Sub topic 10
Set up review and approval
This chapter assumes you have the calendar template from the earlier chapters, with its owner, approver, caption_status, asset_status, and status columns. It also assumes you can read a short Python script. Review and approval is the step that sits between batch production and scheduling. A post that skips it can publish with a wrong link, an off-brand claim, or a legal problem. A post stuck in it misses its slot. The goal is a workflow that catches real errors without slowing the calendar down.
What the approval workflow has to do
An approval workflow answers four questions for every post:
- Who checks it, and for what?
- By when must they respond?
- What happens when they ask for changes?
- What state is the post in right now?
If the answer to any of these lives only in someone's inbox, the calendar cannot show it, and the team will find out about a stalled post when it is already late. Put the answers in the calendar itself.
Define roles
Keep the number of roles small. Each extra reviewer adds delay and dilutes responsibility.
| Role | Responsibility | Calendar field |
|---|---|---|
| Owner | Writes the caption, prepares or briefs the asset, moves the post to review | `owner` |
| Approver | Gives the single final yes or no | `approver` |
| Specialist reviewer | Checks one narrow thing, such as legal wording, product accuracy, or accessibility | Noted in a comment or an extra column |
| Scheduler | Loads the approved post into the publishing tool | Often the owner |
Name exactly one approver per post. If two people must both sign off, the calendar should say which one has the final word. Otherwise each assumes the other will catch problems, or each waits for the other to go first.
Specialist reviewers are conditional. Only some posts need them: a claim about pricing, a customer testimonial, a regulated topic, a partner mention. Define the triggers in advance so the owner knows when to involve them. For example, "any post naming a customer needs written permission recorded in the notes".
Use a small set of statuses
The status column is the workflow's state. Use a short, fixed list so filters and counts work. Free-text statuses such as "almost done" cannot be sorted or checked by a script.
A workable list is idea, drafted, in review, changes requested, approved, scheduled, and published.
Two transitions deserve attention.
- Changes requested returns to drafted, not to approved. The post has to go through review again. Otherwise "approved with minor edits" becomes a loophole for unreviewed text.
- Editing an approved post sends it back to in review. This includes changing a link, swapping an image, or rewording the call to action. Treat any content change after approval as a new submission. Without this rule, the approved version and the published version silently differ.
Keep caption and asset status separate
The template tracks caption_status and asset_status as separate columns. Approval should respect that split. A caption can be approved while the design is still in progress. The overall status should only move to approved when both columns read approved. If your tool allows it, make that a rule or a formula. If it does not, add it to the reviewer checklist.
Give the approver something to check
Reviewers are faster and more consistent when they have a checklist, and owners make fewer mistakes when they run it before submitting. Keep it to what a person can verify in a couple of minutes:
- The caption matches the content pillar and the stated goal of the post.
- Spelling, names, and numbers are correct.
- Every link opens the intended page and carries the right tracking parameters.
- The asset has the right dimensions for the platform, and the text on it is readable on a phone.
- Images and video have alt text or captions where the platform supports them.
- Hashtags and mentions are correct and tagged accounts are the right ones.
- Claims, testimonials, and partner references have the permissions they need.
- The scheduled time and time zone are correct.
The last item connects to the next chapter on scheduling. Many errors that look like approval failures are actually time zone mistakes caught too late.
Set deadlines backward from the publish date
An approval step without a deadline is a request that can be ignored. Work backward from date:
- The owner submits for review at least a set number of days before publishing.
- The approver responds within a fixed window, often one business day.
- A fix-and-resubmit cycle needs its own buffer.
- The scheduler needs time to load the post before the slot.
A common pattern is: submit 5 days ahead, approve by 3 days ahead, scheduled by 2 days ahead. The exact numbers depend on your team. What matters is that they are written down, apply to every post, and are generous enough for one round of changes.
You can check the deadline mechanically. This script reads the calendar and flags any post whose approval deadline has arrived but whose status is not yet approved:
import csv
import io
from datetime import date, timedelta
CALENDAR = """date,platform,topic,owner,approver,status
2026-03-02,LinkedIn,3 mistakes in onboarding emails,Ana,Raj,in review
2026-03-04,Instagram,Customer story: first month,Li,Raj,idea
2026-03-06,LinkedIn,Spring webinar announcement,Ana,Raj,scheduled
"""
APPROVAL_LEAD_DAYS = 3
DONE_STATES = {"approved", "scheduled", "published"}
def overdue(rows, today):
for row in rows:
publish = date.fromisoformat(row["date"])
deadline = publish - timedelta(days=APPROVAL_LEAD_DAYS)
if row["status"] not in DONE_STATES and today >= deadline:
yield row, deadline
rows = csv.DictReader(io.StringIO(CALENDAR))
today = date(2026, 2, 27)
for row, deadline in overdue(rows, today):
print(
f"{row['date']} {row['platform']} '{row['topic']}': "
f"status '{row['status']}', approval was due {deadline.isoformat()}, "
f"chase {row['approver']}"
)With today set to 27 February 2026, this prints one line: the LinkedIn post for 2 March is still in review and its deadline is today. The Instagram post is not flagged yet because its deadline is 1 March. Running a check like this each morning, or using the equivalent filter in your spreadsheet, turns a vague worry into a short list.
Handle delays and escalation
Approvers get busy. Decide what happens when they do not respond, before it happens:
- Reminder. The owner or a bot nudges the approver when the deadline arrives.
- Backup approver. A named second person can approve when the first is out. Record this on the calendar so nobody has to guess.
- Default action. Decide whether a late post is delayed, swapped for a pre-approved evergreen post, or published on the owner's judgment. Silence should never count as approval for anything with legal or reputational risk.
Pre-approved evergreen posts are useful here. They also serve as the fallback for the reactive buffer covered in a later chapter.
Match the level of review to the risk
Not every post needs the same scrutiny. A tiered model keeps the process light:
| Tier | Example | Review |
|---|---|---|
| Routine | Recurring tip series, using an approved template | Owner self-checks, approver spot-checks a sample |
| Standard | New educational carousel, event promotion | Full approver review |
| Sensitive | Customer story, pricing, health or financial claims, crisis response | Approver plus specialist reviewer |
Define which tier each pillar and format falls into. Applying full review to everything leads to rubber-stamping, because approvers stop reading carefully when most items are low risk.
Common errors
- Approval by chat message. "Looks good" in a thread is not recorded where the calendar can see it. Update the status in the same moment you reply.
- Reviewing a draft that later changes. Approve a specific version. Store the final caption and asset together, and link to them from the calendar row.
- Too many approvers. Each additional person adds waiting time and conflicting edits.
- Approving text but not the preview. Truncation, line breaks, and cropped images only show in the platform preview. Review that, not only the document.
- No record of who approved. Keep the approver's name and date in the row or the tool's history. It matters when a post is questioned later.
Exercise
A post's caption is approved, but its image is still in design. The owner wants to move the overall status to approved so the post appears ready. What should happen, and why?
Show answer
The overall status should stay in review or an earlier state until both caption_status and asset_status are approved. Approval applies to the whole publishable post. Marking it approved early hides the missing asset and lets the post be scheduled without a final check of how caption and image look together.
Exercise
Using the script above, change the rule so a post is flagged 5 days before publishing instead of 3. With today set to 2026-02-27, which of the three sample posts is flagged, and why?
Show answer
Set APPROVAL_LEAD_DAYS = 5. The 2 March LinkedIn post (deadline 25 February) and the 4 March Instagram post (deadline 27 February, status idea) are flagged. The 6 March post is not flagged, because its status is scheduled, which counts as done.
Exercise
An approver signs off on a LinkedIn post on Monday. On Tuesday the owner fixes a typo in the link and changes the status to scheduled. What rule was broken, and what should have happened?
Show answer
A content change was made after approval without resubmitting. The post should have returned to in review, so the approver could confirm the corrected link. Even a small change can break a link or alter meaning, and the approved version must match the published one.