Sub topic 7
Availability check and delivery scheduling
This chapter assumes you know the sales order structure (header, items, schedule lines) and the organizational units from earlier chapters. It covers how SAP decides what it can promise to a customer and when.
What the availability check does
The availability check, also called ATP (available-to-promise), runs when you save or change a sales order item. It compares the requested quantity with the stock and planned receipts of the material, then writes the result into the schedule lines of the item.
The check looks at the plant of the item. It counts stock and planned receipts such as purchase orders and production orders. It subtracts planned issues such as other sales orders and reservations.
Where the check is controlled
Three settings decide whether and how the check runs:
| Setting | Where it lives | Effect |
|---|---|---|
| Checking group | Material master, MRP 3 view | Selects which stock and receipts count, per MRP area or plant |
| Checking rule | Combination of transaction (sales order) and checking group | Chooses the scope of the check for that business transaction |
| Requirements class | Determined from the item category and the material's requirements type | Switches the availability check on or off for the item |
If the requirements class does not allow the check, the order simply confirms the requested quantity on the requested date.
Delivery scheduling
Scheduling works out dates by working backward from the customer's requested delivery date. SAP subtracts these times in order:
- Transportation time, from the route.
- Loading time, from the shipping point and route.
- Pick/pack time, from the shipping point.
- Transportation planning time, from the route.
The result is the material availability date. The ATP check runs against that date. If the material is not available then, SAP looks for the next date it can be confirmed.
If backward scheduling finds a date in the past, SAP switches to forward scheduling. It starts from today and adds the times to get a later delivery date.
Reading the result
A sales order item can have several schedule lines. For example, a request for 100 pieces with only 60 in stock can give one line for 60 on the requested date and a second line for 40 on the date of the next receipt. The delivery proposal then depends on the delivery rules, such as complete delivery, which can force one line for the full quantity on the later date.
Common errors
- Confirmed quantity is zero because the checking group is missing or set to no check.
- Wrong dates because route or shipping point times are not maintained.
- Unexpected shortages because the check counts stock that is blocked or reserved, depending on the checking rule.
- Orders confirm but cannot be delivered because the delivery uses a different plant or storage location than the order.
Exercise
A customer asks for delivery on 20 June. Transportation takes 3 days, loading takes 1 day, pick/pack takes 1 day, and transportation planning takes 2 days (all working days, ignoring weekends). On which date does SAP run the availability check, and what happens if that date is already in the past?
Show answer
SAP subtracts 3 + 1 + 1 + 2 = 7 days from 20 June, so the material availability date is 13 June and the check runs against that date. If 13 June is already past, SAP switches to forward scheduling. It starts from today, adds the same times, and proposes a later delivery date.