Sub topic 10
Picking today's shortlist
This chapter assumes you have already put every open task into one inventory and sorted each into a triage bucket: do now, schedule, delegate or shrink, or drop or defer. It also assumes you have estimated how many focused minutes you can work in a day. Here you combine those results into a short list for today.
Why a shortlist, not the whole bucket
The do-now and schedule buckets can still hold more work than one day allows. If you start the day from those buckets, you face the same overflow you just triaged. A daily shortlist is a small, fixed selection that fits your capacity. It is the only list you work from today.
Only two buckets feed the shortlist. Tasks in "delegate or shrink" and "drop or defer" stay out until a review moves them.
The selection rule
The rule has three steps:
- Keep only candidates from "do now" and "schedule".
- Order them by earliest due date. Tasks with no due date go last.
- Walk down the list and add each task that still fits in the remaining minutes.
The code below implements this. It includes the bucket function from the previous chapter so the script runs on its own.
from dataclasses import dataclass
from datetime import date
from typing import Optional
@dataclass
class Task:
name: str
due: Optional[date]
important: bool
minutes: int
def bucket(task: Task, today: date) -> str:
urgent = task.due is not None and (task.due - today).days <= 2
if urgent and task.important:
return "do now"
if task.important:
return "schedule"
if urgent:
return "delegate or shrink"
return "drop or defer"
def shortlist(tasks, today, capacity_minutes):
candidates = [t for t in tasks if bucket(t, today) in ("do now", "schedule")]
candidates.sort(key=lambda t: (t.due is None, t.due or date.max))
chosen, used = [], 0
for t in candidates:
if used + t.minutes <= capacity_minutes:
chosen.append(t)
used += t.minutes
return chosen
today = date(2026, 11, 27)
tasks = [
Task("Send tax form", date(2026, 11, 28), True, 30),
Task("Draft report", date(2026, 11, 29), True, 180),
Task("Prepare client slides", date(2026, 12, 1), True, 120),
Task("Reply to vendor", date(2026, 11, 27), False, 15),
Task("Reorganize photos", None, False, 90),
Task("Book dentist", None, True, 10),
]
picked = shortlist(tasks, today, capacity_minutes=240)
for t in picked:
print(f"{t.name} ({t.minutes} min)")
print("Total:", sum(t.minutes for t in picked), "of 240 min")Running it prints:
Send tax form (30 min)
Draft report (180 min)
Book dentist (10 min)
Total: 220 of 240 minReading the result
Four things are worth noticing in this output:
- "Reply to vendor" is urgent but not important, so it is in "delegate or shrink" and never becomes a candidate. You handle it by asking someone else or by sending a one-line answer.
- "Reorganize photos" is in "drop or defer" and is ignored.
- "Prepare client slides" is a valid candidate. It is skipped because 120 minutes no longer fit after the first two tasks (210 minutes used, 30 left).
- The loop continues after a skip, so the 10-minute "Book dentist" still fits.
The skipped slides are not lost. They stay in "schedule" and are due in four days, so they are likely to be chosen tomorrow.
Practical adjustments
Set capacity_minutes below your real working time. Meetings, interruptions and tasks that run long all consume minutes the list does not show. Many people plan for 60 to 70 percent of their available hours. Use your own numbers from the capacity chapter.
If the shortlist is empty, check the capacity value and the minute estimates. A single task larger than your whole capacity can never be chosen, so split it into steps that each fit in a day.
Choose the shortlist once, at the start of the day or the evening before. Do not rebuild it after every interruption. Re-sorting repeatedly is one of the common pitfalls covered later, and it uses up the time you were trying to protect.
Exercise
Using the example tasks and a capacity of 200 minutes, which tasks does shortlist return, and why?
Show answer
It returns "Send tax form" (30 min) and "Book dentist" (10 min). The candidates in due-date order are tax form (30), draft report (180), slides (120) and dentist (10). The tax form fits, leaving 170 minutes. The 180-minute report no longer fits and is skipped. The slides (120) fit in the remaining 170 minutes, so they are added, leaving 50. The dentist task (10) also fits. So the result is the tax form, the slides and the dentist booking, totalling 160 minutes.
Exercise
A task is important, has no due date, and takes 45 minutes. Which bucket does it land in, and where does it appear in the sort order?
Show answer
It lands in "schedule", because it is important but not urgent. It sorts after every task that has a due date, because the sort key puts tasks with no due date last.