Sub topic 5
Marginal cost: the cost of one more unit
This chapter assumes you know opportunity cost and can read a graph with cost on the vertical axis and quantity on the horizontal axis. It also assumes basic algebra: slopes and simple polynomials. You should know the split of total cost into fixed and variable parts, TC = TFC + TVC, from the earlier chapters.
What marginal cost measures
Marginal cost (MC) is the increase in total cost from producing one more unit of output. It answers a narrow question. If the firm is already making q units, what extra does it pay to make unit q + 1?
For a change of any size:
MC = ΔTC / ΔQ
Δ (delta) means "change in". When output rises by exactly one unit, ΔQ = 1, so MC is simply the difference between two total costs:
MC(q) = TC(q) − TC(q − 1)
The same idea applies to larger steps. If a plant moves from 100 to 110 units and total cost rises from 1,000 to 1,080, MC = 80 / 10 = 8 per unit. In that case MC is the average extra cost per unit over the step. It is not the cost of any one unit.
Why fixed cost drops out
Total cost is TFC + TVC. When output rises, TFC does not change, so it cancels in the difference:
MC(q) = [TFC + TVC(q)] − [TFC + TVC(q − 1)] = TVC(q) − TVC(q − 1)
Marginal cost is entirely a variable-cost concept. Rent, a loan payment, or a license fee can double, and MC at every output level stays the same. The fixed cost is already owed at zero output, so one more unit does not add to it.
This is the most common error at this stage. Students add a share of fixed cost to MC, or they compute MC for the first unit as TC(1) − 0 and so include the fixed cost. The correct starting point is TC(0), which equals TFC. The firm owes TFC even when it produces nothing.
Computing MC from a cost schedule
Use the running example: fixed cost of 20 and variable cost TVC(q) = q³ − 6q² + 15q.
FC = 20
def vc(q):
return q**3 - 6*q**2 + 15*q
def tc(q):
return FC + vc(q)
print(" Q TC MC")
for q in range(1, 9):
print(f"{q:>3} {tc(q):>5} {tc(q) - tc(q - 1):>5}")The program prints:
Q TC MC
1 30 10
2 34 4
3 38 4
4 48 10
5 70 22
6 110 40
7 174 64
8 268 94The same numbers in a table, with the arithmetic shown:
| Q | TVC | TC | MC = TC(q) − TC(q−1) |
|---|---|---|---|
| 0 | 0 | 20 | not defined |
| 1 | 10 | 30 | 30 − 20 = 10 |
| 2 | 14 | 34 | 34 − 30 = 4 |
| 3 | 18 | 38 | 38 − 34 = 4 |
| 4 | 28 | 48 | 48 − 38 = 10 |
| 5 | 50 | 70 | 70 − 48 = 22 |
| 6 | 90 | 110 | 110 − 70 = 40 |
| 7 | 154 | 174 | 174 − 110 = 64 |
| 8 | 248 | 268 | 268 − 174 = 94 |
Three things stand out.
- MC is not monotonic. It falls from 10 to 4, stays at 4, and then rises steeply.
- The first row of MC uses TC(0) = 20, the fixed cost. Row 0 has no MC because there is no earlier output to compare it with.
- MC equals the change in TVC. For q = 4, TVC rises from 18 to 28, a change of 10, and MC is 10.
Where the position of each MC value belongs
The value 10 in the row for Q = 4 describes the step from 3 units to 4 units. Strictly, it belongs between the two quantities. Many textbooks plot it at the upper quantity (4) and some at the midpoint (3.5). Pick one convention and use it consistently. Plotting at the midpoint makes the match with calculus, covered next, closer.
MC as a slope
Total cost plotted against quantity is a curve. MC is the slope of that curve. ΔTC / ΔQ is rise over run. Where the TC curve is flat, MC is low. Where the TC curve is steep, MC is high.
This explains the shape in the schedule. At first, TC rises slowly. Each added unit uses the fixed inputs more effectively, so extra cost per unit falls. Later, TC rises faster and faster, so MC climbs. The reason behind the later rise is diminishing marginal returns, which a later chapter develops.
The calculus version
When output can be divided finely, such as liters of milk or kilowatt-hours, the step can be made very small. MC becomes the derivative of total cost:
MC = dTC / dQ
Because TFC is a constant, its derivative is zero, so MC = dTVC / dQ. This agrees with the point above that fixed cost drops out.
For the running example, TVC(q) = q³ − 6q² + 15q, so:
MC(q) = 3q² − 12q + 15
Check the formula against the schedule. The derivative gives the exact slope at a point. The schedule gives a change over a whole unit. These two will differ slightly. The unit difference is best compared with the derivative at the midpoint of the step:
def mc_formula(q):
return 3*q**2 - 12*q + 15
def mc_step(q):
vc = lambda x: x**3 - 6*x**2 + 15*x
return vc(q) - vc(q - 1)
print(" Q step formula at q-0.5")
for q in range(1, 9):
print(f"{q:>3} {mc_step(q):>5} {mc_formula(q - 0.5):>10.2f}")Each row shows the step value above the formula value by exactly 0.25. For q = 5, the step is 22 and the formula at 4.5 is 21.75. For a cubic, the difference is a constant, which is why the match is so close. For the first row, the step is 10 and the formula gives 9.75.
The derivative also lets you find the minimum of MC. Setting the slope of MC to zero gives 6q − 12 = 0, so q = 2. At that point MC = 3(4) − 12(2) + 15 = 3. In the integer schedule the lowest value is 4, because 4 is the lowest value on the grid of whole units.
Which cost does a decision use?
MC is the right number for decisions at the margin. A firm deciding whether to raise output from 5 to 6 units should compare the added revenue from the sixth unit with MC of 40. Average total cost at 6 units is 110 / 6, about 18.33. That figure looks low, but it is misleading, because it includes the cheap early units and the sunk fixed cost. The sixth unit costs 40, and that is what the firm gives up to make it.
A rule you will use in later chapters: expand output as long as the revenue from one more unit exceeds its marginal cost, and stop where they are equal. This chapter only needs the cost side of that rule.
Common errors
- Dividing instead of subtracting. TC divided by Q is average total cost. MC is the difference between two total costs.
- Using TVC where TC is expected. Using TC(q) − TC(q − 1) or TVC(q) − TVC(q − 1) gives the same answer. Mixing one of each, for example TC(q) − TVC(q − 1), gives a wrong answer that is off by exactly the fixed cost.
- Treating MC as a constant. Linear-cost textbook examples have a constant MC, but a short-run firm with a fixed input normally does not. MC changes with output.
- Reading MC from a step larger than one unit. When quantities jump by 10, ΔTC / ΔQ is an average over that step. Do not report it as the cost of the last unit.
- Forgetting the starting point. If the schedule begins at Q = 0, the first MC is TC(1) − TC(0). If it begins at Q = 1, the first MC cannot be computed from the table alone.
A worked check with irregular steps
A bakery's total cost schedule is:
| Q | TC |
|---|---|
| 0 | 50 |
| 10 | 90 |
| 20 | 120 |
| 40 | 220 |
Between 0 and 10: MC = (90 − 50) / 10 = 4 per unit. Between 10 and 20: MC = (120 − 90) / 10 = 3 per unit. Between 20 and 40: MC = (220 − 120) / 20 = 5 per unit.
The last value is an average over 20 units. The bakery cannot tell from this table whether the 40th loaf costs 5 or 9 to make. The point is that the denominator is ΔQ, not 1, whenever the step is larger than one unit.
Exercise
A firm's total cost is 25 at Q = 10, 31 at Q = 11, and 39 at Q = 12. (a) What is the marginal cost of the 12th unit? (b) The landlord raises the rent, and fixed cost increases by 5 at every output level. What is the marginal cost of the 12th unit now? (c) Using a bigger step, what is the average marginal cost from Q = 10 to Q = 12?
Show answer
(a) MC = TC(12) − TC(11) = 39 − 31 = 8. (b) Still 8. TC(12) becomes 44 and TC(11) becomes 36, and the difference is 8, because the added fixed cost cancels. (c) ΔTC / ΔQ = (39 − 25) / 2 = 7 per unit. This is the average of the 11th unit (6) and the 12th unit (8).
Exercise
A firm has fixed cost 20 and TVC(q) = q³ − 6q² + 15q. Find MC(q) by differentiation, and use it to find the output at which MC is lowest and the value of MC there.
Show answer
TVC differentiated gives MC(q) = 3q² − 12q + 15. The derivative of MC is 6q − 12, which equals zero at q = 2. MC(2) = 3(4) − 12(2) + 15 = 3. The fixed cost of 20 has derivative zero, so it plays no role. The integer schedule shows 4 as its lowest value because it measures whole-unit steps.