
A spec that passes review is a shared commitment. Everyone has read it, raised their concerns, and agreed to work from it. Sign-off records that commitment.
Choosing reviewers
Pick reviewers by what they must do with the spec. Each one reads it through the lens of their own work.
| Reviewer | What they check |
|---|---|
| Engineering | Rules are implementable, dependencies and constraints are listed, performance and tech risk are acknowledged |
| Animation, art, audio | Content needs are listed, state changes they must support are clear, timing is defined |
| QA | Acceptance criteria are testable, edge cases are covered, nothing relies on "feels right" |
| Design peer | Rules match the intent, the feature fits the rest of the game, no conflicts with other specs |
| Producer or lead | Scope fits the schedule, priorities are marked, open questions have owners |
Keep the group small. Reviewers who have no work to do with the spec add delay and comments that don't help. Five to seven people is common. Name them in the spec's Status section, as the dash template does with "Reviewers: Engineering, Animation, QA".
Review flow
The flow below shows a typical path. Review is a loop, and a spec may go around it more than once.
The Status field in the spec should always show the current state. A reader who opens an old link must be able to tell at once whether the document is a draft or the agreed version.
Giving the author a way to ask for help
Before the formal review, the author can run a short self-check. This catches the problems that waste reviewers' time.
- Does the design intent say what the player should experience and how you will judge success?
- Does every rule use one clear term for each thing?
- Is each edge case either handled or listed under open questions?
- Does every rule have at least one acceptance scenario?
- Are tuning values in the tuning file, not scattered in the rule text?
- Does every open question have an owner?
A spec that fails this list is not ready, and sending it out only moves the work onto the reviewers.
Running the review
There are two common formats. Many teams use both.
- Asynchronous review. Reviewers read the document and leave comments in their own time, within an agreed window such as two working days. This works well for small features and for distributed teams.
- Review meeting. The author walks the group through the spec, usually for 30 to 45 minutes. This works better for large or risky features, where discussion between disciplines finds problems that written comments miss.
A good pattern is to collect written comments first, then hold a meeting only for the comments that need discussion. The meeting then starts from known disagreements instead of a page-by-page reading.
Writing useful comments
Reviewers should make each comment specific and tag its weight. A simple scheme works well:
- Blocker: The feature cannot be built or tested correctly until this is fixed.
- Concern: A risk or weakness that the author should consider, but that does not stop work.
- Question: The reviewer needs information to continue.
- Suggestion: An optional improvement.
Compare two comments on the dash spec.
Weak: "The dash rules are unclear."
Strong: "Blocker: Rule 2 says the dash goes in the facing direction when there is no input, but the spec does not say what happens when the player is facing a wall. Edge cases cover dashing into a wall during a dash, not starting one. Please state whether the dash starts and whether the cooldown is spent."
The strong version names the rule, shows the gap, and says what answer is needed. The author can fix it in minutes.
Resolving disagreements
Reviewers will sometimes disagree. For example, engineering may want to remove air dashes to cut complexity, while design says they are central to the intent.
Follow these steps:
- Restate the disagreement in terms of the design intent and the constraints. Most disagreements are really about priority or cost.
- Look for options that meet both needs, such as a Must/Should/Could split that ships ground dash first and air dash later.
- If no option works, the decision owner decides. Decide this owner before the review starts. It is usually the feature's design lead, with the producer deciding on schedule conflicts.
- Record the decision and the reason in the spec so the argument is not repeated.
What sign-off means
Sign-off is each reviewer stating that the spec is good enough for their discipline to start work. Agree on this meaning in advance, because people read it differently. Some take it to mean "I like it." Others take it to mean "I accept responsibility for the result."
A workable definition is: "I have read this spec, my concerns are resolved or recorded, and I can plan my work from it."
Record sign-off in a visible place in the spec. The format matters less than being able to see who agreed to which version.
## Sign-off
Version: 1.2
Status: Approved
| Role | Name | Date | Notes |
| --- | --- | --- | --- |
| Design lead | A. Rivera | 2026-11-24 | |
| Engineering | J. Okafor | 2026-11-25 | Wall-start behavior needs prototype check |
| Animation | M. Chen | 2026-11-25 | |
| QA | S. Novak | 2026-11-26 | |
| Producer | L. Haas | 2026-11-26 | Air dash is Should, not Must |Notes carry conditions. If engineering approves with a note that a behavior needs a prototype check, that check should also appear under open questions with an owner. Otherwise the condition gets forgotten.
Approval levels
Not every spec needs the same rigor. Scale it to the risk.
| Feature size | Review approach |
|---|---|
| Small tweak, low risk | One design peer and one engineer, asynchronous |
| Standard feature | Full reviewer set, asynchronous comments, short meeting if needed |
| Large or cross-team feature | Full reviewers, a meeting, and explicit lead approval of scope and schedule |
Approved does not mean frozen
Sign-off does not mean the spec never changes. During production, you will learn things that the spec could not predict. After approval, changes go through the team's change process, which a later chapter covers. For now, remember two rules:
- Do not edit an approved spec silently. Change the version number, note what changed, and tell the people affected.
- A change that affects scope, schedule, or another discipline's work needs the relevant reviewers to approve again.
Common review problems
- Rubber-stamping. Reviewers approve without reading. Counter this by asking each reviewer to name one risk or one question.
- Late reviewers. A reviewer who joins after work has started demands changes. Name reviewers early and set a deadline.
- Review of the wrong thing. Comments argue about the idea instead of the document's clarity. Redirect to the question of whether the team can build and test from the spec.
- No owner for decisions. Comments pile up with no resolution. Name a decision owner before review begins.
- Approval with unrecorded conditions. A verbal "fine, but..." disappears. Put it in the Notes column and in open questions.
Exercises
Exercise
A QA reviewer comments on the dash spec: "Acceptance criteria are weak." Rewrite this as a useful comment, using the comment weights from this chapter, based on the fact that the spec has no scenario for dashing in the air after the one allowed air dash is used.
Show answer
Example: "Blocker: Air dashes per jump is 1 in the tuning file, but no scenario covers a second air dash attempt in the same jump. Please add a scenario, for example 'Given the player has used their air dash, When the player presses Dash in the air, Then no dash starts.'" The comment names the missing case, explains why it matters, and states the fix. It is a blocker because QA cannot test the limit without it.
Exercise
Engineering approves a spec but says verbally, "I'm fine as long as the rope-swing interaction works." Where should this condition be recorded, and why?
Show answer
Record it in the Notes column of the sign-off table and add it to the Open questions section with an owner and a due date. A verbal condition is easily forgotten. Recording it in both places makes it visible to the team and gives someone responsibility for resolving it.
Exercise
Design wants air dashes in the first release. Engineering says they would add two weeks. Both cite the design intent. Describe how you would resolve this.
Show answer
Restate the disagreement as priority and cost. Check whether the intent can be met with ground dash alone. If so, mark ground dash Must and air dash Should or Could, and ship the first part first. If not, the decision owner, named before the review, decides, possibly with the producer on schedule. Record the decision and its reason in the spec.