Sub topic 19
Choosing and Adopting a Standard in a Team
This chapter assumes you can build multi-sheet Excel workbooks and use IF, SUM, AND and ABS. It also assumes you have met the FAST Standard and the ICAEW Financial Modelling Code in earlier chapters. The aim here is practical: how a team picks a standard and gets everyone to use it.
Why adoption is harder than choosing
Most teams already agree that models should be tidy. The difficulty is that each modeller has personal habits, and a standard asks people to give some of them up. A standard that sits in a folder and is never used reduces no risk.
Adoption fails for predictable reasons:
- The standard is too long, so nobody reads it.
- Nobody owns it, so it never gets updated.
- Compliance is checked only at the end, when fixing a model is expensive.
- The standard is applied to every model, including a quick one-off analysis, and people start to resent it.
The last point connects to the Appropriate principle in FAST. A standard should scale with the model's purpose and audience, not apply the same weight everywhere.
Choosing a standard
You rarely need to write a standard from scratch. Compare the options against your team's situation.
| Option | Strength | Weakness | Fits best when |
|---|---|---|---|
| Adopt FAST as published | Concrete, rule-based, widely known | Written for general use, so it may not name your tools or templates | Your team wants specific rules quickly |
| Follow the ICAEW Financial Modelling Code | High-level principles that suit review and governance | Less prescriptive about layout and formulas | You need an approach to explain to auditors or the board |
| Write an in-house standard | Matches your tools, sectors and templates | Costly to write and maintain, and not known outside the firm | You have many models with shared structure |
| Adopt FAST and add a short in-house appendix | Combines published rules with local detail | Needs a named owner to keep the appendix current | Most teams |
The last row is the usual choice. The published standard supplies the rules, and a one-page appendix covers local choices such as your colour scheme, sheet names, units and file naming.
Questions to settle before you choose
- Who builds models, and who only reviews or uses them?
- How many models exist, and how often are they rebuilt rather than updated?
- Do clients, lenders or auditors expect a named standard?
- Which models carry the highest risk if they are wrong?
- Who will own the standard after the launch?
Start with the highest-risk models
You do not have to convert every model. Rank your models by the consequence of an error: money at stake, number of people relying on the output, and how often the model is reused. Apply the full standard to new high-risk models first. Apply a lighter subset to the rest.
A workable approach is to define two tiers.
| Tier | Typical model | Required rules |
|---|---|---|
| Core | Board-level, lender-facing, or reused many times | All standard rules, a documented review, integrity checks, a change log |
| Light | One-off analysis for a single decision | Separate inputs, consistent formulas, no hardcodes in formulas, one balance or total check |
The light tier still blocks the most damaging errors. Even a quick model benefits from the habits shown in the earlier code examples, such as a formula that is identical across a row.
Make the standard checkable
A rule is useful in practice only if a reviewer can check it. "Models should be clear" cannot be checked. "Each row contains one formula copied across all columns" can.
Turn the rules into a checklist of yes/no questions. Examples:
- Are inputs held only on the inputs sheet?
- Is every row's formula identical across the timeline?
- Does any formula contain a typed number other than 0 or 1?
- Does every calculation row have a unit label?
- Does the check summary read OK?
Some of these can be automated inside the model. A summary cell can collect every integrity flag in the workbook so that the model reports its own status:
Checks!D5: =IF(SUM(Checks!D8:D20)>0,"CHECK","OK")
' Checks!D8:D20: one flag per integrity check
' (0 = pass, 1 = fail), each linked from the
' calculation sheets, such as the balance check row.Show this status in the header of the outputs sheet. Then a user sees immediately whether the model is currently reliable.
A rollout plan
Introduce the standard in stages. Each stage should produce something the team can see.
- Agree the scope. Decide which models and which tier each belongs to.
- Name an owner. One person maintains the standard and answers questions.
- Build a template. Provide a workbook with the sheet layout, timeline rows, flag rows, a checks sheet and formatting already in place. A template makes the standard the easiest path.
- Train briefly. One short session using a real model from your own work teaches more than a slide deck.
- Pilot on one new model. Collect problems and revise the standard before wider use.
- Review each model against the checklist before it is released.
- Revisit the standard on a fixed date, for example once a year.
The diagram shows how these stages feed back into the standard.
Common problems and how to handle them
Resistance from experienced modellers. They may see the standard as a criticism of their style. Involve them in writing the appendix, and let them propose changes. A rule they helped shape is more likely to be followed.
Legacy models. Do not rebuild every old model. When one must be changed substantially, bring it into line then. Until that happens, record which rules it breaks so reviewers know where the risk lies.
Rules that conflict with the purpose. Sometimes a rule makes a model harder to use. Allow a documented exception: state which rule was broken, why, and who approved it. Exceptions that are written down are controlled. Exceptions that are silent become the new habit.
Standard drift. Without an owner and a review date, the template and the written rules diverge. Keep the template and the standard in the same place and update them together.
Checking too late. Review during the build, not only before release. A reviewer who sees the layout at the start can catch a structural problem when it costs minutes to fix, not days.
Measuring whether it works
You do not need elaborate metrics. A few simple signals show whether adoption is real:
- The share of new models started from the template.
- The number of issues found per review, and whether it falls over time.
- The time a reviewer needs to understand an unfamiliar model.
- Whether errors found after release are becoming rarer.
If review time is not falling after a few models, the standard may be too heavy, or the template may be missing something people need.
Summary of decisions
- Choose a published standard and add a short local appendix.
- Rank models by risk and apply two tiers.
- Express rules as yes/no checks.
- Provide a template, an owner and a review date.
- Allow exceptions only when they are written down.
Exercise
Your team of six builds about thirty models a year. Five are lender-facing and the rest are short analyses for internal decisions. Lenders do not require a named standard. Propose a choice of standard, a tiering approach, and the first two rollout steps.
Show answer
Adopt FAST as published and add a one-page in-house appendix covering colours, sheet names, units and file naming. Use two tiers. The five lender-facing models are Core, with all rules, a documented checklist review, integrity checks and a change log. The internal analyses are Light, with separate inputs, consistent row formulas, no hardcodes in formulas and a single check. First step: agree the scope and tiers, and name one owner. Second step: build a template containing the sheet layout, timeline and flag rows, a checks sheet with a summary status cell, and formatting, then pilot it on the next new lender-facing model.
Exercise
A modeller releases a model with one rule broken because following it would have made a sheet much harder to read. What should the team require, and why?
Show answer
The team should require a documented exception that states which rule was broken, the reason, and who approved it. A recorded exception lets reviewers and later users know where the risk lies and lets the owner decide whether the standard itself needs changing. An undocumented exception hides the deviation and tends to spread as a habit.