Sub topic 12
Combining the Matrix with Other Prioritization Methods
This chapter assumes you can already classify a task into one of the four quadrants, and that you have run at least one weekly review with the matrix. You should also know its main weakness: it sorts tasks into groups but does not rank the tasks inside a group. Here you will learn which other methods fill that gap, how to chain them with the matrix, and which combinations cause trouble.
What the matrix does and does not do
The Eisenhower matrix answers one question: what kind of attention does this task need? It gives four answers: do now, schedule, delegate or limit, and eliminate. That is a sorting step.
It leaves several questions open:
- Which of your ten Quadrant 2 tasks comes first?
- How long will each task take, and does it fit in the time you have?
- Which tasks depend on other tasks?
- Is the task big enough that it needs to be broken into smaller steps?
- How do you compare tasks when "important" means different things to different stakeholders?
Other methods answer these questions. The matrix works well as the first filter, and the methods below work well as the second.
A pipeline view
Think of prioritization as a pipeline with stages. Each stage uses the tool that fits its question.
Quadrant 1 tasks skip the ranking stage because they cannot wait. Quadrant 2 tasks are the ones that benefit most from extra structure, because nothing forces you to start them.
Combining with impact and effort scoring
Impact and effort scoring rates each task on two scales. Impact is how much the task moves a goal. Effort is how much time or energy it costs. A common shortcut is to divide impact by effort and work down the list.
This pairs well with Quadrant 2. Those tasks are all important, but they differ in payoff per hour. A task with high impact and low effort is a quick win. A task with high impact and high effort is a project that needs planning.
The following script sorts Quadrant 2 tasks by an impact-to-effort ratio. It uses scores from 1 to 5 that you assign yourself.
tasks = [
{"name": "Write onboarding guide", "impact": 4, "effort": 2},
{"name": "Redesign reporting pipeline", "impact": 5, "effort": 5},
{"name": "Book dentist appointment", "impact": 2, "effort": 1},
{"name": "Draft next quarter's goals", "impact": 5, "effort": 3},
]
def score(task):
return task["impact"] / task["effort"]
for task in sorted(tasks, key=score, reverse=True):
print(f"{score(task):.2f} {task['name']}")The output lists the dentist appointment first (2.00), then the onboarding guide (2.00), the goals draft (1.67) and the pipeline redesign (1.00). Notice what the ratio does: it favors small tasks. The redesign has the highest impact but ranks last. This is the main gotcha of ratio scoring, and the table later in this chapter returns to it.
Combining with time blocking
Time blocking means putting a task on the calendar as an appointment, with a start and an end. It solves the problem that Quadrant 2 creates. A Quadrant 2 task has no deadline, so it loses every contest with a Quadrant 1 or Quadrant 3 task unless you reserve time for it.
The workflow is:
- Run the matrix and pick the Quadrant 2 tasks for this week.
- Rank them with a scoring method if there are more than your week can hold.
- Estimate each task's duration, then add a buffer of about 25 percent.
- Place each task in a block on your calendar, ideally during your best working hours.
- Leave open space for Quadrant 1 events, because they will happen.
The buffer in step 3 is not optional. People usually underestimate how long tasks take, and a calendar packed with exact estimates fails on the first interruption.
Combining with MoSCoW
MoSCoW sorts items into Must have, Should have, Could have, and Won't have (this time). It is common in project and product work, where the question is what goes into a release or a sprint.
The two methods overlap, but they are not the same:
- The matrix looks at time pressure and importance for a person.
- MoSCoW looks at necessity for a fixed deliverable.
A practical combination is to use MoSCoW to define the scope of a project, then use the matrix each week to decide which of the project's tasks you work on. Must-have items with near deadlines land in Quadrant 1. Must-have items with distant deadlines land in Quadrant 2. Won't-have items land in Quadrant 4 for this project.
Combining with the ABCDE method and numbered priorities
Brian Tracy's ABCDE method assigns letters to tasks: A for must do, B for should do, C for nice to do, D for delegate, and E for eliminate. It resembles the matrix, with D and E matching Quadrants 3 and 4. Its value is the ranking inside a letter: you label the A tasks A1, A2, A3 and do them in that order.
You can borrow that idea directly. After sorting with the matrix, number the tasks inside each quadrant. This costs almost nothing and removes the ranking gap without a second framework.
Combining with the Ivy Lee method and a daily cap
The Ivy Lee method has you write down the six most important tasks for tomorrow, rank them, and work through them in order, starting a new one only when the previous one is done. Unfinished tasks move to the next day's list.
This works as a daily layer on top of the weekly matrix:
- Weekly: run the matrix and choose the Quadrant 2 tasks you commit to.
- Daily: pick up to six tasks from Quadrant 1 and your committed Quadrant 2 list, and rank them.
The cap matters. A long list hides trade-offs, while a short one forces them.
Combining with deadlines and dependencies
Some tasks block other tasks. If your colleague cannot start until you send a file, that file matters more than its own score suggests. Neither the matrix nor a ratio score captures this.
Handle dependencies with a simple rule. Before you finalize the day, check each task and ask who or what is waiting on it. If a task blocks others, move it up within its quadrant. For larger projects, a dependency list or a critical path view makes this explicit.
The next script shows the idea. It sorts first by quadrant, then moves blocking tasks ahead of non-blocking tasks in the same quadrant, then by impact.
tasks = [
{"name": "Send data file to analyst", "q": 2, "blocks": 1, "impact": 3},
{"name": "Plan next quarter's goals", "q": 2, "blocks": 0, "impact": 5},
{"name": "Fix production outage", "q": 1, "blocks": 3, "impact": 5},
{"name": "Review team's draft", "q": 2, "blocks": 2, "impact": 2},
]
def order(task):
return (task["q"], -task["blocks"], -task["impact"])
for task in sorted(tasks, key=order):
print(f"Q{task['q']} blocks={task['blocks']} {task['name']}")The sort key is a tuple. Python compares the first element, and uses the next one only when the first values tie. Negative numbers make larger values sort first.
Choosing a method
The table summarizes what each method adds and where it can mislead you.
| Method | Question it answers | Best used for | Main risk |
|---|---|---|---|
| Impact and effort ratio | Which task pays off most per hour? | Ranking Quadrant 2 tasks | Favors small tasks over large, valuable ones |
| Time blocking | When will I do it? | Protecting Quadrant 2 work | Over-packed calendars that break on day one |
| MoSCoW | What is necessary for this deliverable? | Project scope | Everything gets labeled "Must" |
| ABCDE | In what order within a category? | Fast personal ranking | Too many A tasks |
| Ivy Lee | What are today's top six? | Daily focus | Rigid when the day is unpredictable |
| Dependency check | What is blocking others? | Team and project work | Hard to see without a shared view |
Common errors when combining methods
- Stacking too many systems. Using the matrix, MoSCoW, scoring and Ivy Lee together costs more time than it saves. Pick one sorting method and one ranking method, and add a third only when you can name the specific problem it solves.
- Scoring before sorting. If you score every task first, you may spend time rating Quadrant 4 tasks that you should have dropped. Sort first.
- Letting scores override judgment. A score is an input. If the ranking looks wrong, ask what the score is missing, such as a dependency or a risk, and adjust.
- Skipping the review. Every combination still depends on the weekly review. If the review slips, the quadrants go stale, and the methods built on them go stale too.
- Using group tools on personal tasks. MoSCoW and dependency lists suit shared work. For a personal list they add overhead without payoff.
A worked combined routine
Here is one way to join the methods in about thirty minutes per week.
- Collect. Write down every open task.
- Sort. Assign each task a quadrant with the two test questions. Drop Quadrant 4, and delegate or batch Quadrant 3.
- Rank. Score the Quadrant 2 tasks for impact and effort, then adjust for dependencies.
- Commit. Choose only as many Quadrant 2 tasks as your calendar can hold after Quadrant 1 allowances.
- Block. Place those tasks on the calendar with buffers.
- Daily. Each evening, pick the top six for tomorrow from the committed list and any Quadrant 1 items.
You can test whether the routine works with one measure: at the end of the week, how many hours went to Quadrant 2 work compared with your plan? If the gap is large, the cause is usually step 4 or 5, where you committed to more than the calendar can hold.
Exercise
You have five Quadrant 2 tasks. One has impact 5 and effort 5, and the other four have impact 2 and effort 1. You rank by impact divided by effort. Which task comes last, and what is the risk? What two changes could you make so the high-impact task still gets done?
Show answer
The impact 5, effort 5 task has a ratio of 1.0, while the others score 2.0, so it ranks last. The risk is that ratio scoring keeps pushing the biggest, most valuable task behind small tasks every week, so it never gets started. Two fixes: break the large task into smaller steps and score each step, or give it a fixed recurring time block that is not subject to the ratio ranking.
Exercise
A teammate is waiting on a file from you, and the task is in Quadrant 2 with a low impact score. Where should it go in your ordering, and which method from this chapter tells you that?
Show answer
Move it up within its quadrant, ahead of Quadrant 2 tasks that block nobody. The dependency check tells you this: a task that blocks other people matters more than its own score suggests, so you raise it in the ordering and, if the wait causes a deadline, it may become Quadrant 1.