Sub topic 6
Add energy and context notes
A time log tells you where hours went. It does not tell you how those hours felt or what was going on around them. This chapter adds two small fields to each log entry, an energy rating and a short context note. Both make the later pattern analysis much more useful.
This chapter assumes you have already chosen your categories and a capture method. It also assumes you can read a simple CSV file or spreadsheet.
Why record energy at all
Two people can both spend three hours on deep work. One finishes feeling sharp and the other feels drained. Hours alone cannot show that difference. An energy rating lets you ask better questions later. Which categories leave you tired? At what time of day do you do your best work? Are your longest meetings also your lowest-energy blocks?
Energy data also protects you from a common mistake. If you only look at totals, you may decide to cut the biggest category. Energy notes might show that the biggest category is fine and the real drain is a small one.
Use a simple 1 to 5 scale
Pick a scale you can apply in a few seconds. This tutorial uses 1 to 5:
| Rating | Meaning |
|---|---|
| 1 | Exhausted, struggling to focus |
| 2 | Low, working on willpower |
| 3 | Neutral, steady |
| 4 | Good, focused and engaged |
| 5 | Excellent, in flow |
Rate your energy at the end of each entry, as you feel it right then. Do not try to judge it afterwards from memory. Ratings recalled hours later drift toward the middle and lose their value.
A finer scale, such as 1 to 10, adds effort without adding information. You will not reliably tell a 6 from a 7.
Add a short context note
The context note records anything unusual that could explain the entry. Keep it to a few words. Useful examples:
- slept badly
- interrupted twice
- deadline today
- working from a cafe
- skipped lunch
You do not need a note on every row. Write one when something stands out. When you review the week, these notes explain outliers that the numbers alone would leave puzzling.
In the CSV from earlier chapters, the activity column already holds a short description. You can keep context in that field or add a separate context column. A separate column is easier to filter later:
date,start,end,category,activity,energy,context
2026-03-03,09:00,10:30,deep_work,Draft quarterly report,4,
2026-03-03,10:30,10:50,communication,Email and chat,3,
2026-03-03,10:50,11:30,meetings,Team standup and follow-up,2,slept badly
2026-03-03,11:30,12:15,admin,Expense reports,2,interrupted twiceIf you add the column, add it to every row, even when the value is empty. Rows with different numbers of fields cause errors when you summarize the data.
Calculate average energy per category
Once the log has energy ratings, you can average them by category. The script below reads the extended CSV and prints each category's average energy rating.
import csv
from collections import defaultdict
ratings = defaultdict(list)
with open("time_log.csv", newline="") as f:
for row in csv.DictReader(f):
if row["energy"]:
ratings[row["category"]].append(int(row["energy"]))
for category, values in sorted(ratings.items()):
average = sum(values) / len(values)
print(f"{category}: {average:.1f} average energy ({len(values)} entries)")The script skips rows with a blank energy value instead of failing. Check the entry counts in the output. An average built from two entries is weak evidence.
Common mistakes
- Rating what you think you should feel. Record the feeling, not the expected one. A "good" meeting can still be a 2.
- Writing long notes. Long notes slow logging, and you will stop doing it. Use a few words.
- Skipping ratings when busy. Missing values are fine now and then. A log with many blanks cannot support averages.
- Changing the scale midweek. Keep the same meaning for each number all seven days.
Exercise
A colleague's log shows that "admin" takes only 5% of their week, so they plan to ignore it. Their energy data shows admin entries average 1.4, the lowest of any category. What does the energy data suggest, and what would a context note help you check?
Show answer
Admin is small in hours but is a heavy drain on energy, so it may deserve attention, for example by moving it to a time of day when energy is higher or batching it. Context notes would help check whether the low ratings come from the work itself or from circumstances such as poor sleep, interruptions, or doing admin at the end of a long day.