Sub topic 7
Calculating Follow-Up Dates with Formulas
This chapter assumes you already have the tracker columns from the earlier chapters: Status in column D, Date applied in E, Last activity in F, and Next follow-up in H. It also assumes you can enter a formula and fill it down a column. The examples work in Excel and Google Sheets.
The working model
A follow-up date is a value derived from another date. You enter the last activity date by hand. The sheet computes the next follow-up from it. If you type follow-up dates yourself, they go stale and you stop trusting them.
Spreadsheets store dates as serial numbers, one per day. That is why adding 7 to a date gives the date one week later.
The basic formula
Put this in H2 and fill it down:
=IF(F2="","",F2+7)The IF checks whether F2 is empty. If it is, the formula returns an empty string, so the cell stays blank. Otherwise it returns the last activity date plus seven days.
Without the IF, an empty F2 counts as 0. The result would be 7, which displays as a date in January 1900. This is the most common error with this formula.
Check that the result is a date
If H2 shows a number such as 46349, the cell is formatted as a number. Change the format to Date. If H2 shows #VALUE!, F2 probably holds text that only looks like a date. Common causes are a date pasted from an email or typed in a format your locale does not recognize. Retype the date, or select the column and set its format to Date.
You can test a cell with =ISNUMBER(F2). It returns TRUE for a real date and FALSE for text.
Adjusting the waiting period
A fixed 7 days suits most cases, but the right wait depends on the stage. A common approach is to keep the wait in a visible cell so you can change it in one place. For example, put 7 in cell M1 and label L1 "Follow-up days". Then use an absolute reference:
=IF(F2="","",F2+$M$1)The dollar signs lock the reference, so filling down keeps pointing at M1. If you used M1 without them, row 3 would point at M2, which is empty.
Skipping weekends
If you would rather not follow up on a Saturday or Sunday, use WORKDAY. It adds working days and skips weekends:
=IF(F2="","",WORKDAY(F2,5))This returns the date five working days after F2, which is the same calendar week count as 7 days in most cases but never lands on a weekend.
Combine with the status
Closed applications do not need a follow-up. You can blank the date when the status is final:
=IF(OR(F2="",D2="Rejected",D2="Withdrawn",D2="Accepted"),"",F2+7)OR returns TRUE if any condition is true. Any closed status, or an empty F2, gives a blank cell. This also means the conditional formatting rule from the next chapter has fewer rows to ignore.
Common errors
| Symptom | Likely cause | Fix |
|---|---|---|
| H shows 1900 dates | No `IF` guard for empty F | Wrap the formula in `IF(F2="","",...)` |
| H shows a plain number | Cell has a number format | Set the format to Date |
| `#VALUE!` | F holds text, not a date | Retype the date or reformat the column |
| Row 3 returns wrong results after fill down | Missing `$` on the wait cell | Use `$M$1` |
| Dates do not update | Calculation set to manual | Set calculation to automatic |
Exercise
Write a formula for H2 that returns blank when F2 is empty or when the status in D2 is "Rejected", and otherwise returns the date 10 days after F2.
Show answer
=IF(OR(F2="",D2="Rejected"),"",F2+10)
Exercise
You change the wait from 7 to 5 days by editing the formula in H2 only, then fill down. Why is storing the wait in a separate cell better?
Show answer
With the wait in one cell referenced as $M$1, you change it once and every row updates. Editing the number inside formulas means editing every row, and rows can end up inconsistent.