Sub topic 3
Scoping and prioritizing
This chapter assumes you have already written goals, non-goals, and functional requirements for your PRD. You should be comfortable with requirement IDs and basic release planning.
Scoping and prioritizing
Scope is the set of requirements the team commits to for this release. Use your non-goals to remove items outside the problem. Then rank what remains with MoSCoW, which sorts requirements into four groups:
| Priority | Meaning |
|---|---|
| Must | The release fails without it |
| Should | Important, but a workaround exists |
| Could | Nice to have if time allows |
| Won't | Agreed out of scope for this release |
Record Won't items in the PRD. This stops the same idea from returning in every review.
Recording assumptions, dependencies, and risks
An assumption is a belief the plan relies on, such as "the payment provider supports refunds through its API." A dependency is work that another team or system must finish first. A risk is an event that could harm the release. For each one, write an owner, the effect if it proves false, and a date to check it. A risk without an owner is not being managed.
Tracking open questions and decisions
An open question is something no one has answered yet. Keep these in a numbered list with an owner and a due date. When an answer arrives, record the decision, the date, and the reason. Do not delete the question. The history explains later choices.
Planning the release and rollout
Split delivery into stages, such as an internal test, a beta group, and then all users. Tie each stage to an exit condition, for example "error rate below the agreed threshold for one week." Name the rollback plan too. If a stage fails, the team should already know what it will do.
Reviewing the PRD and aligning stakeholders
Send the draft to engineering, design, support, and the business owner. Ask each reviewer one question: "What would stop you from starting?" Track comments in the document. Mark the PRD approved only after each stakeholder accepts the scope, and write the approval date at the top.
Keeping the PRD current
A PRD describes the plan, and the plan changes. When scope changes, update the Won't list and the release plan first. Add a changelog entry with the date and reason. Remove outdated text instead of striking it through, so readers see one current version.
Exercise
Exercise
A requirement is marked "Must," but no engineer is available to build it this quarter. What should the PRD record?
Show answer
Either move the requirement to Won't for this release with a stated reason, or record the capacity gap as a risk with an owner and a decision date. Leaving it as Must while it cannot be built misstates the plan.