Sub topic 4
Scope and prioritize the update
This chapter turns an audit and a change classification into a bounded plan of work. It assumes you have an audit list of lectures with reasons for each (as in the earlier chapters), and that you have classified the changes as minor, moderate, or major. It also assumes you can record and edit video and audio, and that you know how your platform organizes lectures, quizzes, and downloads.
What scoping produces
Scoping decides what you will change in this release, what you will leave alone, and what you will defer. The output is a short written plan with four parts:
- A list of work items, each tied to a lecture ID from your audit.
- The assets each item drags along (quiz, slides, downloads, other lectures).
- An effort estimate for each item.
- A budget: the recording and editing time you will actually spend.
Without a plan like this, updates grow. One fix leads to "while I'm in there" changes, and soon you are rebuilding a course that only needed three new lectures. Students pay for that growth. A release that takes four months leaves a known error live for four months.
Define a work item
A work item is the smallest unit you can finish and publish on its own. For most courses that is one lecture plus everything that must change with it. Using the lecture alone as the unit hides the real cost.
Take lecture L-021, "Joins explained". The example uses a renamed table. Fixing it means:
- Re-recording the lecture, or only the segment that shows the table.
- Updating the quiz questions that name the old table.
- Updating the slide that shows the schema.
- Replacing the downloadable sample database, if it contains the old name.
- Checking later lectures that reuse the same table.
Item 5 is the one people miss. A dependency is any other asset that quotes, shows, or builds on the thing you are changing. List dependencies when you create the item, not after you have recorded. Later chapters cover how to re-record and how to update supporting materials. Here you only need to know they exist and what they cost.
Use a search before you estimate. Search your transcripts, slide text, and download file names for the old term, such as the old table name or the old menu label. Each hit is either a dependency or a confirmation that the item is isolated.
Decide what is in scope
Apply these tests, in order, to every candidate item from the audit.
| Test | Question | If yes |
|---|---|---|
| Blocks | Can a student not finish the lesson or exercise as taught? | Include. Do this first. |
| Wrong | Does the lesson teach something false or unsafe? | Include. |
| Dated | Is it correct but visibly old (older interface, old version number)? | Include if budget allows. |
| Cosmetic | Is it a style issue (a pause, a slightly off font)? | Defer, or batch with a larger item. |
"Blocks" and "wrong" are about correctness and are not negotiable. "Dated" and "cosmetic" are about polish and compete for the budget. If you classified the whole change as major because it alters learning outcomes, stop here. Scoping a patch is the wrong tool, and the final chapters of this tutorial cover the new-edition decision.
Prioritize with reach and effort
Severity alone does not order the middle of the list. Two more numbers help.
- Reach is the share of students who actually get to a lecture. A lecture in section 1 reaches nearly everyone. A lecture in the last section might reach 30%. Your platform's completion or progress report usually gives this.
- Effort is the total minutes to finish the item, including dependencies and QA, not just recording time.
A simple priority score is severity times reach, divided by effort in hours. It rewards fixes that help many students cheaply. The script below applies it. Items that block students are always included first, regardless of score, because a score should not be able to push a broken lesson out of the release.
from dataclasses import dataclass
SEVERITY = {"blocks": 4, "wrong": 3, "dated": 2, "cosmetic": 1}
@dataclass
class Item:
id: str
severity: str # one of the SEVERITY keys
reach: float # share of students who reach this lecture, 0..1
effort_min: int # total minutes, including quiz, slides, downloads, QA
def priority(item):
if item.effort_min <= 0:
raise ValueError("effort_min must be positive")
return SEVERITY[item.severity] * item.reach / (item.effort_min / 60)
def build_plan(items, budget_min):
must = [i for i in items if i.severity == "blocks"]
rest = sorted(
(i for i in items if i.severity != "blocks"),
key=priority,
reverse=True,
)
plan = list(must)
used = sum(i.effort_min for i in must)
deferred = []
for item in rest:
if used + item.effort_min <= budget_min:
plan.append(item)
used += item.effort_min
else:
deferred.append(item)
return plan, deferred, used
items = [
Item("L-014", "blocks", 0.95, 90),
Item("L-021", "wrong", 0.60, 120),
Item("L-033", "dated", 0.30, 150),
Item("L-040", "cosmetic", 0.20, 60),
]
plan, deferred, used = build_plan(items, budget_min=300)
print("Plan:", [i.id for i in plan])
print("Deferred:", [i.id for i in deferred])
print("Minutes used:", used)This prints:
Plan: ['L-014', 'L-021', 'L-040']
Deferred: ['L-033']
Minutes used: 270Note what the greedy fill did. L-033 scores higher than nothing but does not fit after L-021, so it is deferred, and the smaller L-040 takes the leftover time. That is acceptable here. If you would rather leave the slack unused than fix a cosmetic issue, drop cosmetic items from the candidate list before you run the script.
The weights are judgment, not science. Treat the score as a way to start a conversation with yourself, then override it when you have a reason, and write the reason down.
Triage flow
The diagram shows the order of decisions for each candidate item.
Batch to cut cost
Recording has a setup cost. You need the same microphone position, screen resolution, and software state each time. Group items so that one setup serves several.
- Group by environment. If three lectures use the new installer screens, record them in one session with one clean machine.
- Group by section. Adjacent lectures share context, and a batch lets you fix transitions between them.
- Pull cosmetic items into sessions you are already running, where the extra cost is minutes rather than a new setup.
Batching is why a "deferred" item can still be done early. It moves from the backlog to the plan the moment it shares a session with included work.
Edge cases
- The software changes again mid-project. If the tool you teach ships another release while you are recording, you can chase it forever. Pick a freeze point: a named version you will record against. Anything newer goes in the backlog for the next release.
- Early lectures carry more risk. A small edit in section 1 reaches almost everyone, so its reach is high even when its severity is low. Early items are also the first impression for new buyers. Weigh this when you score.
- Hidden coupling. A lecture may be correct but contradict a fixed neighbor, for example by showing the old menu while the next lecture uses the new one. Add the neighbor as a dependency, or the course will be inconsistent after the release.
- Reach looks tiny but the lesson is required. A final-project lecture may have low reach because few students finish. If completion or a certificate depends on it, treat it as higher severity than its reach suggests.
- Estimates run over. Re-recording usually takes more than the video length. Plan for retakes, editing, captions, and re-upload. A common rule is to multiply the finished minutes by a factor you measure from your own past work, and to use that factor consistently.
- Scope creep from feedback. Student comments will suggest new topics. Those are new content, not an update to broken content. Log them in the backlog and keep them out of this release.
Write the plan down
Keep the plan next to your audit manifest. For each included item, record the ID, the reason, the dependencies, the effort, and the target session. For each deferred item, record why it was deferred and what would bring it back. A deferred item with a stated trigger, such as "revisit when the tool's next version ships", is a decision. An item with no note is just something you forgot.
Before you move on, check three things. Every included item has its dependencies listed. The total effort fits your budget with a margin for retakes. Everything outside the plan is in the backlog, not in your head.
Exercise
Your audit lists four items. L-005 has the wrong command in a section 1 lecture that nearly all students watch (severity "wrong", reach 0.95, effort 60 minutes). L-050 has a stale logo in the last section (severity "cosmetic", reach 0.15, effort 45 minutes). L-012 cannot be completed because a downloadable file is missing (severity "blocks", reach 0.8, effort 30 minutes). L-030 shows an older interface (severity "dated", reach 0.5, effort 90 minutes). Your budget is 150 minutes. Using the rules in this chapter, which items go in the plan, in what order, and which are deferred?
Show answer
L-012 goes first because it blocks students, using 30 minutes. Of the remaining items, L-005 scores 3 × 0.95 / 1 = 2.85, L-030 scores 2 × 0.5 / 1.5 ≈ 0.67, and L-050 scores 1 × 0.15 / 0.75 = 0.2. L-005 is next (60 minutes, total 90). L-030 needs 90 minutes, and 90 + 90 = 180 exceeds the 150 budget, so it is deferred. L-050 fits (45 minutes, total 135), so it goes in the plan. The plan is L-012, L-005, L-050, with 135 minutes used. L-030 is deferred, with a note to revisit it in the next release. If you would prefer to leave L-050 out and keep the slack as retake time, that is a reasonable override as long as you record the reason.