Sub topic 9
Timeline, Budget, and Responsibilities
This chapter assumes you have read the earlier chapters on objectives, strategy, key messages, and tactics. You should know your SMART objectives and have a list of tactics and channels. Here you turn that list into a schedule, a budget, and a clear map of who does what. You should also be comfortable with basic arithmetic and percentages.
A tactics list is not a plan. A plan says when each tactic happens, what it costs, and who is accountable. Without those three things, campaigns drift, overspend, or stall at handoffs.
Why this step matters
Timeline, budget, and roles constrain each other. If you shorten the timeline, you usually need more people or more money. If you cut the budget, you must drop tactics or stretch the schedule. If roles are unclear, tasks slip between people. Plan all three together and revisit each when one changes.
The concept graph for this tutorial reflects that. Tactics and channels feed into the timeline and budget. The timeline, the risk plan, and media relations then all feed into implementation. Anything you decide here becomes the working document for the running phase.
Building the timeline
Work backward from fixed dates
Start with the dates you cannot move. These are usually the objective deadline (for example, 31 March in the Greenway objective), an event or launch date, and any external deadlines such as a printing cut-off or a holiday period when journalists are unavailable.
Then work backward. For each tactic, list the tasks needed, estimate how long each takes, and note what must finish before it can start. This is a simple dependency chain. A press release cannot go out until the spokesperson has approved the quotes. The quotes cannot be approved until the data is final. The data is not final until the survey closes.
Break the campaign into phases
Most campaigns fit four phases:
- Preparation. Research is complete, assets are produced, approvals are gathered, and spokespeople are briefed.
- Launch. The main announcement or event happens, and the first wave of tactics goes out.
- Sustain. Follow-up content, pitching, events, and engagement keep the message in front of the target public.
- Close and evaluate. Final activity wraps up, post-campaign measurement runs, and the report is written.
Include time for evaluation inside the timeline. A common error is to end the schedule on the last day of activity. Then there is no time for the after survey that your measurement method requires.
Add buffers and approvals
Approvals are the most common source of delay. Legal review, executive sign-off, and client approval each take longer than people expect. Build in a fixed review window, such as two business days per approval round, and plan for two rounds on important materials.
Add a buffer of 10 to 20 percent of the schedule for tasks that depend on outside parties, such as printers, venues, and journalists. Place the buffer before fixed deadlines, not at the end of the campaign.
Note the example: the objective deadline is 31 March, but the after survey must fit in the schedule. The survey field work should be done by 31 March for the objective to be measured by that date. In practice, plan the survey to run in the final two weeks of March, and treat the report as a later task.
Building the budget
Start from the tactics
Build the budget from the bottom up. List every tactic, then list every cost that tactic creates. Add them together. Compare the total with the money available. If the total is higher, you cut or change tactics. You do not squeeze each line equally.
Common cost categories
| Category | Examples | Notes |
|---|---|---|
| Staff time | Hours for writers, planners, and spokespeople | Often hidden. Include it even when staff are salaried. |
| Production | Design, video, printing, photography | Get quotes early. Rush fees are expensive. |
| Distribution | Wire service, paid social, email platform | Usually priced by volume or reach. |
| Events | Venue, catering, equipment, permits | Check for minimum spend and deposits. |
| Research and measurement | Surveys, media monitoring, analytics tools | Budget for both the before and after measurements. |
| Contingency | Reserve for surprises | Typically 5 to 15 percent of the total. |
Protect the measurement budget
Measurement is often cut first because it produces no visible activity. That is a mistake. Without a before-and-after survey, the Greenway objective of moving awareness from 18% to 30% cannot be shown. A rule of thumb used in many organizations is to reserve a small share of the total, often 5 to 10 percent, for research and evaluation. Treat that figure as a starting point and adjust it to your needs.
A worked budget
The code below checks a budget against a ceiling and calculates the contingency and the measurement share. It runs as shown.
budget_ceiling = 40000
lines = {
"Staff time": 12000,
"Production": 8000,
"Distribution": 6000,
"Events": 5000,
"Research and measurement": 3500,
}
subtotal = sum(lines.values())
contingency = round(subtotal * 0.10)
total = subtotal + contingency
measurement_share = lines["Research and measurement"] / total * 100
print(f"Subtotal: {subtotal}")
print(f"Contingency (10%): {contingency}")
print(f"Total: {total}")
print(f"Measurement share: {measurement_share:.1f}%")
print("Within ceiling" if total <= budget_ceiling else "Over ceiling")With these figures the subtotal is 34,500, the contingency is 3,450, and the total is 37,950. Measurement is about 9.2 percent of the total, and the plan fits under the 40,000 ceiling. If the total were over the ceiling, you would remove a tactic or reduce its scope. You would not reduce the measurement line below what you need to answer your objective.
Tracking spend
Keep a simple table with three columns for each line: planned, committed, and actual. Committed means money you have promised through a purchase order or contract but not yet paid. Many overspends happen because people look only at actual spend and forget commitments.
Assigning responsibilities
Name one owner per task
Each task needs one person who is accountable. Shared ownership usually means no ownership. Other people may help, but one name goes in the owner column.
A common tool is a responsibility matrix, often called RACI. Each task is marked with one of four letters for each person:
- R (Responsible): does the work.
- A (Accountable): owns the result and signs it off. Only one A per task.
- C (Consulted): gives input before the work is done.
- I (Informed): is told after decisions are made.
| Task | Campaign lead | Writer | Media officer | Spokesperson | Executive sponsor |
|---|---|---|---|---|---|
| Approve key messages | R | C | C | C | A |
| Draft press release | A | R | C | C | I |
| Pitch journalists | C | I | A and R | C | I |
| Media interviews | C | I | R | A and R | I |
| Run after survey | A | I | I | I | I |
In the table, "A and R" means the same person both does the work and owns the result. This is normal for small tasks. The "Run after survey" row shows a gap you should fix: the lead is accountable, but nobody is marked responsible. Always check that every row has at least one R and exactly one A.
Include spokespeople and approvers
Roles are not only for staff. List your spokespeople, their availability, and any media training they need. List every approver and the turnaround time they have agreed to. Those turnaround times feed directly into the timeline.
Define communication routines
Agree how the team stays in sync. A short weekly status meeting, a shared tracker, and a named person who can make decisions when the lead is away are usually enough. Decide in advance who may approve small spending changes and who must be asked.
Common errors
- Ending the schedule at launch. Sustain and evaluation phases are left out, so there is no time or money for them.
- Ignoring approval time. Tasks are scheduled back to back with no room for review.
- Forgetting staff time. The campaign looks cheap because internal hours are not counted.
- No contingency. Any surprise forces cuts to tactics or measurement.
- Several owners for one task. Everyone assumes someone else is handling it.
- Plans that never change. A timeline is a working tool. Update it when dates move, and record why.
Linking to the next steps
The timeline, budget, and responsibility matrix are inputs to implementation. They give you the baseline against which you monitor progress. In the next chapters you will plan for risk, which adds contingency tasks and owners to this plan, and then define the measurement framework that fixes which results are collected and when.
Exercise
A campaign has a 25,000 budget ceiling. Planned lines are staff time 9,000, production 5,000, distribution 4,000, events 2,500, and research and measurement 2,000. You want a 10 percent contingency calculated on the subtotal. (a) What is the total, and does it fit? (b) What share of the total is measurement? (c) The sponsor asks you to cut research to 500 to make room for a larger event. What problem does this create?
Show answer
(a) The subtotal is 22,500. Contingency is 2,250. The total is 24,750, which fits under 25,000. (b) Measurement is 2,000 / 24,750, about 8.1 percent. (c) With only 500 you may not be able to run the before-and-after survey, so the awareness objective could not be measured and results could not be reported against it. A better option is to reduce the event scope.
Exercise
In a RACI table, the task "Brief spokespeople" has the campaign lead marked R, the media officer marked R, and both the lead and the executive sponsor marked A. What two problems does this show, and how do you fix them?
Show answer
First, there are two A entries, so accountability is unclear. Keep one, for example the campaign lead. Second, two people are marked R without a clear split of work, which risks duplicated or missed effort. Either make one person responsible and the other consulted, or divide the task into separate rows. The sponsor can be changed to I or C.