Sub topic 10
Accounting and Costing Views: Valuation and Price Control
This chapter assumes you know SAP GUI navigation, the meaning of plant and company code, and the basic idea of views in the material master. It covers the Accounting and Costing views, which hold the data that turns a physical stock movement into a financial posting.
What these views do
The Accounting 1 view stores valuation data. The Costing views store data for product costing. Together they decide what a unit of the material is worth and how that value changes after each goods movement.
Valuation data is kept at the valuation level, usually the plant. Each plant can therefore value the same material differently. The data lives in table MBEW, one row per material and valuation area.
Key fields
| Field | Meaning |
|---|---|
| Valuation Class | Links the material to general ledger accounts through automatic account determination |
| Price Control | Selects how the material is valued: S or V |
| Standard Price | Fixed price used when price control is S |
| Moving Price | Average price, recalculated automatically when price control is V |
| Price Unit | Number of units the price refers to |
The valuation class is the most important field. It works together with the material type and the posting transaction to find the G/L accounts. A wrong valuation class sends postings to the wrong accounts.
Standard price and moving average price
Price control S (standard price) values all movements at one fixed price. Differences between this price and the real price go to price difference accounts. Price control V (moving average price) revalues stock with each goods receipt, so the price follows the real cost.
Take 10 pieces valued at 5.00 each, a stock value of 50.00. You receive 10 more pieces at 7.00 each. Under price control V, the stock value becomes 120.00 for 20 pieces, so the new price is 6.00. Under price control S with a standard price of 5.00, the stock stays valued at 5.00 per piece and the 20.00 difference goes to a price difference account.
Where the Costing views fit
The Costing 1 and Costing 2 views hold the data used to calculate the standard price. Examples are the costing lot size, the costing-relevant flag, and the planned price fields. A cost estimate calculated from the bill of materials and routing can be released to become the new standard price.
Common errors
- Changing the price control after postings exist is restricted. A change normally requires a controlled price control change with a period-end process, and it is risky for stock already valued.
- The Accounting view is missing when you try a goods movement. Extend the material to the plant's valuation area first.
- The valuation class is not allowed for the material type. The material type controls which classes can be assigned.
Exercise
A material has price control V, 10 pieces in stock at a moving price of 8.00, and you receive 5 pieces at 11.00. What is the new moving price?
Show answer
The stock value is 10 × 8.00 + 5 × 11.00 = 135.00 for 15 pieces. The new moving price is 135.00 / 15 = 9.00.
Exercise
Which field links a material to the general ledger accounts, and at which level is its data stored?
Show answer
The valuation class links the material to the G/L accounts through automatic account determination. It is stored in table MBEW at the valuation level, usually the plant.