Sub topic 15
Core 2 domain: Operational procedures
This chapter assumes you know the two-exam structure of A+ and the domain map of Core 2 (220-1202). It also assumes you can use a command line at a basic level. Operational procedures is the domain with the least hands-on configuration. It tests whether you work like a professional: documenting, following process, staying safe, and communicating well. Core 2 divides its weight roughly as follows: operating systems 28%, security 28%, software troubleshooting 23%, and operational procedures 21%. That makes this domain about a fifth of the exam, so it is worth studying.
What the domain covers
The objectives group into these topics:
- Documentation and support systems: ticketing, knowledge bases, asset management, and network diagrams.
- Change management.
- Backup and recovery.
- Safety and environmental controls.
- Licensing, privacy, and prohibited content.
- Communication and professionalism.
- Scripting basics.
- Remote access technologies.
- Basic concepts of using AI tools at work.
Questions in this domain are usually scenario-based. You are given a situation and asked for the best next action, so you need to recognize the correct process.
Documentation and support systems
Good records let another technician pick up your work. Know these types:
| Record | Purpose |
|---|---|
| Ticket | Tracks one request or incident: user, category, severity, description, actions taken, status |
| Knowledge base article | Reusable fix or how-to written after a problem is solved |
| Asset inventory | Lists hardware and software with tags, owners, warranty and lifecycle dates |
| Network diagram | Shows how devices and links connect |
| Acceptable use policy | States what users may and may not do with company systems |
A ticket should contain enough detail to reproduce your steps. Record what you tried, even when it failed, because that prevents the next person from repeating it.
Change management
A change is any planned modification to production systems. Change management reduces the chance that a change causes an outage. Expect these elements on the exam:
- Documented purpose and scope of the change.
- Risk analysis and a rollback plan.
- Approval by a change board (a change advisory board, or CAB).
- A scheduled window, often outside business hours.
- Testing, end-user acceptance, and updated documentation afterward.
An emergency change skips the normal wait but not the record. It is still documented, usually after the fact.
Backup and recovery
A backup is only useful if you can restore from it. Know the common backup types:
- Full: copies everything. It is the slowest to create and the fastest to restore.
- Incremental: copies changes since the last backup of any type. It is quick to create, and a restore needs the last full backup plus every incremental after it.
- Differential: copies changes since the last full backup. A restore needs the last full backup plus the latest differential.
- Synthetic full: assembles a full backup from earlier backups on the backup server.
The 3-2-1 rule means three copies of the data, on two different media types, with one copy off-site. Newer guidance adds an offline or immutable copy, which protects against ransomware. Also know the difference between a backup and a recovery test. A scheduled test restore is the only proof that your backups work.
Two other terms appear in questions. The recovery point objective (RPO) is how much data loss is acceptable, measured in time. The recovery time objective (RTO) is how long recovery may take.
Safety and environmental controls
Safety questions have a predictable pattern: pick the answer that protects people first, then equipment.
- Electrostatic discharge (ESD): wear an ESD strap connected to a grounded point, use an ESD mat, and keep components in antistatic bags.
- Electrical safety: power the device off and unplug it before opening it. Do not open a power supply. Capacitors can hold a charge.
- Lifting: bend your knees, keep the load close, and get help for heavy items.
- Fire: use a Class C extinguisher for electrical fires. Never use water on live equipment.
- Personal protective equipment (PPE): safety glasses, gloves, and a mask where dust or chemicals are present.
- Disposal: batteries, toner, and CRT or LCD parts are regulated waste. Follow local rules and recycle.
- Safety Data Sheet (SDS): documents a chemical's hazards, handling, and first aid. Look here for toner, cleaners, and batteries.
Environmental controls include temperature and humidity monitoring, proper ventilation, surge protectors, battery backup units (UPS), and keeping equipment away from dust.
Licensing, privacy, and prohibited content
You must know several license types: personal, enterprise, open source, and commercial. A digital rights management (DRM) system restricts copying. The end-user license agreement (EULA) states what the buyer may do. Using unlicensed software in a company exposes it to legal and security risk.
Regulated data includes personally identifiable information (PII), protected health information (PHI, under HIPAA), and payment card data (PCI DSS). Know the handling rules your employer sets for each.
If you find prohibited content, such as illegal material, on a system:
- Stop. Do not browse, copy, or delete it.
- Preserve the device as it is.
- Report it through the proper chain, usually your manager and security or legal staff.
- Document who handled the evidence and when (chain of custody).
Communication and professionalism
With a customer, you should:
- Listen without interrupting, and restate the problem to confirm it.
- Use clear, jargon-free language.
- Avoid judging the customer or minimizing the problem.
- Maintain confidentiality and avoid discussing a customer's data in public or on social media.
- Set and meet expectations: give a realistic timeline, offer options, and follow up afterward.
- Stay calm with an angry customer. Do not argue or become defensive.
Scripting basics
You need to recognize scripts, not write complex ones. Know the file extensions: .bat (batch), .ps1 (PowerShell), .vbs (VBScript), .sh (shell), .js (JavaScript), and .py (Python). Know the building blocks too: variables, loops, and conditionals.
#!/bin/bash
# Copy each .docx file from the Documents folder into a backup folder.
src="$HOME/Documents"
dest="$HOME/backup"
mkdir -p "$dest"
for file in "$src"/*.docx; do
if [ -f "$file" ]; then
cp "$file" "$dest/"
echo "Copied $(basename "$file")"
else
echo "No .docx files found"
fi
doneThe script sets two variables, loops over files, and uses an if test. If no .docx files exist, the pattern stays unexpanded, so the else branch runs.
Remote access technologies
| Technology | Typical use |
|---|---|
| Remote Desktop Protocol (RDP) | Graphical access to Windows over TCP port 3389 |
| SSH | Encrypted command-line access, TCP port 22 |
| VPN | Encrypted tunnel into a private network |
| Remote monitoring and management (RMM) | Managed service providers monitor and patch many endpoints |
| Remote assistance tools | Screen sharing with the user present |
Remote sessions need authentication, and the user's consent when you view their screen. Do not expose RDP directly to the internet. Put it behind a VPN or gateway.
Basic AI concepts
Core 2 also expects awareness of AI tools. Know that company policy governs what data may be entered into an AI system. Public tools may retain or learn from what is entered, while a private deployment keeps data inside the company. AI output can be wrong or biased, so a person must verify it before use.
Study tips for this domain
- Treat each topic as a process and memorize the order of steps.
- Practice the "best next step" pattern: safety, then documentation, then escalation.
- Read short scripts aloud, naming each variable, loop, and condition.
Exercise
A technician wants to install a driver update on a production server. Put these steps in the correct order: implement the change, get approval from the change board, test the result, write a rollback plan, update documentation.
Show answer
Write a rollback plan, get approval from the change board, implement the change, test the result, update documentation.
Exercise
A company runs a full backup every Sunday and an incremental backup every other night. The disk fails on Thursday morning. Which backups are needed to restore, and how would this differ with differential backups?
Show answer
With incrementals you need Sunday's full backup plus the Monday, Tuesday, and Wednesday incrementals. With differentials you need only Sunday's full backup plus Wednesday's differential.
Exercise
While repairing a laptop, you find what appears to be illegal material on it. What do you do?
Show answer
Stop looking at it, do not copy or delete anything, preserve the device, report it to your manager and security or legal staff, and document the chain of custody.