Sub topic 11
Scenarios and Switches
Assume you can use cell references, simple formulas, and percentages. You should also understand the basic purpose of an income statement. This chapter shows how to compare assumptions without rebuilding the model each time.
Why use scenarios?
A scenario is a named set of assumptions. For example, a financial model might include:
- Base case: the most likely assumptions.
- Upside case: stronger growth and better margins.
- Downside case: weaker growth and higher costs.
A switch is a control that tells the model which scenario to use. Instead of changing many input cells manually, you change one cell. The calculation layer then reads the assumptions for that scenario.
This approach makes comparisons faster and reduces accidental changes to unrelated inputs.
Build a scenario table
Keep scenario assumptions in the inputs layer. Put scenarios in columns and assumptions in rows.
| Assumption | Base | Upside | Downside |
|---|---|---|---|
| Revenue growth | 10% | 18% | 2% |
| COGS percentage | 60% | 55% | 68% |
| Operating expenses | 150,000 | 160,000 | 155,000 |
Add a selector cell, such as Inputs!C2, containing Base, Upside, or Downside. The selector is an input. It should have a clear label and a validation list so users cannot enter an unsupported name.
In Excel, a calculation can select the value from the matching scenario column with XLOOKUP:
Calc!E10 = D10*(1+XLOOKUP(Inputs!$C$2,Inputs!$C$4:$E$4,Inputs!$C$5:$E$5))Here, Inputs!$C$2 contains the selected scenario. The first lookup range contains the scenario names. The second range contains the revenue growth assumptions. The formula can be copied across the time axis when the prior-period revenue is in the cell to its left.
A simpler design uses one active-assumptions column. Formulas in that column use XLOOKUP to pull the selected value from the scenario table. The calculation layer then references only the active assumptions column. This keeps calculation formulas shorter and makes the selected assumptions easy to review.
Keep switches out of calculations
The switch should select assumptions, not contain financial logic. For example, avoid putting separate revenue formulas inside an IF expression for every scenario. That design duplicates logic and makes later changes difficult.
Use this flow:
- The selector chooses a scenario.
- The inputs layer returns the active assumptions.
- The calculations layer applies the same formulas.
- The outputs layer reports the result.
The same calculation formula should work for every scenario. Only the input values change.
Test the switch
Change the selector from Base to Upside and confirm that the output changes in the expected direction. Then select Downside. Check both the results and the active assumptions.
Add an integrity check that confirms the selector is valid:
Checks!C4 = IF(OR(Inputs!$C$2="Base",Inputs!$C$2="Upside",Inputs!$C$2="Downside"),0,1)A result of 0 means the selector is valid. Add this check to the model's master check so an invalid scenario cannot appear unnoticed.
Exercise
Why should the scenario selector change input assumptions rather than calculation formulas?
Show answer
A single calculation path keeps the model consistent. Changing only the assumptions avoids duplicated logic and makes differences between scenarios easier to audit.