Sub topic 12
Review and adjust every week
A calendar full of focus blocks is a plan, and plans drift. A weekly review is the step that checks the plan against what happened and fixes the gap. This chapter covers a 20-minute review you can repeat every week, what to measure, how to turn the results into specific changes, and the mistakes that make reviews useless.
It assumes you have already audited a week of calendar time, created recurring focus blocks that show as busy, and set up buffers. Those chapters come before this one.
Why a review is necessary
A protected schedule fails slowly. One block gets moved for a "quick sync". Another is shortened by an urgent request. After a month, the blocks are still on the calendar but nobody honors them, including you. Without a review, you only notice when an important deadline is at risk.
A review does three jobs:
- It shows whether the blocks held, using data instead of impressions.
- It finds the cause of failures, such as a wrong time of day, a block that is too long, or a recurring meeting that collides with it.
- It sets up next week before the week starts, when you still have room to choose.
The working model: a closed loop
The review has four steps: measure, diagnose, adjust, and preview. Each step feeds the next. The output of one week's review is next week's calendar, and that week produces the next review's data.
Step 1: Measure
Open last week's calendar and answer three questions for each focus block:
- Did it happen at the planned time?
- How many minutes of real focused work did you get?
- What displaced it, if it did not hold?
Record the answers in a simple list. Memory is a poor source here. People remember the one block that went well and forget the three that dissolved.
Three numbers are enough:
| Measure | How to calculate | What it tells you |
|---|---|---|
| Hit rate | Focused minutes divided by planned minutes | Whether the plan is realistic |
| Displacement count | Blocks moved, shortened, or deleted | How often protection is overridden |
| Top displacer | The most common cause of displacement | Where to apply the fix |
Step 2: Diagnose
Group the misses by cause. Most fall into a few categories:
- Collision with a meeting. Someone booked over your block, or you accepted a request. The fix is in your response rules or settings.
- Wrong placement. The block sits in a low-energy period, so you did not use it even though nothing interrupted it. The fix is to move it.
- Wrong length. A three-hour block was never filled, or a 45-minute block ended just as you got going.
- Overflow. Unplanned work consumed the day because there was no buffer.
- Avoidance. Nothing displaced the block. You did something else. This is a task problem, not a calendar problem, and usually means the task is too vague to start.
Diagnosis matters because each cause has a different remedy. If you treat every miss as a discipline failure, you will push harder at a schedule that is badly designed.
Step 3: Adjust
Change one or two things per week, not ten. Small changes let you see which one worked. Typical adjustments:
- Move a block to a different time of day.
- Shorten or lengthen a block by 30 minutes.
- Add a buffer after a meeting that routinely runs long.
- Decline or shorten a recurring meeting that keeps colliding.
- Rewrite a vague block title into a concrete deliverable.
Step 4: Preview
Look at the coming week before it begins. Check for new meetings that landed on your blocks, travel, deadlines, and holidays. Fix conflicts now, while moving a block still costs nothing. Make sure each block's title names the specific output you want, such as "Draft section 3 of the design document", not "Work".
Automating the measurement
If you log planned and actual focused minutes per block, a short script removes the arithmetic. This one needs only the Python standard library.
blocks = [
("Mon", 120, 120),
("Wed", 120, 45),
("Fri", 120, 0),
]
def review(blocks):
"""Print the hit rate per block and for the whole week."""
planned_total = 0
actual_total = 0
for day, planned, actual in blocks:
planned_total += planned
actual_total += actual
print(f"{day}: {actual}/{planned} min ({actual / planned:.0%})")
rate = actual_total / planned_total
print(f"Week: {actual_total}/{planned_total} min ({rate:.0%})")
return rate
rate = review(blocks)
if rate < 0.6:
print("Hit rate is low: change the blocks, not just your effort.")It prints:
Mon: 120/120 (100%)
Wed: 45/120 (38%)
Fri: 0/120 (0%)
Week: 165/360 (46%)
Hit rate is low: change the blocks, not just your effort.The 60% threshold is a starting point, not a rule. Choose a number that fits your job, and keep it fixed for a few weeks so you can compare.
Reading the numbers
A single week is noisy. A vacation, an incident, or a product launch can wreck the numbers for reasons unrelated to your design. Look for patterns across at least two or three weeks before making large changes.
| Pattern | Likely cause | Typical adjustment |
|---|---|---|
| Hit rate high, work still late | Blocks protect the wrong work | Revisit what deserves protection |
| Hit rate low, one weekday always fails | A recurring meeting or habit on that day | Move the block or the meeting |
| Hit rate low, no displacement recorded | Avoidance or vague tasks | Make the task concrete and smaller |
| Hit rate near 100% every week | Blocks may be too easy | Add a block or lengthen one |
| Many shortened blocks | No buffers | Add slack before and after |
Common errors
Reviewing only when things go wrong. A review that happens after a crisis turns into blame. Put it on the calendar as a recurring block of its own, at the same time each week. Friday afternoon or Monday morning both work, as long as you pick one and keep it.
Skipping the measurement. Without numbers, you change the plan based on whichever week felt worst. Spend the first five minutes on facts before making any judgment.
Changing everything at once. If you move three blocks, shorten two, and cancel a meeting, you will not know which change helped. Limit yourself to one or two changes.
Treating avoidance as a calendar problem. Moving a block does not help if you simply did not want to start the task. Break the task into a first step you can finish in 25 minutes.
Reviewing without previewing. Fixing last week does nothing if next week already has conflicts. Always end the review by scanning the coming week.
Never removing blocks. A block that failed for six weeks in a row is not protecting anything. Delete it or redesign it. A calendar cluttered with ignored blocks teaches colleagues that your blocks are optional.
A sample review
Suppose your three-hour Thursday block has failed three weeks running. You check the log and see that a team standup was moved to 09:30 on Thursdays, splitting the block into a 30-minute fragment before it and a long gap after. The block hits only 40% of its planned time.
The diagnosis is a collision, because the standup runs over and breaks the block's start. The adjustment is to move the Thursday block to start at 10:30, after a 30-minute buffer. You change only that one thing. Next week the hit rate reaches 85%, and you keep the change.
Exercise
Your focus block on Tuesday failed in each of the last three weeks, but your log shows no meetings or interruptions in that slot. Your hit rate on other days is above 80%. What is the most likely cause, and what would you change first?
Show answer
The pattern points to avoidance or a vague task, not displacement, because nothing took the time. Rewrite the Tuesday block's title as a concrete first step you can finish in about 25 minutes, and check the task is small enough to start. Change only that, and compare the hit rate over the next two weeks. If it still fails, test the placement by moving the block to a time when you have more energy.
Exercise
A colleague says they review their calendar every day and change several blocks each time. What problem does this create for learning what works, and what weekly practice fixes it?
Show answer
Frequent, many-part changes make it impossible to tell which change caused an improvement or a decline, and a single bad day can drive a bad decision. A weekly review gives enough data to see patterns, and limiting changes to one or two per week lets you attribute results to specific adjustments.