Work Problems with Combined Rates
Assume you can work with fractions and solve a linear equation. In a work problem, the key idea is to describe each worker by a rate: the fraction of the job completed per unit of time.
If a worker completes a job in \(h\) hours, that worker's rate is:
\[ \text{rate}=\frac{1}{h}\text{ job per hour} \]
When workers work together, their rates add. The combined rate is then multiplied by the time they work.
Build the rate equation
Use this template:
\[ (\text{rate}1+\text{rate}2+\cdots)(\text{time})=\text{total work} \]
For one complete job, the total work is 1. For half a job, it is \(1/2\).
Example: two workers together
Pipe A fills a tank in 6 hours. Pipe B fills the same tank in 12 hours. How long do they take together?
Their rates are:
| Worker | Time for one job | Rate |
|---|---|---|
| Pipe A | 6 hours | \(1/6\) tank per hour |
| Pipe B | 12 hours | \(1/12\) tank per hour |
Let \(t\) be the number of hours they work together.
\[ \left(\frac{1}{6}+\frac{1}{12}\right)t=1 \]
Use a common denominator:
\[ \left(\frac{2}{12}+\frac{1}{12}\right)t=1 \]
\[ \frac{3}{12}t=1 \]
\[ \frac{1}{4}t=1 \]
Thus, \(t=4\) hours.
Check the result: in 4 hours, Pipe A fills \(4/6=2/3\) of the tank, and Pipe B fills \(4/12=1/3\). Together they fill \(2/3+1/3=1\) tank.
Handle partial work
Some problems ask how much work remains after one worker has worked alone. Calculate the completed portion first, then subtract from 1.
For example, a machine completes a job in 5 hours. After working alone for 2 hours, it has completed:
\[ 2\left(\frac{1}{5}\right)=\frac{2}{5} \]
The remaining work is:
\[ 1-\frac{2}{5}=\frac{3}{5} \]
If a second machine then joins, multiply their combined rate by the time needed to complete \(3/5\) of the job:
\[ (\text{combined rate})(t)=\frac{3}{5} \]
>callout note > Do not add completion times. Add rates. A worker who takes 6 hours contributes \(1/6\) of the job per hour, not 6 jobs per hour.
Common errors
- Using \(6+12\) instead of \(1/6+1/12\).
- Treating the answer as the time for one worker rather than the shared time.
- Forgetting that a partial job has a total work value less than 1.
- Mixing units, such as one rate per hour and another rate per minute.
- Failing to check whether the combined time is less than either individual time. Working together should not take longer than the slower worker working alone.
Exercise
Worker A completes a job in 8 hours, and Worker B completes it in 12 hours. How long will they take together?
Show answer
Their combined rate is \(1/8+1/12=5/24\) job per hour. Therefore, \((5/24)t=1\), so \(t=24/5=4.8\) hours, or 4 hours 48 minutes.