Sub topic 10
Step 5: Develop raw ideas
This chapter assumes you have already written a focus statement, drawn a random word, listed its attributes, and forced at least a few connections to the focus (Steps 1 to 4). You should have a page of rough fragments. This step turns the promising fragments into proposals that someone could act on. Choosing among those proposals is covered in the next chapter, so here you develop ideas and don't judge them.
What a raw idea looks like
A raw idea is the first sentence you write after forcing a connection. It is usually vague, half-formed, and sometimes odd. Examples of raw ideas for the focus "Reduce the time new hires take to feel productive", using the random word "anchor":
- "Anchors hold a ship in place, so new hires need something that holds them in place."
- "An anchor is lowered at a chosen spot. Pick the spot for them."
- "An anchor is raised before the ship leaves. Maybe the support ends on a set day."
None of these is usable yet. They name a direction but give no actor, action, or timing. Development means adding that detail while keeping what made the fragment interesting.
The main risk is that an odd fragment gets pulled back toward a familiar idea. "Something that holds them in place" can quietly become "assign a buddy", which you already had. Development must keep the part of the fragment that came from the word.
The development loop
Work on one fragment at a time and move through the same four moves. You can loop back if a move fails.
Move 1: Extract the principle
A principle is the general mechanism behind the fragment, with the word's imagery removed. Ask: what is the word doing in this sentence?
For "an anchor is lowered at a chosen spot", the principle is: a fixed reference point, chosen in advance, stops drift. The ship, chain, and water are scaffolding. The principle is what transfers to your problem.
Extracting the principle first protects you from a literal reading. If you try to build "an anchor" for new hires, you end up with a logo or a team mascot. If you build "a fixed reference point chosen in advance", you can design something real.
Move 2: Restate it in focus terms
Rewrite the principle using the nouns of your problem. Replace "ship" with "new hire" and "drift" with whatever drift means here.
- Principle: a fixed reference point, chosen in advance, stops drift.
- In focus terms: a new hire has one fixed person and one fixed task, chosen before day one, so they don't spend the first weeks deciding whom to ask and what to work on.
Now you can ask whether the problem has this kind of drift. For new hires it plausibly does: early weeks often go to finding out who owns what. If the restated version doesn't describe any real part of your situation, park the idea. It can't be developed without invention.
Move 3: Make it concrete
Answer five questions in writing. If you can't answer one, that gap is the next piece of work.
| Question | Example answer for the anchor idea |
|---|---|
| Who does it? | The hiring manager, before the start date |
| What exactly is done? | Name one contact person and one starter task in the offer-day email |
| When does it happen? | Sent five days before day one; held fixed for 30 days |
| What does it need? | A starter task small enough to finish in a week, with access ready |
| How would you notice it working? | New hires ship a first change within ten working days |
The last row matters. An idea without an observable result can't be tested later, and the evaluation step will have nothing to measure.
The "raised before the ship leaves" fragment can be developed the same way. Its principle is support has a planned end. In focus terms, the fixed contact steps back at day 30 with a short handover to the team. This is a second idea, but it attaches to the first and makes the proposal more complete.
Move 4: Stress-test lightly
Do a quick check now. Save the full evaluation for the next chapter. Ask three questions:
- What must be true for this to work? Write these as assumptions.
- What is the cheapest first step that would show whether it works?
- Is there anything here that I could not do even in principle?
Assumptions for the anchor idea might be: managers have time to prepare a starter task, and a small first task is representative enough that finishing it builds confidence. Writing them down turns vague doubt into specific things to check.
If an assumption is false but fixable, return to Move 3 and change the design. If the problem is unfixable, park the idea. Parking differs from deleting: record the idea and the reason, because circumstances change and a parked idea often combines with another one later.
Tracking ideas in code
You don't need code for this step, but a small structure makes the discipline visible. The script below records each idea with its trigger word, then reports which development moves are still missing.
from dataclasses import dataclass, field
@dataclass
class RawIdea:
trigger: str # the word attribute that sparked it
spark: str # the fragment, as first written
principle: str = "" # Move 1
in_focus_terms: str = "" # Move 2
concrete: str = "" # Move 3
first_step: str = "" # Move 4, question 2
assumptions: list = field(default_factory=list) # Move 4, question 1
def gaps(self):
missing = []
for name in ("principle", "in_focus_terms", "concrete", "first_step"):
if not getattr(self, name).strip():
missing.append(name)
if not self.assumptions:
missing.append("assumptions")
return missing
idea = RawIdea(
trigger="anchor: lowered at a chosen spot",
spark="Pick the spot for the new hire.",
principle="A fixed reference point chosen in advance stops drift.",
in_focus_terms="One named contact and one starter task, fixed before day one.",
)
print("Still missing:", ", ".join(idea.gaps()))The output is Still missing: concrete, first_step, assumptions. An idea with an empty principle field is usually a literal reading of the word, and an empty assumptions field usually means nobody has checked the idea against reality yet.
Common errors in this step
- Developing the safest fragment first. You will be drawn to the fragment closest to an existing practice. Start with the strangest one that passes the Move 2 check, because the familiar ones need less help.
- Skipping the principle. Going straight from the fragment to a design keeps the word's surface features and loses the mechanism.
- Judging too early. Writing "this won't work because management won't pay" at Move 1 ends the idea before it has a shape. Record cost concerns as assumptions in Move 4 and keep going.
- Merging into a generic idea. If your concrete version reads like something from a standard onboarding checklist, you have drifted. Check that the word's principle still appears in it. A reliable test is to delete the word and see whether the idea still makes sense. If it only makes sense with the word, you are probably still too literal. If you can't tell where it came from, the idea is fine.
- Developing everything. Fragments are cheap and development takes effort. Develop three to five and park the rest with one line each.
What you should have at the end
For each developed idea you should have one short block of text that contains the principle, the restatement in focus terms, a concrete description answering the five questions, the assumptions, and a cheapest first step. Three well-developed proposals of this kind are a good result from a single random-word round. These are the input to the next chapter, where you compare them against criteria and choose.
Exercise
A team's focus is "Make our weekly status meeting shorter". Their random word is "candle", and one raw idea is "A candle burns down and then it's gone." Carry the idea through Moves 1 to 3: state the principle, restate it in focus terms, and give a concrete version that names who does what and when.
Show answer
Principle: a visible, fixed amount of a resource that runs out ends the activity at a known point. In focus terms: the meeting has a visible time allowance that runs out and ends the meeting. Concrete version: the meeting lead sets a 15-minute countdown timer on a shared screen at the start of every weekly meeting, and the meeting ends when it reaches zero, with unfinished items moved to a written update. Who: the rotating meeting lead. What: starts the timer and moves unfinished items to the written update. When: every weekly meeting. Observable result: average meeting length falls to 15 minutes within a month. A good answer also lists at least one assumption, for example that the team accepts written updates for leftover items.