Sub topic 5
Building a Screen Inventory
This chapter assumes you have read the earlier chapters on user flows and information architecture. You should be able to draw a flow as a sequence of steps and a site map as a tree of content groups. Here you turn those two artifacts into a list of screens you can plan, sketch, and estimate.
What a screen inventory is
A screen inventory is a table that lists every screen, and every meaningful variant of a screen, that the product needs. Each row names one screen and records why it exists, who sees it, and what it must contain.
The inventory sits between planning and sketching. The flow tells you what users do. The information architecture (IA) tells you where content lives. The inventory tells you what you must draw. Without it, designers tend to sketch the screens they find interesting and miss the ones that cause trouble later, such as "Password reset sent" or "Payment declined."
Where the rows come from
You derive rows from two sources and then check them against each other.
- Flows. Each step in a flow where the user sees something new needs a screen. A decision diamond usually produces at least two outcomes, and each outcome may need its own screen.
- IA. Each node in the site map that holds content needs a screen. Category nodes often become list or hub screens. Leaf nodes become detail screens.
Flows find the screens users pass through. The IA finds the screens users may visit on their own. A screen found only by the IA, such as "Account settings," is still real work even if no main flow touches it.
A worked example
Take the order-history example from this tutorial. The flow is "A customer checks the status of an order and contacts support if it is late." The IA has four top-level areas: Home, Orders, Support, and Account.
Walking the flow gives these candidate screens:
- Orders list
- Order detail
- Contact support form
- Support confirmation
Walking the IA adds:
- Home
- Support hub (help articles and contact options)
- Account settings
- Sign in
Now add the screens that neither source mentions but the product needs:
- Orders list with no orders (empty state)
- Orders list that failed to load (error state)
- Support form with validation errors
- Session expired, which sends the user back to sign in
Many teams skip this last group, and it is a common cause of schedule surprises. Chapter on screen states covers how to design these. Here the point is only to list them so they are counted.
Choosing the columns
A useful inventory is a table with a small, fixed set of columns. The following set works for most projects.
| Column | Purpose | Example |
|---|---|---|
| ID | Stable reference used in annotations and prototypes | ORD-02 |
| Name | Short, user-facing name | Order detail |
| Source | Flow step or IA node that requires it | Flow 1, step 3; IA 2.1 |
| Purpose | One sentence on what the user does here | Check status and see delivery estimate |
| Entry points | How the user arrives | Orders list, email link |
| Key content | Main data and actions | Status, items, Track button |
| Platforms | Where it exists | Web, iOS, Android |
| Priority | Release scope | Must, Should, Could |
| Status | Progress | Not started, Sketched, Reviewed |
Keep the ID stable. If you renumber screens after annotations and prototype links refer to them, every reference breaks. Use a prefix per area (ORD, SUP, ACC) and never reuse a retired number.
Deciding what counts as one screen
The hardest judgment in an inventory is granularity. Two questions help.
- Does the purpose change? If the user's goal changes, it is a separate screen. A list and a detail view have different goals.
- Does the layout change? If the same purpose needs a different arrangement of regions, record a variant. An order detail for a shipped order and one for a cancelled order may share a layout and differ only in content, so they are one screen with two states.
Treat these cases consistently:
- Modals, sheets, and drawers get their own rows if they contain a task, such as a filter sheet. A simple confirm dialog can be listed as a component of its parent screen.
- Tabs usually share one screen row when they swap content in one region. They get separate rows if each tab is a different destination with its own entry points.
- Responsive layouts are not separate rows. Record the breakpoints as a column or an annotation, and cover them in the layout work.
- Platform differences get separate rows only when the structure differs, for example a bottom tab bar on iOS and a navigation drawer on a web layout.
Common errors
- Listing only the happy path. The inventory then shows 12 screens and the real product needs 30. Review every flow for failure, cancel, and back-out branches.
- Mixing screens and components. A "Date picker" is a component. List it under the screens that use it, not as a screen.
- Duplicates under different names. "Order summary" and "Order detail" may be the same screen. Merge them and keep one ID.
- No priority. Without Must, Should, and Could, the team has no basis for cutting scope when time runs short.
- A stale inventory. If the list is not updated when the flow changes, it stops being trusted. Treat it as a living document and record changes in a version note.
Using the inventory
Once the table exists, it does four jobs.
- Coverage check. Walk every flow against the table. Each step should map to a row. Each row should map to at least one flow step or IA node. Rows with no source are either missing a flow or are unnecessary.
- Estimation. Counting rows by priority gives a rough sketching workload. Rows with several states or platforms cost more than simple ones.
- Sequencing. Sketch the Must screens on the main flow first, then branches, then settings and edge screens.
- Handoff. Developers use the same IDs to match designs to tickets.
A lightweight way to keep the inventory next to your wireframes is a plain CSV file under version control.
import csv
import io
INVENTORY = """id,name,source,priority,status
ORD-01,Orders list,Flow 1 step 1,Must,Sketched
ORD-02,Order detail,Flow 1 step 2,Must,Not started
SUP-01,Contact form,Flow 1 step 3,Must,Not started
SUP-02,Support confirmation,Flow 1 step 4,Should,Not started
ACC-01,Account settings,IA 4,Could,Not started
"""
rows = list(csv.DictReader(io.StringIO(INVENTORY)))
for priority in ("Must", "Should", "Could"):
names = [r["name"] for r in rows if r["priority"] == priority]
print(f"{priority}: {len(names)} screens - {', '.join(names)}")
todo = [r["id"] for r in rows if r["status"] == "Not started"]
print("Still to sketch:", ", ".join(todo))Running this prints a count of screens per priority and the IDs still to sketch. A short script like this is optional, but it shows that the inventory is structured data you can query, not just a document.
Exercises
Exercise
A flow for "Reset my password" has these steps: enter email, see "Check your inbox," open the email link, enter a new password, see "Password updated." List the screens, and name two extra screens the flow does not show but the inventory should include.
Show answer
The five steps give five screens: Enter email, Check your inbox, New password form, Password updated, and the email itself is outside the product, so the link opens the New password form. That leaves four product screens. Extra screens to add include "Link expired or invalid" (error branch), "Email not found" or a validation state on the first form, and "New password rejected" (for example too weak). Any two of these meet the requirement.
Exercise
Your inventory has "Order detail (shipped)" and "Order detail (cancelled)" as two rows with different IDs, and their layouts are identical except for the status text and one button. What should you do, and why?
Show answer
Merge them into one row, "Order detail," and record shipped and cancelled as states. The purpose and layout are the same, so they are variants of one screen. Separate rows inflate the count and risk the two drifting apart.