Sub topic 3
Leased lines: dedicated point-to-point circuits
This chapter assumes you can read basic router CLI, subnet IPv4 addresses (including /30 and /31 masks), and understand static and dynamic routing at a conceptual level. It follows the chapter on CE, PE, and the demarcation point, so those terms are used without redefinition.
What a leased line is
A leased line is a circuit that a service provider reserves for one customer. It connects two fixed locations, and the customer pays a flat monthly fee. No other customer's traffic shares the reserved capacity. The line is also called a point-to-point link, a serial line, or a private circuit.
The provider builds the circuit across its own transport network, which commonly uses TDM (time-division multiplexing) or Ethernet over fiber. The customer does not see that path. Each end of the circuit ends at the demarcation point, where a CE router connects to the provider's equipment.
Key properties:
- Dedicated bandwidth. A 10 Mbps leased line carries 10 Mbps in both directions at all times, whether or not it is busy.
- Predictable performance. Latency is nearly constant, and jitter and loss are very low because there is no contention with other customers.
- Layer 2 transparency. The provider delivers bits. The customer chooses what runs on top, such as HDLC or PPP framing and any Layer 3 protocol.
- Fixed cost. You pay for the capacity even when it sits idle.
Common speeds
Traditional leased lines come in fixed rates. In North America they follow the T-carrier hierarchy, and in much of the rest of the world the E-carrier hierarchy. Modern offerings are often delivered as Ethernet access at flexible rates, but the dedicated-circuit idea is the same.
| Circuit | Approximate rate | Typical region |
|---|---|---|
| DS0 | 64 kbps | Both (building block) |
| T1 | 1.544 Mbps | North America, Japan |
| E1 | 2.048 Mbps | Europe and most other regions |
| T3 | 44.7 Mbps | North America |
| E3 | 34.4 Mbps | Europe |
| Ethernet access | 10 Mbps to 10 Gbps or more | Both |
Configuring a leased-line interface
Because each leased line is a separate link between exactly two routers, each one is its own IP subnet. A /30 subnet gives two usable host addresses, which is exactly what two routers need.
interface Serial0/0/0
description Leased line to branch
ip address 192.0.2.1 255.255.255.252
encapsulation ppp
no shutdownReading this configuration:
ip address 192.0.2.1 255.255.255.252is a /30. The subnet is 192.0.2.0/30, the usable addresses are .1 and .2, and .3 is the broadcast address.encapsulation pppsets the Layer 2 framing. Both ends must use the same encapsulation. Encapsulation options are covered in the next chapter.no shutdownbrings the interface up. Cisco router interfaces are administratively down by default.
The branch router uses 192.0.2.2 on its end of the same subnet.
Where the hub-and-spoke cost problem appears
A leased line connects two points. To join many sites you must choose a topology, and each choice trades cost against resilience.
| Topology | Circuits for N sites | Strength | Weakness |
|---|---|---|---|
| Hub-and-spoke | N - 1 | Cheapest way to connect everything | Hub is a single point of failure, and spoke-to-spoke traffic goes through the hub |
| Full mesh | N(N - 1) / 2 | Direct paths and high resilience | Cost and configuration grow quickly |
| Partial mesh | Between the two | Balanced cost and resilience | Needs careful design |
For 10 sites, hub-and-spoke needs 9 circuits and a full mesh needs 45. For 50 sites, a full mesh needs 1,225 circuits. Each circuit also needs its own interface on a router and its own /30 subnet.
Why organizations used leased lines
Leased lines were the standard private WAN for decades. They suit cases where:
- Traffic is steady and heavy between two known sites, so the reserved capacity is well used.
- Latency-sensitive traffic such as voice or financial transactions needs consistent delay.
- Security policy prefers a circuit that does not cross the public internet.
- The customer wants full control of Layer 3 design, with no provider routing involved.
Because the provider delivers only a link, the customer runs its own routing across it. A common design uses OSPF or EIGRP inside the organization, and static routes at small branches.
Where the limits appear
The same properties that make leased lines predictable also create their limits.
- Cost scales with distance and speed. Pricing often depends on how far apart the sites are. A long-haul circuit between countries can cost far more than an internet connection of higher speed.
- Capacity is fixed and paid for always. If a branch uses 2 Mbps of a 10 Mbps line on average, you still pay for 10 Mbps. If it needs 12 Mbps at peak, traffic is dropped or delayed, and upgrading requires a new order.
- Slow provisioning. A new circuit can take weeks or months because the provider may need to build or reserve physical facilities.
- Poor mesh scaling. As the table above shows, full connectivity needs many circuits.
- No built-in cloud path. A leased line links your sites. Reaching SaaS or cloud services means backhauling traffic to a site with an internet connection, which adds latency.
- Single path per circuit. If the circuit or the access loop fails, the link is down until it is repaired. Resilience requires buying a second circuit, ideally over a different physical route.
Diagnosing a leased-line link
A serial link has two separate states. The physical and line-protocol states tell you which layer is failing.
Router# show interfaces Serial0/0/0
Serial0/0/0 is up, line protocol is up| Status | Meaning | Typical cause |
|---|---|---|
| Serial is down, line protocol is down | No signal at the physical layer | Cable or provider circuit failure, or no clocking |
| Serial is up, line protocol is down | Signal present but Layer 2 keepalives or negotiation fail | Encapsulation mismatch, or the far-end router is down or misconfigured |
| Serial is administratively down | Interface is shut down | Missing `no shutdown` |
| Serial is up, line protocol is up | Link works at Layers 1 and 2 | Look at Layer 3 if traffic still fails, such as mismatched subnets |
A common error is mismatched encapsulation. If one router uses PPP and the other uses HDLC, the physical link comes up but the line protocol stays down. A second common error is placing the two ends in different subnets, which leaves the link up but with no IP connectivity between the routers.
Leased lines in context
Leased lines remain in use for simple, high-value links, and they still serve as the access circuit that connects a site to a provider's network. The next chapters show how providers moved from one customer per circuit to shared infrastructure with MPLS, and how SD-WAN later reduced reliance on any single transport.
Exercise
A company has 8 sites and wants every site to have a direct leased line to every other site. How many circuits does it need? How many does hub-and-spoke need? Which design would you pick if the hub site loses power, and why?
Show answer
A full mesh needs N(N - 1) / 2 = 8 x 7 / 2 = 28 circuits. Hub-and-spoke needs N - 1 = 7 circuits. If the hub losing power must not isolate the other sites, the full mesh (or a partial mesh with a second hub) is better, because spoke sites can still reach each other directly. The price is 21 more circuits, each with its own interface and /30 subnet. A partial mesh with a backup hub is a common compromise.
Exercise
After a provider reports a circuit as delivered, a router shows "Serial0/0/0 is up, line protocol is down". The local router uses PPP. What are the two most likely causes, and what do you check first?
Show answer
The signal is present, so Layer 1 is working. The most likely causes are an encapsulation mismatch (the far end uses HDLC or another type) and a far-end router that is down or misconfigured. Check the encapsulation on both ends first with show interfaces or show running-config, and set both to the same type. If they match, ask the far-end site to verify its interface is not shut down and has an address in the same /30.