Sub topic 2
Launch vehicles: PSLV, GSLV, LVM3, SSLV and cryogenic and reusable technology
Prerequisites and scope
This chapter assumes you know the orbit types from the previous chapter: LEO, GTO, GEO, polar and sun-synchronous orbits. It also assumes basic Class 11 physics (thrust, momentum, Newton's third law). A launch vehicle is a rocket that carries a payload, such as a satellite or a crew module, to a target orbit. UPSC asks about the vehicle name, the number of stages, the fuel type, the payload class, and famous missions. This chapter organises those facts so you can recall them under exam pressure.
How a launch vehicle works
A rocket produces thrust by expelling mass at high speed. It carries both fuel and oxidiser, so it works in vacuum. Rockets are built in stages. When a stage burns out, it is dropped, and the rocket sheds dead weight.
Three ideas matter for the exam:
- Propellant types. Solid propellant is a rubbery or hard fuel-oxidiser mix. It is simple, storable and gives high thrust, but it cannot be throttled or shut off. Liquid propellant is pumped into a combustion chamber and can be controlled. Cryogenic propellant is a liquid propellant made of gases cooled to very low temperatures.
- Specific impulse. This measures how efficiently a propellant produces thrust. Cryogenic engines have the highest specific impulse among chemical engines.
- Payload capacity depends on the orbit. A vehicle lifts more mass to LEO than to GTO. The same rocket therefore has two capacity figures.
Propellant combinations used by ISRO
| Propellant type | Fuel and oxidiser | Where it appears |
|---|---|---|
| Solid | HTPB (hydroxyl-terminated polybutadiene) binder with ammonium perchlorate | PSLV first stage, S200 boosters on LVM3, SSLV stages |
| Earth-storable liquid | UDMH fuel with nitrogen tetroxide (N2O4) oxidiser | Vikas engine, PSLV second stage |
| Cryogenic | Liquid hydrogen (LH2) with liquid oxygen (LOX) | GSLV upper stage (CUS), LVM3 upper stage (C25) |
Liquid hydrogen boils at about −253 °C and liquid oxygen at about −183 °C. This is why the engine is called cryogenic.
The main Indian launch vehicles
SLV and ASLV (historical)
The Satellite Launch Vehicle (SLV-3) first succeeded in 1980, putting Rohini into LEO. The Augmented Satellite Launch Vehicle (ASLV) followed. Both were all-solid, and both were retired. They are asked mainly in history-of-ISRO questions.
PSLV: the workhorse
The Polar Satellite Launch Vehicle has four stages that alternate between solid and liquid: solid, liquid, solid, liquid. It was designed for polar and sun-synchronous orbits and is the most reliable Indian vehicle.
- PSLV-C37 (2017) launched 104 satellites in one flight.
- PSLV launched Chandrayaan-1 (2008), Mangalyaan (2013) and Astrosat (2015).
- PSLV-XL has six strap-on boosters. PSLV-QL has four. PSLV-CA has none ("core alone").
- The PS4 upper stage can serve as an orbital platform. The PSLV Orbital Experimental Module (POEM) uses spent stages for experiments.
GSLV: the first cryogenic user
The Geosynchronous Satellite Launch Vehicle is a three-stage vehicle. Its first stage is solid, with four liquid strap-on boosters using the Vikas engine. The second stage is liquid. The third stage is cryogenic. It targets GTO.
- GSLV Mk I used a Russian cryogenic stage.
- GSLV Mk II uses the indigenous Cryogenic Upper Stage (CUS), first flown successfully in January 2014 (GSLV-D5).
- GSLV-F12 (2023) launched NVS-01, the first of the second-generation NavIC satellites.
- GSLV Mk II launched NISAR (a joint NASA-ISRO radar mission) in 2025.
LVM3: the heavy lifter
Launch Vehicle Mark 3 was earlier called GSLV Mk III. It is a three-stage vehicle with two S200 solid boosters, a liquid core stage (L110, two Vikas engines) and a C25 cryogenic upper stage powered by the CE-20 engine.
- It carries about 4 tonnes to GTO and about 8 tonnes to LEO.
- Chandrayaan-2 (2019), Chandrayaan-3 (2023) and the OneWeb launches used LVM3.
- It is the planned vehicle for Gaganyaan, in a human-rated version (HLVM3).
SSLV: small satellites on demand
The Small Satellite Launch Vehicle is a three-stage all-solid vehicle with a liquid velocity trimming module for final orbit adjustment. It carries up to about 500 kg to LEO. It is built for low-cost, quick-turnaround commercial launches. Its first flight in 2022 failed to reach the correct orbit. SSLV-D2 succeeded in February 2023.
Comparison
| Vehicle | Stages | Typical target | Approx. capacity | Key feature |
|---|---|---|---|---|
| PSLV | 4 (solid-liquid-solid-liquid) | SSO, polar LEO | ~1,750 kg to SSO | Reliable, multi-satellite launches |
| GSLV Mk II | 3 | GTO | ~2,200 kg to GTO | Indigenous cryogenic stage |
| LVM3 | 3 | GTO and LEO | ~4,000 kg to GTO | Heavy lift, crewed missions |
| SSLV | 3 plus VTM | LEO | ~500 kg | Small, low cost, on demand |
Cryogenic technology
A cryogenic engine burns liquid hydrogen and liquid oxygen. It is hard to build for three reasons. The propellants must be kept extremely cold. The turbopumps must work at those temperatures. The materials must not become brittle.
The history matters for UPSC:
- India signed a deal with Russia (Glavkosmos) in the early 1990s for cryogenic stages and technology.
- The United States objected, citing the Missile Technology Control Regime (MTCR). Russia then supplied seven stages without technology transfer.
- ISRO developed the CE-7.5 engine for GSLV Mk II. It uses a staged combustion cycle.
- ISRO developed the larger CE-20 engine for LVM3. It uses a gas-generator cycle.
The Liquid Propulsion Systems Centre (LPSC) develops liquid and cryogenic engines. The Vikram Sarabhai Space Centre (VSSC) in Thiruvananthapuram designs launch vehicles. The Satish Dhawan Space Centre (SDSC SHAR) at Sriharikota is the launch site.
Reusable launch technology
A reusable launch vehicle (RLV) returns some or all of its parts for another flight. This cuts the cost per kilogram.
- RLV-TD (Technology Demonstrator). ISRO tested a winged vehicle in 2016 (HEX mission), which re-entered and splashed into the Bay of Bengal. It was not recovered.
- RLV-LEX. In 2023 and 2024, a winged body was released from a helicopter and landed autonomously on a runway at Chitradurga, Karnataka.
- Scramjet engine. ISRO tested an air-breathing scramjet in 2016. It takes oxygen from the atmosphere instead of carrying it, which reduces lift-off mass.
- Global comparison. SpaceX's Falcon 9 recovers its first stage by landing it vertically. NASA's Space Shuttle was a partly reusable winged orbiter.
Common exam traps
- PSLV's alternating stages are solid-liquid-solid-liquid. LVM3 and GSLV are not alternating.
- GSLV Mk II's cryogenic stage is indigenous. GSLV Mk I used a Russian stage.
- LVM3 was earlier called GSLV Mk III.
- Cryogenic fuel is a cooled gas, not a fuel that is naturally liquid.
- Sriharikota is in Andhra Pradesh. A new spaceport is under development at Kulasekarapattinam in Tamil Nadu for SSLV launches.
- Launch capacity depends on orbit. Always check whether a figure is for LEO, SSO or GTO.
Exercise
A Prelims statement says: "GSLV Mk II uses an indigenously developed cryogenic upper stage, and its first stage is liquid-fuelled." Evaluate it.
Show answer
The first part is correct, since GSLV Mk II uses the indigenous CUS with CE-7.5. The second part is wrong, because the first stage is solid (S139) with four liquid strap-on boosters. The statement as a whole is incorrect.
Exercise
Which Indian vehicle would you choose to launch a 300 kg Earth-observation satellite quickly and cheaply to LEO, and which to launch a 3,500 kg communication satellite to GTO? Give one reason for each.
Show answer
Choose SSLV for the 300 kg satellite, because it is built for small payloads with low cost and fast turnaround. Choose LVM3 for the 3,500 kg satellite, because its GTO capacity is about 4,000 kg, which exceeds the capacity of GSLV Mk II.