Sub topic 9
Using Constraints and Scope to Focus the Concept
This chapter assumes you have already chosen a player fantasy, written design pillars, listed player verbs, and sketched a core loop. It also assumes you know the audience and platform for the concept. If you have not done those steps, the limits in this chapter will have nothing to attach to. Here you turn a promising loop into a concept a small team could finish.
Why limits help a concept
A concept with no limits is not flexible. It is unfinished. "A lighthouse game about isolation" can become a five-minute browser toy or a ten-year open-world simulation. Until you say which, no one can judge the idea, estimate it, or decide what to cut.
Constraints are the facts you cannot change, or choose not to. Scope is the amount of game you commit to inside those facts. Constraints come first, and scope is what you decide in response to them.
Limits help in three ways:
- They reduce the number of options. Every feature idea must now pass a test.
- They make the idea comparable. Two concepts with the same budget can be judged on quality, not on ambition.
- They push you toward depth. With fewer things in the game, each one has to do more work.
Kinds of constraints
Sort constraints by where they come from. Each source behaves differently when you try to bend it.
| Source | Example | Can you change it? |
|---|---|---|
| Platform | Desktop browser, mouse and keyboard only | Rarely. It was set by the audience decision. |
| Audience | Sessions under 15 minutes, no tutorial text wall | Only by choosing a different audience. |
| Team | One designer, one artist, 30 working days | Sometimes, but only with outside resources. |
| Technical | No server, runs offline, loads in under 3 seconds | Costly to change late. |
| Content | Five nights, ten ship types | Fully yours. This is where you set scope. |
| Design (self-imposed) | One resource, no combat, no text input | Yours, and you can revise it after playtests. |
Platform, audience, team, and technical constraints are given. You discover them. Content and design constraints are chosen. You set them to fit the given ones. A common error is treating a chosen limit as if it were given, which makes you defend a number you picked arbitrarily. The reverse error is treating a given limit as negotiable, which produces a plan that fails on day one.
Design constraints as creative tools
A self-imposed limit can sharpen a concept. "The player has one resource" forces every decision through that resource, which is what Last Light needs for scarcity to feel real. Examples that work well:
- Limit verbs. Four verbs (light, dim, signal, ration) can be learned in one session.
- Limit information. Showing ships only as lights in the dark supports isolation and removes the need for detailed ship art.
- Limit time. A night that lasts two minutes keeps tension high and testing cheap.
The test for a good design constraint is whether it supports a pillar. If it only saves work and weakens an experience goal, it is a cut, not a constraint (see the cut test below).
Scope: content, systems, and polish
Scope has three parts, and each grows differently.
- Content is the amount of stuff: levels, ship types, events, art assets, lines of text. It grows in a straight line. Doubling the ship types roughly doubles the work for those items.
- Systems are the rules that interact: the oil system, the ship behavior, the weather. They grow faster than linearly, because each new system must work with every existing one. Three systems have three pairs of interactions to test. Six systems have fifteen.
- Polish is the work that makes a game feel finished: sound, feedback, menus, tutorial, bug fixing. It is the part most often left out of estimates, and it often takes as long as the first build.
Because systems grow fastest, the usual rule is to cap systems tightly and let content carry the variety. The concept line in the Last Light brief does this: one keeper, five nights, no more than ten ship types. That is one system (oil spent on the lamp) with a bounded amount of content.
Scope hides in "small" features
Some features look cheap and are not. Watch for these:
- Save and load. It touches every system, because each one must be serializable.
- Procedural generation. It replaces authoring work with balancing and testing work, which is often harder.
- Multiple endings. Each ending needs content, and each branch must be reachable and tested.
- Localization or accessibility options. These are worth doing, but add them to the plan on purpose rather than discovering them late.
Turning a limit into a number
A limit you cannot count cannot be enforced. Write scope as numbers in the concept brief, next to the pillars. This is the scope line from the Last Light brief:
scope: One keeper, five nights, no more than ten ship typesThat is one line, but it holds three testable limits. You can count characters, nights, and ship types, so a reviewer can say "this plan has eleven ship types" and the problem is plain.
Next, convert the limits to time. The script below checks a feature list against a work budget. It reserves part of the budget for polish and bug fixing, protects work that serves a pillar, and fills the remaining room with optional features.
from dataclasses import dataclass
@dataclass
class Item:
name: str
days: int
serves_pillar: bool
BUDGET_DAYS = 30
RESERVE_DAYS = 6 # polish, bug fixing, surprises
items = [
Item("Lamp and oil system", 4, True),
Item("Ship arrival and outcomes", 5, True),
Item("Five-night structure", 3, True),
Item("Ten ship types (art and text)", 8, True),
Item("Weather system", 6, False),
Item("Save and load profiles", 3, False),
Item("Keeper backstory cutscenes", 7, False),
]
usable = BUDGET_DAYS - RESERVE_DAYS
core = [i for i in items if i.serves_pillar]
optional = [i for i in items if not i.serves_pillar]
spent = sum(i.days for i in core)
if spent > usable:
raise SystemExit("Core exceeds budget: shrink the concept, not the reserve.")
kept, cut = [], []
for item in sorted(optional, key=lambda i: i.days):
if spent + item.days <= usable:
kept.append(item.name)
spent += item.days
else:
cut.append(item.name)
print(f"Spent {spent} of {usable} usable days")
print("Kept optional:", kept)
print("Cut:", cut)Running it prints:
Spent 23 of 24 usable days
Kept optional: ['Save and load profiles']
Cut: ['Weather system', 'Keeper backstory cutscenes']Three points about this script:
- The check on the core list is the important line. If pillar work alone exceeds the usable days, the answer is a smaller concept, not a smaller reserve.
- Filling optional work cheapest-first is a greedy shortcut, not a judgment of value. In a real plan you would rank optional items by how much they support the pillars, then fit them in that order.
- The day counts are guesses. Treat them as a way to compare options, not as promises. Small teams commonly underestimate by a factor of two, so the reserve matters.
The cut test
When a feature competes for room, ask three questions in order:
- Does it serve a pillar? "Every decision has a visible human cost" supports ship outcome scenes. It does not obviously support a weather system.
- Is it needed for the core loop to work? Observe, spend, see results, restock. If removing the feature breaks the loop, it is core.
- Can a cheaper version deliver most of the effect? Weather could become a single line of text on each night card that changes how many ships appear.
A feature that fails the first two questions is cut. A feature that passes the first but fails the second is a candidate for a cheaper version.
Keep a cut list
Do not delete cut ideas. Move them to a "not now" list in the concept notes. This does two things. It lets designers let go of an idea without feeling it is lost, and it gives you a place to look if a playtest shows the loop needs something extra.
Constraints that conflict
Sometimes two limits cannot both be met. Suppose the audience wants sessions under 15 minutes, but a five-night structure at four minutes per night is 20 minutes. You have three honest options:
- Shorten the nights.
- Reduce the nights, for example to three, and change the scope line.
- Let sessions span multiple sittings and save progress, which adds the save feature you may have just cut.
Pick the option that protects the player fantasy, and record why. The note matters later, when someone proposes to undo the decision.
Common errors
- Scope by wish. Writing "as many ship types as possible" is not a limit. Use a number.
- Cutting the core. Cutting the part that makes the game distinctive, because it is hard, leaves a generic game. Cut around the core instead.
- No reserve. A plan whose budget is fully allocated has no room for illness, bugs, or one failed prototype.
- Constraints set too tight. A scope so small that the loop cannot repeat enough times to create tension is a failure too. If a playtest shows the player has seen everything in one night, the content limit is too low.
- Limits chosen after the build starts. Limits chosen late are made by the deadline, not by the designer.
Connecting to the next steps
The scope line goes into the concept document next to the pillars and the core loop. It also tells you how big a paper or minimal prototype should be. A prototype of the Last Light loop needs one oil counter, a handful of ship cards, and perhaps three nights, because that is enough to test whether scarcity creates tension.
Exercise
A team of two has 20 working days. Their concept has pillar-serving work of 11 days (loop, outcomes, six content items) and optional features: tutorial overlay (4 days), achievements (2 days), and a daily-challenge mode (5 days). They keep a 5-day reserve. Which optional features fit, and what do you do if the pillar work grows to 16 days?
Show answer
Usable days are 20 - 5 = 15. Core work takes 11, leaving 4 days. The tutorial overlay (4 days) fits alone, or achievements (2 days) fits with 2 days to spare, but not both (6 days). Choosing between them depends on the pillars and audience: a tutorial supports a short-session audience, so it likely wins. The daily-challenge mode (5 days) does not fit. If pillar work grows to 16 days, it exceeds the 15 usable days, so no optional feature fits and the concept itself must shrink, for example by cutting content items, rather than using the reserve.
Exercise
Your concept has a pillar "Short, tense nights." A teammate proposes a crafting system for making new lamp oil. Apply the cut test and give a decision.
Show answer
Pillar check: crafting adds a long, calm activity that works against "short, tense nights", so it does not serve the pillar and likely fails question one. Core loop check: the loop already restocks oil, so crafting is not needed. Cheaper version check: a random restock amount each night already provides the effect. Decision: cut it and add it to the "not now" list, with a note that it should be revisited only if playtests show restocking feels too passive.