Sub topic 3
Step 5: Develop Raw Ideas
This chapter assumes you have completed Steps 1 to 4: a written focus, a random word, a list of its attributes, and forced connections between those attributes and your focus. Each connection is a raw idea, usually a vague sentence. Step 5 turns those sentences into ideas you can test.
Developing raw ideas
Take one connection and answer three questions in writing:
- What changes for the user or customer?
- What would it take to build or try this?
- What is the smallest version I could test this week?
Keep the original raw idea above your answers so you can trace where the idea came from.
Evaluating and selecting ideas
Score each developed idea from 1 to 5 on impact for your focus and feasibility with your current resources. Keep the top two or three. Park low-scoring ideas instead of deleting them, because a weak idea can spark a stronger one later.
A complete worked example
Focus: reduce the time new hires take to feel productive. Random word: "ladder".
- Attributes: has rungs, leans on a support, lets you climb one step at a time.
- Forced connection: onboarding happens in steps, and each step unlocks the next.
- Developed idea: a weekly checklist where each task unlocks the next, with a visible win on day one.
- Score: impact 4, feasibility 4. Selected for a one-week test.
Common pitfalls and how to avoid them
- Judging ideas too early. Develop the idea before scoring it.
- Choosing a word that relates to the focus. Pick a word from a list you did not tailor to the problem.
- Forcing too many connections. Stop when a connection produces a clear idea, and move on.
> Do not use block quotes.
Running random entry with a group
Give each person a separate sheet. Each person draws their own word and develops their own ideas for five minutes. Then the group compares results and scores them together. Separate work prevents the loudest voice from setting the direction.
Variations: random images, objects and other prompts
Replace the word with a random image or a random object from the room. The steps stay the same: list attributes, force connections to the focus, develop, and evaluate.
Exercise
Exercise
You select the idea "a weekly checklist where each task unlocks the next" and score it impact 2, feasibility 5. Should you select it for testing, and why?
Show answer
Probably not on its own. Its impact is low, so it would not move the focus much. Park it, or develop it further to raise the impact before testing.