Reviewing and Improving
This chapter assumes you already run pomodoros, plan a day in them, give each task an estimate, and record completed pomodoros and interruptions. Here you turn those records into better estimates and a better routine.
Why review at all
A record only helps if you read it. Without a review, you repeat the same estimating mistakes every day. The Pomodoro Technique includes a short review step for this reason. Its aim is to see how your work differs from your plan, so that tomorrow's plan is more realistic.
Review works at two time scales:
- Daily review: five minutes at the end of the day. You check what you finished and what interrupted you.
- Weekly review: ten to fifteen minutes. You look for patterns across several days and change one thing.
The daily review
At the end of the day, answer three questions for each task.
- How many pomodoros did I estimate?
- How many did it actually take?
- What interrupted me, and was the interruption internal (my own urge to check something) or external (a person or a notification)?
Then write the gap down. A task estimated at 3 that took 4 has a gap of +1. A task estimated at 1 that took 1 has a gap of 0. Gaps matter more than totals, because they show where your guesses go wrong.
Computing your estimation gap
The log from the tracking chapter already holds the numbers you need. This script adds a per-task gap and an overall ratio.
log = [
{"task": "write report", "estimated": 3, "done": 4, "internal": 2, "external": 1},
{"task": "review pull request", "estimated": 1, "done": 1, "internal": 0, "external": 0},
{"task": "prepare slides", "estimated": 2, "done": 3, "internal": 1, "external": 2},
]
total_estimated = 0
total_done = 0
for entry in log:
gap = entry["done"] - entry["estimated"]
interruptions = entry["internal"] + entry["external"]
print(f"{entry['task']}: gap {gap:+d}, interruptions {interruptions}")
total_estimated += entry["estimated"]
total_done += entry["done"]
ratio = total_done / total_estimated
print(f"Actual / estimated: {ratio:.2f}")For this log the script prints a ratio of 1.33. Your tasks took a third longer than you guessed. A positive gap means you underestimated, and a negative gap means you overestimated.
Turning the ratio into a better estimate
Once you have a ratio from a week or two of data, use it as a correction factor. If your ratio is 1.33, multiply new estimates by about 1.3 and round up. A task you would have called 3 pomodoros becomes 4.
This works best when you also look at the task type. Writing may run over often, while routine email may run under. Keep the ratio per type if you have enough data. With only a few entries, one overall ratio is safer.
Reading the interruptions
Interruptions explain many gaps. Compare the interruption counts with the gaps in your log.
| Pattern in the log | Likely cause | Change to try |
|---|---|---|
| Many internal interruptions | Urges to check mail or messages | Keep a "later" list on paper and note the urge instead of acting |
| Many external interruptions | Colleagues or notifications | Use inform, negotiate, schedule, call back, and mute notifications |
| Few interruptions, large gaps | Estimates are too optimistic | Apply the correction factor |
| Gaps near zero | Estimates fit your work | Keep the method and review less often |
The point is to pick one change, not all of them.
The weekly review
Once a week, look at the daily numbers together. Four questions are enough:
- Is my actual-to-estimated ratio moving toward 1.0?
- Which kind of interruption happened most?
- Did I finish the tasks I planned, or did unplanned work take over?
- Which single change will I try next week?
Write the answer to the last question where you will see it on Monday. Change only one thing per week. If you change three, you cannot tell which one helped.
Common review mistakes
- Judging yourself instead of the plan. A gap is information about the estimate. It is not a verdict on your effort.
- Skipping reviews on busy days. Busy days contain the most interruptions, so they teach the most. Even two minutes helps.
- Changing the estimates but not the cause. If interruptions drive the gaps, a bigger correction factor only hides the problem.
- Reviewing too little data. One day of numbers is noisy. Wait for several days before you trust a ratio.
Exercise
Your log for one week shows 10 estimated pomodoros and 14 completed. You plan to estimate a new task at 5 pomodoros. What is the ratio, and what estimate should you use after applying it?
Show answer
The ratio is 14 / 10 = 1.4. Multiplying 5 by 1.4 gives 7, so estimate the new task at 7 pomodoros.
Exercise
Over a week, one task has a gap of +3 and 8 internal interruptions, but only 1 external one. Which change from the table should you try first, and why?
Show answer
Try the "later" list: write down each urge on paper and keep working. Most of the interruptions are internal, so adding a stricter correction factor would hide the cause. Reducing the urges attacks the cause directly.