Sub topic 14
Revision History and Version Control
Assume you know basic garment vocabulary, the stages of apparel development, and how to read a spreadsheet. In a tech pack, version control is the method used to identify the current file, record changes, and prevent a factory from using outdated information.
A revision is a deliberate change to the pack. It might update a chest measurement, replace a button, move artwork, or clarify a seam finish. Version control connects that change to a date, a person, a sample, and an approval status.
Why revision control matters
A tech pack contains linked information. Changing the fabric can affect colorways, wash instructions, costing, and measurement behavior. Changing a pocket position can affect the technical flat, construction callout, point of measure, and artwork placement.
Without a clear revision system, two people may work from different instructions. A factory may sample an older measurement chart while the designer reviews a newer flat. The resulting sample can appear “wrong” even though both sides followed the files they received.
Use one clear style identifier and one revision identifier throughout the pack. For example:
- Style identifier: JKT-204
- Revision identifier: Rev 03
- File name: JKT-204Tech-PackRev03_2026-11-28.pdf
- Status: Approved for fit sample
The revision number should change whenever the factory receives a new instruction set. Do not change the number for a private working note that has not been issued.
The revision history table
Place the revision history near the cover sheet. Every row should describe one issued change. Record enough information for another person to understand what changed without comparing every page manually.
| Revision | Date | Author | Change summary | Affected sections | Status |
|---|---|---|---|---|---|
| Rev 01 | 2026-11-10 | Design team | Initial issue for development | All sections | For first sample |
| Rev 02 | 2026-11-19 | Design team | Increased sleeve length by 1 cm; changed button color | Spec table, BOM, colorways | For fit sample |
| Rev 03 | 2026-11-28 | Technical designer | Added topstitch detail and approved chest measurement | Flats, callouts, spec table | Approved for fit sample |
A useful change summary names the action and the location. “Updated details” is too vague. “Moved front pocket 2 cm toward side seam; updated flat and pocket point of measure” gives the factory a checkable instruction.
A controlled revision workflow
Use this sequence for each issued change:
- Collect fit comments, factory questions, or internal approvals.
- List every section affected by the proposed change.
- Update the source files and check cross-references.
- Increase the revision number.
- Add a row to the revision history.
- Export the complete pack as one file.
- Mark the previous issue as superseded.
- Send the new file with a short message stating the revision and required action.
Common control failures
- Editing a PDF without updating the source spreadsheet or drawing.
- Changing one page but sending a pack with mixed revision numbers.
- Reusing a file name such as
final_final2. - Omitting the effective date or approval status.
- Recording a change without naming the affected section.
- Keeping old files in a shared folder without marking them superseded.
Use a single archive location with read-only copies of issued revisions. Keep working files separate from factory-issued files. If a change affects production, state whether the factory should use it immediately or only for the next sample.
Exercise
The factory reports that its sample uses the old sleeve length, but the latest sleeve measurement appears in a spreadsheet. What should you check first?
Show answer
Check whether the updated spreadsheet was included in a newly numbered, complete tech pack revision and whether that revision was clearly issued to the factory. A private or untracked spreadsheet is not a controlled instruction.