Sub topic 1
Why Product Decisions Need Prioritization
Prerequisites
You should know basic product vocabulary: feature, requirement, stakeholder, and release. You should also understand what a backlog is, which is an ordered list of pending work. Basic Python helps with the code example.
Why prioritization matters
A product team rarely has unlimited time, money, or people. When those limits are fixed, adding one feature means dropping or delaying another. Prioritization is the decision about which work goes first and which waits.
Without a shared method, the loudest stakeholder tends to win. A written method makes the reasoning visible and easier to defend.
MoSCoW: what it is and where it comes from
MoSCoW is a prioritization method that sorts requirements into four groups. The name is a mnemonic built from the capital letters of Must, Should, Could, and Won't. It comes from the Dynamic Systems Development Method (DSDM), an agile project framework from the 1990s.
Must, Should, Could and Won't have
- Must have: the release fails without it.
- Should have: important, but a workaround exists if it is missing.
- Could have: desirable, and the first thing dropped when time runs short.
- Won't have (this time): agreed out of scope for this release. It may return later.
Using MoSCoW inside a fixed time box
A time box is a fixed period, such as a six-week sprint with a fixed team. The date stays put and the scope flexes. Teams fill the box with Musts first, then Shoulds, then Coulds.
DSDM guidance commonly suggests keeping Musts near 60% of planned effort. That leaves room for overruns in the other groups.
items = [
{"name": "Login", "effort": 8, "moscow": "must"},
{"name": "Search", "effort": 6, "moscow": "must"},
{"name": "Export", "effort": 5, "moscow": "should"},
{"name": "Dark mode", "effort": 3, "moscow": "could"},
{"name": "Plugins", "effort": 13, "moscow": "wont"},
]
def must_share(items):
in_scope = [i for i in items if i["moscow"] != "wont"]
total = sum(i["effort"] for i in in_scope)
must = sum(i["effort"] for i in in_scope if i["moscow"] == "must")
return must / total
share = must_share(items)
print(f"Must share: {share:.0%}")Exercise
The code above prints a Must share of 74%. Which single change would bring it to about 60%, and why is that change safe to consider?
Show answer
Move one Must item to Should, such as Search (6 of 19 in-scope effort, bringing Must to 13 of 19, or 68%, and moving a second item would reach about 58%). It is safe to consider only if the item still has a workaround and stakeholders agree. The check flags a plan that depends too heavily on Musts. It does not decide which items change.